Person v. Cauldwell-Wingate Co.

Decision Date05 July 1949
Docket NumberNo. 250,Docket 21311.,250
Citation176 F.2d 237
PartiesPERSON v. CAULDWELL-WINGATE CO. et al.
CourtU.S. Court of Appeals — Second Circuit

Before L. HAND, Chief Judge, and AUGUSTUS N. HAND and FRANK, Circuit Judges.

Louis A. D'Agosto, New York City, for appellant.

John F. X. McGohey, U. S. Atty., New York City (Louis Mansdorf, Asst. U. S. Atty., New York City, of counsel), for Cauldwell-Wingate Co. and another.

Robert R. Rosan, Port Chester, N. Y., for Portchester Electrical Construction Co.

Writ of Certiorari Denied November 21, 1949. See 70 S.Ct. 189.

L. HAND, Chief Judge.

The plaintiff, who is administratrix of her husband, William S. Person, has appealed from a judgment, dismissing her complaint to recover damages for the death of the intestate through the negligence of the three defendants. The decedent was an electrical linesman in the employ of other persons and was killed on August 6, 1946, while at work in an army camp in the County of Rockland, New York. The jurisdiction of the court depends upon diversity of citizenship. Since at the close of the plaintiff's case the judge dismissed the complaint because the evidence would not support a verdict, it will be necessary to state the facts in some detail. Person was killed after he had climbed to the upper part of "Pole 1422," where he was about to "tap" in a service wire. While in position on the pole he took hold of the upper one of two "guy" wires which led from the pole to the ground, and which had been set up to support the pole against lateral thrusts. This wire chanced to be in electrical contact with a main transmission wire carrying a high voltage, and the current passed through Person's body to the ground, killing him instantly. In 1942 the War Department had awarded a contract to the defendants, Cauldwell-Wingate Company and the Poirier & McLane Company, for the construction of the camp, and these companies — which we shall speak of together as the Contractors — had let out the stringing of the high tension wires throughout the camp to the defendant, Portchester Company, which we shall call the Sub-Contractor. A local company had furnished and set in place "Pole 1422" before the work began, and on March 18, 1943, the Sub-Contractor strung one high tension wire to one side of the pole and fastened it in place with proper insulation. It then strung another such wire away from the other side of the pole, to which it was similarly fastened and insulated. In order to complete the electrical connection between these two sections of high tension wire, the Sub-Contractor then passed a section of bare wire, called a "jumper," around the pole and fastened one end to one section of the high tension wire, and the other end to the other section, allowing enough slack in the "jumper" not to touch the pole. Whether because of the axial turning in the wind of the high tension wires, or because the "jumper" sagged down of itself, it came into contact with the top of a metal plate which fastened the end of the upper "guy" wire to the pole. Although the lower end of this "guy" wire was insulated, when Person took hold of it near the plate he completed a circuit to the ground. There was testimony which would have supported a verdict that such an installation of the "jumper" was negligent construction, if the upper "guy" wire was in place when the Sub-Contracter installed the "jumper"; and we think that it was also negligent, if the upper "guy" wire was set up between March 18 and May 15, when it delivered the work to the Contractors or to the Army authorities, for it was charged with a duty to inspect the work for any changes which might have been made until it surrendered control.

Although the evidence is not indubitable that the upper "guy" wire had been set in place before May 15, 1943, it seems to us that the plaintiff did make out a case on that issue which should have been submitted to the jury. Burton, an electrician foreman employed by the War Department, testified that he began to work at the camp in August, 1943; and that from the time he arrived until Person's death, no change had been made on "Pole 1422." Therefore, unless the upper of the two "guy" wires was put in place between May 15, 1943, and August 31, 1943, the evidence was sufficient to support a verdict against the Sub-Contractor. Moreover, this period may be further reduced to the two months of July and August. "At the end of the job between June and July" six persons made a survey of the whole work done by the Sub-Contractor for the purpose of determining what it had earned under its contract, for it was to be paid "on a unit price basis." These six were two engineers of the Contractors, one of the Sub-Contractor, "a representative of the Army" and two others whose principals are not disclosed. They went "from pole to pole to determine how many different objects were attached to the various poles," and it is certainly a reasonable inference that they had with them Exhibit 4, which was a map of "the job as it was when it was completed." It is dated June 30, 1943, and "Pole 1422" appears on it as an "existing pole," which accords with the testimony that it had been set up by the local company before the Sub-Contractor began any work. Moreover, the symbols upon the map indicate that the Sub-Contractor had not set up any "down guys" on that pole, although it was so situated that one such "guy" would certainly have been needed, and more probably two. Indeed, the president of the Sub-Contractor had a faint recollection that one had been set up, although not by his company.

Thus, the only hiatus in the plaintiff's evidence is that she failed to prove that someone had not set up the upper "guy" wire on "Pole No. 1422" between July 1st and — at the latest — August 31st. That, it must be confessed, is a possibility, but it seems to us to be improbable enough to sustain a finding by a jury that the wire was not set up during that period. The work had just been turned over to the Army, whose engineer had made a detailed inspection which satisfied him. The alternative to supposing the upper "guy" wire was then in place is to suppose that later an Army engineer thought the support of that pole insufficient, and set up the upper wire. It was improbable that the same engineer who had originally passed the installation should have changed his mind; and it is also improbable that, during those two months, it should have been thought necessary to direct another engineer to make a second "pole by pole" examination in detail, and to conclude that the first engineer had been mistaken. For these reasons we hold that the evidence permitted the jury to find that the upper "guy" wire was in place when the Sub-Contractor installed the "jumper."

The Contractors claim immunity from any negligence of the Sub-Contractor under the doctrine that an owner or a contractor, who has employed a competent sub-contractor, is not liable for his defaults.1 That is the law of New York2 as elsewhere; and, as elsewhere, it is subject to exceptions, one of which is that when the owner or contractor exercises supervision over the sub-contractor's performance, he is liable.3 We can find no evidence in the record that in the case at bar the Contractors did exercise supervision over the performance of the Sub-Contractor; and we reject this as a ground for holding them. Indeed, the plaintiff suggests the contrary with little conviction. What she particularly invokes is another exception, which is that the owner or contractor is under a duty to supervise his sub-contractor's performance, although he may not have voluntarily assumed it, if the work is "inherently dangerous;4 and there can be no question that a jury would be justified in finding that the rigging of a "jumper" so near an upper "guy" wire, fell within that phrase. In such cases the law imposes the duty of inspection upon the owner or contractor in invitum, and forbids him to delegate it, just as it does when a statute or an ordinance directly imposes such a duty.5 Often the factor which appears particularly to determine "the inherent danger" is the proximity of the work to a highway, since it is then more likely that any mischance will do harm, but these are merely instances of the general doctrine. Nor are the decisions anomalous which hold that the duty to inspect upon such occasions does not extend to matters "collateral" to the work itself.6 These do not concern the existence of the duty to inspect, but the extent of the inspection required. They only mean that the owner or the contractor need not follow the progress of the work in the details of its execution. For the foregoing reasons we hold that, if the jury found the Sub-Contractor liable, it might also find the Contractor liable.

We have assumed hitherto that the occasion at bar should be judged by decisions in which the injury happened during the progress of the work, and not, as here, after it had been turned over to the owner. That appears to us an altogether proper step to take. Certainly it is true that the same duty towards a "business visitor" which is imposed upon the owner of land is imposed upon an...

To continue reading

Request your trial
22 cases
  • United New York Sandy Hook Pilots Ass'n v. Rodermond Indus.
    • United States
    • U.S. Court of Appeals — Third Circuit
    • March 22, 1968
    ...Erickson, 352 F.2d 425 (C.A.8, 1965); Fegles Construction Co. v. McLaughlin-Construction Co., 205 F.2d 637 (C.A.9, 1953); Person v. Cauldwell-Wingate Co., 176 F.2d 237 (C. A.2), cert. denied, 338 U.S. 886, 70 S.Ct. 189, 94 L.Ed. 544 V Rodermond contends that if it violated a contractual obl......
  • Littlehale v. EI du Pont de Nemours & Co.
    • United States
    • U.S. District Court — Southern District of New York
    • May 11, 1966
    ...the plans "were not so patently dangerous that competent electrical engineers would have thought them improper." Person v. Cauldwell-Wingate Co., 176 F. 2d 237, 241 (2d Cir.), cert. denied, 338 U.S. 886, 70 S.Ct. 189, 94 L.Ed. 544 The within concept of contract specification defense, though......
  • Tauscher v. Puget Sound Power and Light Co.
    • United States
    • Washington Supreme Court
    • October 15, 1981
    ...which control public service corporations imply that duty, or upon the theory of nondelegable duty as expressed in Person v. Cauldwell-Wingate Co., 176 F.2d 237 (2d Cir. 1949), and in Snyder v. Southern Cal. Edison Co., 44 Cal.2d 793, 799-80, 285 P.2d 912 (1955), quoting from F. Harper, The......
  • Todd Shipyards Corp. v. Turbine Service, Inc.
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • April 29, 1982
    ...It is true that "... a contractor, who has employed a competent subcontractor, is not liable for his faults," Person v. Cauldwell-Wingate Co., 176 F.2d 237, 239-40, (2nd Cir. 1949), cert. denied, 338 U.S. 886, 70 S.Ct. 189, 94 L.Ed. 544 (1949), but the evidence here bears out forcefully the......