Weimar v. Yacht Club Point Estates, Inc., 1473

Decision Date29 May 1969
Docket NumberNo. 1473,1473
Citation223 So.2d 100
PartiesRolf E. WEIMAR, Appellant, v. YACHT CLUB POINT ESTATES, INC., a Florida corporation, and C. E. Abrams d/b/a Abrams Flooring Company, Appellees.
CourtFlorida District Court of Appeals

John R. Young, of Hamilton & James, West Palm Beach, for appellant.

Zell H. Altman, Lake Worth, for appellee Abrams.

CROSS, Judge.

Appellant-plaintiff, Rolf E. Weimar, appeals an order entered with prejudice denying plaintiff leave to file a fourth amended complaint against the appellee-defendant, C. E. Abrams doing business as Abrams Flooring Company. We affirm.

The pertinent parts of the complaint appertaining to the Defendant-Abrams is in three counts. The first count in essence alleges that the plaintiff entered into a written contract with the defendant building contractor, Yacht Club Point Estates, Inc., to construct a dwelling house for the plaintiff in return for a stated consideration, and that under the terms of the above mentioned contract the house was to be of C.B.S type construction and was to have hardwood and vinyl flooring throughout. It is alleged that the building contractor orally entered into a subcontract with the defendant-subcontractor Abrams to install the above mentioned hardwood and vinyl flooring in the plaintiff's home, and that the oral contract between the contractor and the subcontractor was for the benefit of the plaintiff, thus making the plaintiff a third party beneficiary of that contract. The first count further alleges that the subcontractor breached the oral contract with the building contractor, to which plaintiff was a third party beneficiary, by doing the floor in an improper and unworkmanlike manner; to wit, said subcontractor failed to properly ascertain whether the concrete slab over which the flooring was laid was moisture-free, a precaution which was necessary to see that the slab was a proper surface over which to lay hardwood and vinyl flooring, and that as a direct and proximate result of the subcontractor's breach of contract the plaintiff incurred expenses and damages in a specified sum.

Count two alleged that the subcontractor was negligent in laying the abovementioned flooring in the plaintiff's home by failing to ascertain whether the concrete subfloor was moisture-free, which precaution was necessary to see that the slab was a proper surface over which to lay the flooring and which precaution was required by the installation instructions accompanying the type of flooring which was used; that the subcontractor had a duty to the plaintiff to take these precautions by virtue of the plaintiff's status as a third party beneficiary to the contract between the building contractor and the subcontractor, and also by virtue of the fact that having undertaken to do the job in the plaintiff's home, the subcontractor undertook a correlative duty to do such job in a non-negligent manner in performing the flooring subcontract; that as a proximate result of the subcontractor's breach of contract and negligence, plaintiff had to remove the flooring and install other floor covering; that the plaintiff's house was thereby damaged and devalued, causing the plaintiff to suffer specified damages.

The third count alleges that by virtue of the plaintiff's inquiring of the subcontractor as to the feasibility of laying the designated hardwood and vinyl flooring throughout the house, the subcontractor warranted to the plaintiff that the flooring to be used was of merchantable quality. Count three further alleges a breach of the aforementioned express warranty in that the flooring after having been placed in the plaintiff's house became badly discolored and individual squares of the flooring became loose, thus rendering the entire floor unfit for the purpose for which it was intended, and that as a direct and proximate result of the above mentioned breach of express warranty the plaintiff suffered specified damages.

The court denied leave to file the fourth amended complaint on the ground it failed to state a cause of action; hence, this appeal.

We have for determination the sole question of whether the complaint states facts sufficient to state a cause of action against the Defendant-Abrams. First to be considered is the fact that there is no contract involved in which the plaintiff, Rolf E. Weimar, is a party. The oral agreement referred to in the complaint is between the defendant, Yacht Club Point Estates, Inc., and the defendant, C. E. Abrams doing business as Abrams Flooring Company.

Florida has long recognized the propriety of a third party beneficiary who is not a party to a contract suing for damages as the result of the acts of one of the parties to the contract. Mugge v. Tampa Water Works Co., 1906, 52 Fla. 371, 42 So. 81, 6 L.R.A.,N.S., 1171; Woodbury v. Tampa Water Works Co., 1909, 57 Fla. 243, 49 So. 556, 21 L.R.A.,N.S., 1034; Di Camillo v. Westinghouse Electric Corp., Fla.App.1960, 122 So.2d 499; Morse v. Hendry Corporation, Fla.App.1967, 200 So.2d 816.

Cases are uniform that in order to sustain an action instigated by a party beneficiary, the plaintiff must plead the contract which was expressly for his benefit and one under which it clearly appears that he was a beneficiary. Cedillo v. Standard Oil Co. of Texas, 5 Cir. 1961, 291 F.2d 246; Southern California Gas Co. v. A B C Construction Company, 1962, 204 Cal.App.2d 747, 22 Cal.Rptr. 540; McCann Plumbing Company v. Plumbing Industry Program, Inc., Fla.App.1958, 105 So.2d 26.

In the instant case, the plaintiff has alleged that the defendant, Yacht Club Point Estates, Inc., orally employed and contracted with Abrams to do the flooring. There are no allegations in the complaint illustrating the terms of the oral agreement between the two defendants and how those terms inure to the benefit of the plaintiff as a third party beneficiary to the contract, nor are there any allegations as to whether there was an intent by the two defendants to so benefit the plaintiff. The written contract between the plaintiff and the building contractor, to which the plaintiff refers as having spawned the oral agreement between the building contractor and the subcontractor, has not been included in the record on appeal and by its absence we are further unable to ascertain whether by virtue of it the contract between the two defendants was for the benefit of the plaintiff. Since the allegations of count one consist of merely legal conclusions, the trial court was eminently correct in determining that it failed to state a cause of action.

The essence of the allegations in count two assert that Abrams was under a duty to the plaintiff to install the said flooring in a non-negligent manner, and that this duty to the plaintiff arose by virtue of the oral contract mentioned in count one by which the plaintiff was a third party beneficiary.

While it has been frequently declared to be a rule that no cause of action in tort can arise from a breach of a duty existing by virtue of contract, on the other hand a contractual relation between the parties is not necessary to the existence of a duty the violation of which may constitute actionable negligence where the relation which is requisite to the existence of a duty to exercise due care is to be found in something else. 38 Am.Jur., Negligence, § 21.

The true question in any case involving tort liability is, 'Has the defendant committed a breach of duty apart from the contract?' If he has only committed a breach of contract, he is liable only to those with whom he has contracted; but if he has committed a breach of duty apart from the contract, he is not protected by setting up a contract in respect of the same matter with another person. Aetna Insurance Company v. Illinois Central Railroad Co., 1936, 365 Ill. 303, 6 N.E.2d 189, cert. dism. 302 U.S. 652, 58 S.Ct. 269, 82 L.Ed. 505.

In the instant case, the only allegations of a duty asserted to have been breached by the person charged with the negligence is the duty created by contract. Since there are no allegations of a breach of a duty apart or independent from the contract, privity of contract must exist between the person charged with the negligence and the person who has been injured by such breach. Sufficient allegations showing that a contract was made for the benefit of the person who has been injured by the breach would by operation of law create the necessary privity between the person charged with negligence and the person who has been injured to establish a binding legal obligation. Calder v. Richardson, S.D.Fla.1935, 11 F.Supp. 948.

Since recovery on a third party beneficiary contract is a recovery on the contract itself, 1 the right of the beneficiary being no greater than if the contract were in force between the nominal parties, 2 it behooves one seeking to establish a cause of action as a third party beneficiary to sufficiently allege the terms and provisions of the contract which he asserts was made for his benefit. Failure to...

To continue reading

Request your trial
35 cases
  • Indemnity Ins. Co. v. American Aviation
    • United States
    • Florida Supreme Court
    • December 23, 2004
    ...additional conduct which amounts to an independent tort that such breach can constitute negligence"); Weimar v. Yacht Club Point Estates, Inc., 223 So.2d 100, 103 (Fla. 4th DCA 1969) ("[N]o cause of action in tort can arise from a breach of a duty existing by virtue of The application of th......
  • Ginsberg v. Lennar Florida Holdings, Inc.
    • United States
    • Florida District Court of Appeals
    • October 5, 1994
    ...losses, Florida law does not allow recovery in tort without a claim for personal injury or property damage); Weimar v. Yacht Club Point Estates, 223 So.2d 100 (Fla.1969) (where defendant has not committed a breach of duty apart from breach of contract there can be no action in tort); Swaebe......
  • Masonite Corp. Hardboard Siding Prods. Litigation
    • United States
    • U.S. District Court — Eastern District of Louisiana
    • September 16, 1998
    ...fails for lack of reliance. Plaintiff concedes that reliance is required to state a claim for breach of an express warranty. See Weimar, 223 So.2d at 104. It is undisputed that the homeowners did not rely on the defendant's express limited warranty. The only homeowners identified by plainti......
  • Thompson v. Commercial Union Ins. Co. of New York
    • United States
    • Florida Supreme Court
    • July 12, 1971
    ...contract may sue for damages sustained as the result of the acts of one of the parties to the contract. See Weimar v. Yacht Club Point Estate, Inc., 223 So.2d 100 (Fla.App.4th, 1969); Morse v. Hendry Corporation, 200 So.2d 816 (Fla.App.2d, 1967); DiCamillo v. Westinghouse Electric Corporati......
  • Request a trial to view additional results
4 books & journal articles
  • Contract cases
    • United States
    • James Publishing Practical Law Books Florida Causes of Action
    • April 1, 2022
    ...10. Aetna Casualty & Surety, Co. v. Jelac Corp., 505 So.2d 37, 38 (Fla. 4th DCA 1987). 11. Weimar v. Yacht Club Point Estates, Inc., 223 So.2d 100, 102 (Fla. 4th DCA 1969). §3:40.1.5 Elements of Cause of Action — 5th DCA A person who is not a party to a contract may not sue for breach of th......
  • Warranty cases
    • United States
    • James Publishing Practical Law Books Florida Causes of Action
    • April 1, 2022
    ...breach of warranty. 4. Notice of breach of warranty. 5. Injuries sustained and damages. Source Weimar v. Yacht Club Point Estates, Inc., 223 So.2d 100, 104 (Fla. 4th DCA 1969). See Also 1. Dunham-Bush, Inc. v. Thermo-Air Serv., Inc., 351 So. 2d 351, 353 (Fla. 4th DCA 1977). 2. In re Masonit......
  • Continued revision of the economic loss rule: statutory causes of action not barred.
    • United States
    • Florida Bar Journal Vol. 74 No. 4, April 2000
    • April 1, 2000
    ...defective concrete sold by the defendant would not qualify as other property damage. [26] See, e.g., Weimar v. Yacht Club Point Estates, 223 So. 2d 100, 103 (Fla. 1969); Masciarelli v. Maco Supply Corp., 224 So. 2d 329 (Fla.1969); Griffith v. Shamrock Village, Inc., 94 So. 2d 854 (Fla. [27]......
  • Deconstructing warranties in the construction industry.
    • United States
    • Florida Bar Journal Vol. 83 No. 4, April 2009
    • April 1, 2009
    ...to be made in some situations regarding whether an express warranty was, in fact, conferred. In Weimar v. Yacht Club Point Estates, Inc., 223 So. 2d 100, 102 (Fla. 4th DCA 1969), for example, the homeowner sued the flooring subcontractor for damages arising from defective installation of vi......

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT