Adkison Corp. v. American Bldg. Co.
Decision Date | 23 October 1984 |
Docket Number | No. 14396,14396 |
Citation | 690 P.2d 341,107 Idaho 406 |
Parties | , 39 UCC Rep.Serv. 98 ADKISON CORPORATION and Ronald Corrado, dba Clearwater Aviation, Plaintiffs- Appellants, v. AMERICAN BUILDING COMPANY, Defendant-Respondent. |
Court | Idaho Supreme Court |
Marilyn Brennan Schwam, Moscow, Kenneth L. Pedersen, Twin Falls, Dean Wullenwaber, Moscow, for plaintiffs-appellants.
William B. Taylor, Jr., Grangeville, for defendant-respondent.
Marilyn Brennan Schwam, Moscow, for plaintiffs-appellants.
Kenneth L. Pedersen, Twin Falls, and Dean Wullenwaber, Moscow, for amicus, Idaho Trial Lawyers.
William B. Taylor, Jr., Esq., Grangeville, Idaho, attorney for defendant-respondent.
ON DENIAL OF PETITION FOR REHEARING
This suit was brought by two Idaho plaintiffs, Adkison Corporation, an Idaho contracting company, and Ronald Corrado, an Idaho aircraft mechanic, against American Building Company (ABC), a manufacturer of metal buildings, headquartered in Georgia with a manufacturing plant located in Nevada. The plaintiffs brought suit against ABC for damages resulting from the alleged late delivery of a defective building. Plaintiffs' claim for liability and damages is based on several theories including agency, contract, implied warranty and negligence. The trial court directed a verdict against the plaintiffs on each of the above counts. On appeal, we address whether the plaintiffs presented sufficient evidence to allow a jury to conclude that the defendant was liable on each of the above theories. We affirm in part, reverse in part and remand.
In mid-1978, Corrado wanted to build a hangar, shop, office space and other facilities for his new aircraft repair business at the Grangeville airport. Corrado entered into a written contract with plaintiff Adkison Corporation to have these facilities constructed. ABC was to be the supplier of a metal hangar and lean-to components which were to be erected by Adkison as a part of Adkison's contract with Corrado.
Adkison supplied information regarding the design of the hangar to ABC's dealer, Rural Systems, Inc. (RSI). Adkison ordered the hangar from RSI, who in turn submitted an order to ABC. All the parties understood that the building would be manufactured and supplied by ABC. RSI made a mistake in placing the order by specifying that the common wall between the hangar building and the first lean-to should be an open wall. Adkison discovered the mistake and notified RSI, and RSI then informed ABC of it. ABC agreed to furnish the additional material to erect the missing wall at no additional cost. There were other fabrication and shipping mistakes, and further delays in shipping additional materials required to complete the building. Such delays and mistakes were directly attributable to ABC.
The plaintiffs are each seeking recovery of economic losses due to ABC's alleged failure to deliver a complete building package, alleged errors in fabrication of its building components, and alleged delays in correcting errors and supplying missing parts.
RSI was originally included as a defendant, but was dismissed from this suit because it declared bankruptcy. The case went to trial and at the conclusion of the plaintiffs' case in chief, the trial court granted ABC's motion for a directed verdict on all of the plaintiffs' counts. The plaintiffs made a motion for a new trial which the trial court subsequently denied. This appeal followed.
On appeal, we must determine whether the trial court erred in granting defendant's motion for a directed verdict on each of plaintiff's theories which are as follows:
(1) The defendant ABC was liable to the plaintiffs based on the theory that an apparent agency existed between ABC and RSI;
(2) The defendant ABC was liable to the plaintiffs based on the theory that plaintiffs were third-party beneficiaries of the ABC-RSI agreement;
(3) The defendant ABC was liable to the plaintiffs for economic losses based on the theory of breach of implied warranties in tort;
(4) The defendant ABC was liable to the plaintiffs for economic losses based on the theory of negligence;
(5) The defendant ABC was liable to the plaintiffs based on a theory of direct contract between the plaintiffs and ABC.
Before we separately address each of the above theories, we first note our standard of review.
Gmeiner v. Yacte, 100 Idaho 1, 4, 592 P.2d 57, 60 (1979).
Agency
Plaintiffs contend that ABC is liable to them based on an apparent agency theory. Plaintiffs argue that ABC created the impression that RSI was its agent through ABC's actions and that by virtue of the ABC-RSI agency relationship, a contractual relationship arose between the plaintiffs and ABC. Proof of implied agency is generally found in the acts and conduct of the parties, rather than from an oral or written contract which establishes the agency relationship. State v. DeBaca, 82 N.M. 727, 487 P.2d 155 (1971). See also Briggs v. Morgan, 262 Or. 17, 496 P.2d 17 (1972) ( ); Land-Air, Inc. v. Parker, 103 Ariz. 1, 435 P.2d 838 (1967) ( ). In addition, the existence of an agency relationship is a question for the trier of fact to resolve from the evidence. Clark v. Gneiting, 95 Idaho 10, 501 P.2d 278 (1972); Thornton v. Budge, 74 Idaho 103, 257 P.2d 238 (1953) ( ).
(1) RSI was an authorized dealer for ABC buildings[.]
(2) RSI participated with ABC in advertising ABC buildings[.]
(3) RSI was supplied with ABC brochures and order forms and instructions.
(4) RSI employees were given some training at an ABC plant, including training on how to order ABC buildings.
(5) ABC representatives in Spokane frequently were in contact with the RSI office there.
(6) RSI did place the order for the Corrado hanger [sic] building with ABC. RSI negligently specified an 'open' wall in its order to ABC.
(7) RSI employees made certain oral representatives [sic] to Adkison about delivery dates of the ABC building.
(8) RSI made numerous calls to ABC to inquire about the Adkison order, to relay complaints from Adkison, and to order additional materials."
Notwithstanding this evidence, the trial court concluded "all of plaintiffs' evidence ... did not establish the principal-agency relationship between ABC and RSI." We have read the transcript and studied the record in this case, and we believe that the evidence is such that reasonable minds could differ as to the conclusion to be reached from the evidence. Accordingly, we reverse the order of the district court in directing a verdict against the plaintiffs on this count and remand it to the trial court for a new trial on the merits.
Plaintiffs contend they were third-party beneficiaries of the contract between ABC and RSI for the sale of the hangar building to RSI. Accordingly, plaintiffs claim they are entitled to enforce the ABC-RSI contract and to have the benefit of any warranties which ran with the ABC-RSI contract of sale.
This Court has previously recognized the right of a third party to maintain an action on a contract executed for the benefit of such third party. Davis v. Nelson-Deppe, Inc., 91 Idaho 463, 424 P.2d 733 (1967); Dawson v. Eldredge, 84 Idaho 331, 372 P.2d 414 (1962); I.C. § 29-102. However, "before recovery can be had by a third party beneficiary, it must be shown that the contract was made for his direct benefit, or as sometimes stated primarily for his benefit, and that it is not sufficient that he be a mere incidental beneficiary." Dawson, supra, at 337, 372 P.2d at 418, (quoting Sachs v. Ohio Nat. Life Ins. Co., 148 F.2d 128, 131 (7th Cir.1945)).
In the more recent case of Stewart v. Arrington Construction Co., 92 Idaho 526, 446 P.2d 895 (1968), we further stated that the contract itself must express an intent to benefit the third party. "This intent must be gleaned from the contract itself unless that document is ambiguous, whereupon the circumstances surrounding its formation may be considered." Id. at 532, 446 P.2d at 901. In Stewart, we concluded that the trial court should have considered the provisions of the contract to see if it "manifested an intent to benefit a third person." Id. We further concluded that without an indication that the contract therein was considered, the trial court's summary dismissal of appellant's third-party count was improper. Id.
In the case at bar, the record does not reveal that the trial court ever considered the ABC-RSI contract in reaching its decision to direct...
To continue reading
Request your trial-
Chemtrol Adhesives, Inc. v. American Mfrs. Mut. Ins. Co.
...Inc. v. Grady Tractor Co. (1976), 140 Ga.App. 320, 323, 231 S.E.2d 105, 108 (strict liability); Adkison Corp. v. American Bldg. Co. (1984), 107 Idaho 406, 410-411, 690 P.2d 341, 345-346 (implied warranty and negligence); Prairie Production, Inc. v. Agchem Division-Pennwalt Corp. (Ind.App.19......
-
Sharp v. W.H. Moore, Inc., 16667
...be considered.' [Stewart v. Arrington Construction Co., 92 Idaho 526, 532, 446 P.2d 895, 901 (1968) ]. Adkison Corp. v. American Building Co., 107 Idaho 406, 409, 690 P.2d 341, 344 (1984). A third party may only enforce a contract "if he can show he is a member of a limited class for whose ......
-
Gissel v. State
...acts in such a manner which leads the agent to believe that he has authority to act for the principal. Adkinson Corp. v. American Bldg. Co., 107 Idaho 406, 690 P.2d 341 (1984); State v. DeBaca, 82 N.M. 727, 487 P.2d 155 (1971). Third, apparent authority--acts by the principal involving thir......
-
Idaho Lumber, Inc. v. Buck
...question becomes one of fact, and not one of law. Clark v. Gneiting, 95 Idaho 10, 501 P.2d 278 (1972); Adkison Corporation v. American Building Company, 107 Idaho 406, 690 P.2d 341 (1984). Where the question depends upon the construction of an undisputed, unambiguous written lease, and its ......