Avenal v. U.S., 95-5149

Decision Date12 November 1996
Docket NumberNo. 95-5149,95-5149
PartiesALBERT J. AVENAL, JR., and 129 similarly situated, Plaintiffs-Appellants, v. THE UNITED STATES, Defendant-Appellee
CourtU.S. Court of Appeals — Federal Circuit

Appealed from: United States Court of Federal Claims, Judge Miller

Wendell H. Gauthier, Gauthier & Murphy, Metairie, Louisiana, for plaintiffs-appellants. Of Counsel on the brief were Michael X St. Martin and Michelle M. Davis, St. Martin & Lirette, and Carolyn McNabb, P.L.C., Houma, Louisiana

Martin W. Matzen, Attorney, Environment and Natural Resources Division, Department of Justice, Washington, D.C., for defendant-appellee. With him on the brief were Lois J. Schiffer, Assistant Attorney General, Jacques B. Gelin and Thorton Withers Field. Of counsel on the brief was Marco A. Rosamano, U.S. Army Corps of Engineers, New Orleans, Louisiana. Of counsel was David C. Shilton, Attorney, Environment and Natural Resources Division, Department of Justice, Washington, D.C.

Before Rich, Newman and Plager, Circuit Judges.

Plager, Circuit Judge.

This is a Takings case.1 Albert Avenal, Jr. and 129 similarly situated plaintiffs ("Avenal" or "plaintiffs") leased oyster beds from the State of Louisiana. During the lease term, fresh-water diversion projects under the aegis of the United States altered the salinity level in the water over the oyster beds, thus rendering the beds unsuitable for oyster cultivation. Plaintiffs brought suit in the Court of Federal Claims alleging a taking by the United States ("Government") in violation of the Fifth Amendment of the Constitution. The Court of Federal Claims on summary judgment dismissed the claims, holding that Avenal never acquired a constitutionally protectable property interest. We affirm the judgment of the Court of Federal Claims, although on different grounds.

Background

The properties involved in this case are in The Breton Sound Basin, a part of the coastal waters of Louisiana lying east of the Mississippi River and south of New Orleans. Because the area contained a broad mixing zone of freshwater outflow from the Mississippi River and smaller coastal streams and the saline waters of the Gulf of Mexico, the area historically provided excellent conditions for oyster growth.

But life for the oysters, and for those who made their living harvesting them, did not remain sweet. Oysters to thrive need a salinity level ranging from 5 parts per thousand to 15 parts per thousand. Over time, both man-made and natural changes to the area caused the salinity levels in the subdelta marsh lands below New Orleans to increase. The parties attribute the changes in salinity primarily to man-made causes, including the establishment of a levee system for flood control on the Mississippi, and oil and gas exploration that involved extensive canal networks. The natural changes stemmed from subsidence, shoreline erosion, and drought, all adding to the saltwater intrusion.

There is evidence that as early as 1900 the relevant state agencies and various parishes (similar to counties) were considering the idea that freshwater be diverted from the Mississippi River to adjacent marsh lands in order to improve oyster habitats and to reduce the mortality rate associated with increased salinity. In 1959, in a memorandum written by the United States Department of the Interior's Fish and Wildlife Service to the United States Army Corps of Engineers ("Corps"), the Interior Department set forth its conclusions resulting from an investigation into the advisability of establishing freshwater diversions via structures to be built for that purpose. The investigation itself was prompted, in part, by requests from local groups, including the oyster industry, concerning the need for such diversions.

The 1959 memorandum discussed a marked reduction in oyster yield that had occurred over time, and concluded that freshwater diversion would be beneficial in that it would re-establish natural patterns of salinity and increase oyster-bed fertility. The memorandum identified four separate areas in Plaquemines Parish as freshwater diversion sites, two of which are on the east side of the Mississippi. One of these two, Area 4, is in the vicinity of Scarsdale, in the upper landward end of the Breton Sound Basin. The area was described in the memorandum as itself being too fresh to support an oyster fishery, so that the effect of the Area 4 diversion would not be to change the salinity levels themselves, but to combat the effects of subsidence and push back salt-water intrusion.

The 1959 memorandum was later incorporated into House Document No. 308, which led to the passage, on October 27, 1965, of the Public Works*Rivers and Harbors Act, Pub. L. No. 89-298, 79 Stat. 1037 (1965) (the "Act"), which authorized certain freshwater diversion structures to be built in and around the Breton Sound Basin. During 1968 and 1969 the Corps met with, among others, the Louisiana Wildlife and Fisheries Commission and the Plaquemines Parish Commission Council to discuss proposed locations for these Congressionally-authorized diversion structures. During public hearings, the Corps proposed Caernarvon as the location of the freshwater diversion structure for Area No. 4.

Meanwhile, due to continuing salinity changes the zone favorable for oyster growth continued to move landward. This landward salinity movement spawned an oyster community in the marsh lands in the northwest portion of the Breton Sound Basin, in the area which had previously been too fresh to sustain such growth. While creating new oyster grounds, the change in salinity had the effect of rendering unusable large areas of previously productive oyster grounds. During the 1970's oyster farmers engaged in the spawning and harvesting of oysters noted the changed conditions in the northwest landward part of the Basin and entered into water-bottom lease agreements with the State of Louisiana for the areas then usable as oyster beds.

Over the ensuing years the Corps and relevant state and local agencies continued to discuss at informal meetings the construction of a freshwater diversion structure at Caernarvon. It was known by all parties, including both the state and plaintiffs, that the Caernarvon project would create an area in which conditions again would become too fresh for oyster cultivation, and that this area would coincide with an area which had been formerly too fresh for oyster cultivation. On January 21, 1982, the State of Louisiana submitted a letter to the Corps, announcing its intent to participate in the Caernarvon freshwater diversion project. The Corps and the State issued a joint public notice regarding the construction surrounding the Caernarvon project.

On October 30, 1986, Congress authorized the funds for the construction of the Caernarvon project. The State of Louisiana entered into a formal agreement with the Corps stipulating that the State would maintain and operate the facilities following completion of construction, and that the State would be responsible for 25 percent of the total costs of construction. The agreement further provided an indemnification clause under which the State would indemnify the Federal Government for any losses occasioned by claims for "damages arising from the construction, operation, maintenance, and rehabilitation of the project . . . ." The Caernarvon project was completed in due course, and it had the expected effect on the salinity levels in The Breton Sound Basin. Although the Caernarvon project was not itself completed until 1991, other freshwater diversion structures, upon which Caernarvon was modeled, had been completed earlier, some going back as early as 1956 (Bayou Lamoque) and 1964 (White Ditch Siphon).

On April 26, 1994, plaintiffs, who owned leases from the State of water-bottom lands used for oyster propagation, filed a complaint in the United States Court of Federal Claims, alleging a taking of their leasehold interests resulting from the Caernarvon project. Specifically, plaintiffs alleged that the Caernarvon project diluted the salinity level in the waters above their leased grounds and caused silt deposits in the leased area. These conditions were not favorable to oyster growth. As a result, the Government's Caernarvon project prevented them from continuing to cultivate oysters on their leased beds.

The Court of Federal Claims granted the Government's motion for summary judgment on the grounds that the oysterers held no compensable property interest. Since the State acquired no property interest in the salinity level of the waters above plaintiffs' leased grounds, plaintiffs could have acquired no such...

To continue reading

Request your trial
17 cases
  • State ex rel. AWMS Water Solutions, L.L.C. v. Mertz
    • United States
    • Ohio Supreme Court
    • September 23, 2020
    ...action ‘substantially reduc[ed] the value of plaintiff's property.’ " (Brackets sic.) Good at 1363, quoting Avenal v. United States , 100 F.3d 933, 937 (Fed.Cir.1996). The Ninth Circuit Court of Appeals has applied a similar approach. See Guggenheim v. Goleta , 638 F.3d 1111, 1120 (9th Cir.......
  • State ex rel. AWMS Water Solutions, L.L.C. v. Mertz
    • United States
    • Ohio Supreme Court
    • September 23, 2020
    ...action ‘substantially reduc[ed] the value of plaintiff's property.’ " (Brackets sic.) Good at 1363, quoting Avenal v. United States , 100 F.3d 933, 937 (Fed.Cir.1996). The Ninth Circuit Court of Appeals has applied a similar approach. See Guggenheim v. Goleta , 638 F.3d 1111, 1120 (9th Cir.......
  • Avenal v. State
    • United States
    • Court of Appeal of Louisiana — District of US
    • March 3, 1999
    ...in August 1995.1 On appeal to the Court of Appeals for the Fifth Circuit, that decision was affirmed in November 1996.2 Following the Avenal Fifth Circuit decision, defendant in the present state suit filed a motion for summary judgment arguing that collateral estoppel barred the re-litigat......
  • Campo v. United States
    • United States
    • U.S. Claims Court
    • December 23, 2021
    ...property interest protected by the Fifth Amendment and whether the Caernarvon project resulted in a constitutional taking.[18] See Federal Avenal, 100 F.3d 933 the trial court's decision to grant the government's summary judgment motion). The Federal Circuit found the lessees had "valuable ......