1616 Reminc Ltd. Partnership v. Atchison & Keller Co., 82-1284

Decision Date14 April 1983
Docket NumberNo. 82-1284,82-1284
CourtU.S. Court of Appeals — Fourth Circuit
Parties8 Collier Bankr.Cas.2d 467, 10 Bankr.Ct.Dec. 763, Bankr. L. Rep. P 69,277 1616 REMINC LIMITED PARTNERSHIP, Appellant, v. ATCHISON & KELLER COMPANY; Atchison & Keller, Inc.; Roland E. Kinser; Tony Yaksh; Peerless Insurance Company; Appellees. In re 1616 REMINC LIMITED PARTNERSHIP, Debtor.

Mark C. Ellenberg, Washington, D.C. (Stephen N. Shulman, Cadwalader, Wickersham & Taft, Washington, D.C., James A. Newell, Arlington, Va., Holywell Corp., Miami, Fla., on brief), for appellant.

Mark P. Friedlander, Arlington, Va. (Friedlander & Brooks P.C., Robert C. Coleburn, Simmonds, Coleburn & Towner, Arlington, Va., Alexander M. Heron, Holland & Knight, Washington, D.C., on brief), for appellees.

Before WINTER, Chief Judge, CHAPMAN, Circuit Judge, and HAYNSWORTH, Senior Circuit Judge.

HARRISON L. WINTER, Chief Judge:

The issue presented by this case is whether Rule 810, Rules of Bankruptcy Procedure, unconstitutionally transfers the exercise of "the judicial power" of the United States from an Article III court to a non-Article III bankruptcy referee 1 sitting under the 1898 Bankruptcy Act, by limiting the district court to the "clearly erroneous" standard when reviewing a compulsory breach of contract counterclaim adjudicated in the bankruptcy court. We hold that it does, and therefore remand to permit independent fact-finding by the district court. Because the other issues raised on appeal, with one exception noted below, infra note 10, are intertwined with the district court's reconsideration on remand, we do not reach them. We also conclude that our holding must apply only prospectively.

I.

1616 Reminc Limited Partnership (Reminc) is a debtor-in-possession in a Chapter XII proceeding begun in 1975. Its principal asset is a Rosslyn, Virginia, office building which it commissioned to be built in 1973 by CITCON Corporation. CITCON in turn executed a standard form subcontract with Atchison & Keller Company (A & K) for installation of a heating, ventilation and air conditioning (HVAC) system in the building. A & K's duties included construction of a chamber in which circulating air is heated over electrical elements known as reheat coils before being pumped throughout the building. Reset switches designed to detect overheating of the reheat coils were incorporated into the assembly to prevent irreparable damage to the coils. The subcontract and plans called for A & K to install two reset switches, one automatic and the other manual, and designated four possible approved suppliers of parts for the overall system.

When operating properly, the automatic reset switch would shut off the reheat coils if they began to overheat, allow cooling, then reactivate the coils, so as to provide uninterrupted heating to the building. The manual reset was planned as a back-up safety feature. The system originally installed in Reminc's building, however, failed to work as planned. The major problem was that the manual reset switch consistently activated before the automatic, leaving tenants without heat until maintenance personnel could reset the manual switches in each of the numerous air outlets throughout the system. Reminc lost tenants and eventually sought bankruptcy protection, filing its initial petition in August 1975.

A & K subsequently filed a proof of claim based upon a purported mechanic's lien against the office building. Reminc objected to the claim and, on July 22, 1976, filed a compulsory counterclaim alleging breach of contract 2 against A & K, its principals, and its surety Peerless Insurance Company.

After dismissal of A & K's claim, Reminc's contract action proceeded to trial before the bankruptcy referee, who found against Reminc on motion for directed verdict. On appeal, the district court reversed and remanded for additional fact-finding. Further proceedings were conducted on January 27, 1981. The referee again denied Reminc relief, relying primarily on a factual finding that the cause of the reset switches' malfunctioning was another subcontractor's faulty construction of the airshaft leading to the heating chamber, and not A & K's workmanship nor material selection. 3 The district court affirmed on February 17, 1982, deferring to the bankruptcy court's election "not to give full credence to Reminc's evidence" which the district court understood to be the referee's "prerogative in view of the conflict in the evidence."

II.

Before us Reminc ascribes many errors to the proceedings below, among them the district court's adherence to the "clearly erroneous" standard of review found in Rule 810 of the Rules of Bankruptcy Procedure. Essentially, Reminc argues that application of Rule 810 here resulted in its compulsory 4 breach of contract counterclaim being fully adjudicated in the first instance by a concededly non-Article III official 5 without the possibility of independent fact-finding by the district court. It contends that adjudication of its claim by an Article I judge under these circumstances violates principles of Article III jurisprudence. Reminc does not attack the power of bankruptcy referees under the 1898 Bankruptcy Act 6 generally, but only adjudications in cases such as this involving common law contract claims and turning on questions of fact. Because of our disposition of this constitutional challenge to Rule 810, we do not reach the merits of Reminc's other claims. 7

A.

We begin by considering the effect of Rule 810 in this case. Rule 810 states:

Upon an appeal the district court may affirm, modify, or reverse a referee's judgment or order, or remand with instructions for further proceedings. The court shall accept the referee's findings of fact unless they are clearly erroneous, and shall give due regard to the opportunity of the referee to judge the credibility of the witnesses.

13 Collier on Bankruptcy 8-77 (14th ed. 1977). The rule requires " 'the same effect to be given the referee's findings as Rule 52(a) of the Federal Rules of Civil Procedure accords to the findings of the trial court.' " Id. at p 810.01, quoting Advisory Committee's Note to Rule 810. This limitation on review of referee fact-finding perpetuates the "clearly erroneous" standard of former Gen. Order in Bankruptcy No. 47, 305 U.S. 679 (1935); indeed, when General Order 47 was revised into Rule 810, the provision allowing the district judge to "receive further evidence" was abandoned, strengthening the degree of deference. 2A Collier on Bankruptcy p 39.28 (14th ed. 1978).

We have long given effect to this standard, and we have not hesitated to reverse where a district court too readily substituted its view of the facts for the bankruptcy court's, particularly where witness credibility played a role in the referee's decision. See, e.g., Melichar v. Ost, 661 F.2d 300 (4 Cir.1981), cert. denied, 456 U.S. 927, 102 S.Ct. 1974, 72 L.Ed.2d 442 (1982); Mountain Trust Bank v. Shifflett, 255 F.2d 718, 720 (4 Cir.1958); Mutual Savings & Loan Association v. McCants, 183 F.2d 423, 426-27 (4 Cir.1950). 8 Reminc's constitutional challenge to Rule 810 manifestly is an unanticipated one raising issues of first impression.

B.

We consider next if we should address the issue. Reminc suggests that Rule 810's unconstitutionality follows inexorably from the holding and the principles articulated in Northern Pipeline Construction Co. v. Marathon Pipeline Co., --- U.S. ----, 102 S.Ct. 2858, 73 L.Ed.2d 598 (1982). But A & K, in arguing that we should not decide the issue, correctly points out that the Marathon Pipeline Court expressly stayed the effect of its decision first until October 4, 1982, --- U.S. at ----, 102 S.Ct. at 2880, and subsequently until and including December 24, 1982, --- U.S. ----, 103 S.Ct. 200, 74 L.Ed.2d 160, at which point the decision began to apply only prospectively. --- U.S. at ----, 102 S.Ct. at 2880. The Court foresaw that general retroactive application of its holding "would surely visit substantial injustice and hardship upon those litigants who relied upon the Act's vesting of jurisdiction in the bankruptcy courts." Id. A & K therefore argues that we should not address this issue.

We do not think that we should decline decision now. First, this case does not present the same issue decided in Marathon. Even though the principles invoked and applied in Marathon are the same which govern decision here, Marathon dealt with only the powers of bankruptcy judges under the 1978 Bankruptcy Act. We are concerned with the validity of a rule promulgated under the 1898 Bankruptcy Act. Second, Reminc's challenge to the validity of the rule was initiated and argued prior to the decision in Marathon. 9 Reminc therefore is not now before us claiming a windfall from any change in the law wrought by Marathon. Cf. Ramey v. Harber, 589 F.2d 753 (4 Cir.1978), cert. denied, 442 U.S. 910, 99 S.Ct. 2823, 61 L.Ed.2d 275 (1979). Whatever Marathon may teach with respect to retroactive and prospective application of what we decide, we think that it would be inequitable to deprive Reminc of its prescience in discerning the constitutional infirmity in Rule 810 when the rule is applied in the context of this case.

C.

Turning to the merits, we note first that the degree to which plenary power to adjudicate traditional common law contract claims may be vested in a federal tribunal without full Article III trappings has never been fully defined. In Katchen v. Landy, 382 U.S. 323, 86 S.Ct. 467, 15 L.Ed.2d 391 (1966), decided before Rule 810 abrogated General Order 47 and thereby jettisoned district court de novo fact-finding, the Article III issue was not addressed. Instead, the Court at most held that a bankruptcy court could adjudicate in summary fashion the claims of a creditor and counterclaims against the creditor generally without violating the Seventh Amendment's guarantee to a trial by jury. Si...

To continue reading

Request your trial
43 cases
  • Harbour, In re
    • United States
    • U.S. Court of Appeals — Fourth Circuit
    • March 2, 1988
    ...Carbide Agricultural Products Co., 473 U.S. 568, 105 S.Ct. 3325, 3334-35, 87 L.Ed.2d 409 (1985); 1616 Reminc Limited Partnership v. Atchison & Keller, 704 F.2d 1313, 1318 n. 15 (4th Cir.1983).8 Under 11 U.S.C. Sec. 547(b), the trustee can avoid as preferences certain transfers made within 9......
  • Glen Ridge I Condominiums, Ltd. v. Federal Sav. and Loan Ins. Corp.
    • United States
    • Texas Court of Appeals
    • December 30, 1986
    ...Administrative Agencies, and the Northern Pipeline Decision, 1983 Duke L.J. 197 (1982); see also 1616 Reminc Limited Partnership v. Atchison & Keller Company, 704 F.2d 1313, 1316 (4th Cir.1983). We have, however, found guidance in two decisions of the United States Supreme In Northern Pipel......
  • In re LT Ruth Coal Co., Inc., Bankruptcy No. 84-00197
    • United States
    • United States Bankruptcy Courts. Tenth Circuit. U.S. Bankruptcy Court — Eastern District of Kentucky
    • May 14, 1986
    ...III. In support of this proposition the Department cites In re Morrissey, 717 F.2d 100 (3rd Cir.1983); 1616 Reminc Ltd. Partnership v. Atchison & Keller, 704 F.2d 1313 (4th Cir.1983); Montana Power Co. v. Environmental Protection Agency, 608 F.2d 334 (9th Cir.1979); General Committee of Adj......
  • Jones, In re
    • United States
    • U.S. Court of Appeals — Tenth Circuit
    • November 5, 1986
    ...the Northern Pipeline decision was designed to protect. Wilson cites the Fourth Circuit's decision in 1616 Reminc Limited Partnership v. Atchison & Keller Co., 704 F.2d 1313 (4th Cir.1983). Remic held that Rule 810 of the Rules of Bankruptcy Procedure, which directs the district court to up......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT