Brown v. Brown

Decision Date11 June 1981
PartiesAnn Marie BROWN, Plaintiff-Respondent, v. Robert BROWN, Township of Berkeley, and County of Ocean, Defendants, and State of New Jersey, Defendant-Appellant. Robert BROWN, Plaintiff, v. STATE of New Jersey, Department of Transportation of the State of New Jersey, Defendants-Appellants, and Township of Berkeley of the State of New Jersey, et al., Defendants.
CourtNew Jersey Supreme Court

Bertram P. Goltz, Jr., Deputy Atty. Gen., for defendants-appellants (John J. Degnan, Atty. Gen., attorney; Erminie L. Conley, Asst. Atty. Gen., of counsel).

William V. Kelly, Brick Town, for plaintiff-respondent (Starkey, Kelly, Cunningham, Blaney & Ward, Brick Town, attorneys).

The opinion of the Court was delivered by

SCHREIBER, J.

In these automobile accident cases we are called upon to consider aspects of the State's immunity for discretionary activities under the New Jersey Tort Claims Act (Act), N.J.S.A. 59:1-1 et seq., and the interplay of Evidence Rule 51, prohibiting the admission of remedial measures taken after an accident, with the Act's discretionary immunity provisions, N.J.S.A. 59:2-3.

Plaintiffs, Ann Marie Brown and her husband Robert Brown, in separate actions sued the State of New Jersey for damages for personal injuries that were incurred when, during a rainstorm, the Brown vehicle struck water in a curve on State Highway 9 in Berkeley Township, Ocean County, spun around into the opposite lane of traffic and collided with a pickup truck driven by James Ziemba. The jury found the State responsible. It awarded Mrs. Brown $225,000 and Mr. Brown $25,000. Upon the State's appeal the Appellate Division affirmed. We granted the State's petition for certification. 85 N.J. 467, 427 A.2d 564 (1981). We affirm.

I

The State's attack on the jury verdict is predicated on the assumption that the jury could not factually on the basis of the record reach conclusions consonant with the statutory discretionary immunities. Accordingly, we have reviewed the record from the viewpoint of the facts the jury could reasonably have found.

The section of Route 9 involved in this case had been constructed in 1925 and was a two-lane paved highway, one for northbound and the other for southbound traffic. The road curved eastward and in a downhill direction toward the north. The "as built" drawings show that a swale ditch (a ditch which acts as a conduit for water) had been constructed on the west side of the road at the curve. The function of the ditch was to intercept any water runoff from the ground adjoining the road and direct it away from the highway. As constructed the contour of the ditch was such that water draining from the surrounding land would not come across the highway.

Proper maintenance of a swale ditch requires periodic removal of the sand and debris that will accumulate in the swale ditch. Unless that practice is followed the swale will become nonfunctional. When Herman Rich, a civil engineer with extensive experience in the highway and traffic field, examined the road in October 1975, four months after the accident, he found the originally installed swale ditch had disappeared, the accumulated silt and debris having obliterated it. Because of the absence of the ditch, water flowed across the highway pavement in the area of the curve from west to east. During a heavy rainfall the body of water pushed ahead by a vehicle could become deep enough to cause hydroplaning, a phenomenon in which the front tires are elevated by the water and lose contact with the pavement. When that happens, steering control is lost, as Mr. Brown lost it about 11 a. m. on June 12, 1975 when his stationwagon struck the body of water that had accumulated on the road after running off from the adjacent land during a heavy rain.

Knowledge of the dangerous condition that existed at this point in Route 9 and control over that part of the roadway were conceded by the State. The State had been aware long before the accident that this condition arose during rainstorms. On February 14, 1974, the Traffic Safety Officer of Berkeley Township had written to R. Lightbody, Chairman of the Ocean County Traffic Safety Committee, in regard to this "very hazardous condition on a particular section of Route 9 which (had) existed for a number of years." He indicated that the problem was caused by the water runoff across the roadway when it rained "which tend(ed) to make all vehicles hydroplane while passing through it." He enclosed 16 accident reports related to the wet roadway over a span of three years, 1971 through 1973. Mr. Lightbody forwarded this information in the form of an accident collision diagram with a letter dated April 2, 1974 to Robert J. Nolan, Chief of the Bureau of Traffic Engineering of the Department of Transportation.

A Senior Engineer in the Department conducted an investigation. In a memo dated June 27, 1974, he wrote that he had met with the Berkeley Township Police Chief and had been advised of the water accumulation at the curve of the road. He had viewed the scene and observed that the southerly approach to the curve had a one percent downgrade. It seemed to him that when combined with the super-elevation of the curve, water would flow across Route 9 at the curve. He recommended warning signs be installed and further investigation be undertaken to determine what could be done to provide better drainage.

On June 27, 1974 Mr. Lightbody was advised by Mr. Nolan's office that it had recommended installation of "Slippery When Wet" signs and that the matter had been forwarded to the Bureau of Surface Design "to determine what steps, if any, may be taken to improve drainage along the section of Route U.S. 9." On the same day, the Supervising Engineer of the Bureau of Traffic Engineering sent to the Chief of the Bureau of Surface Design, Edwin Dayton, an interoffice memo in which he wrote:

We investigated this matter and it is our opinion that rain water flowing across Route U.S. 9 at the curve results in vehicles hydroplaning through the curve. It would be appreciated if you could look into this matter and determine what action, if any, could be taken to provide better drainage along this section of roadway.

On July 29, 1974 a Project Engineer wrote to Mr. Dayton recommending "that we construct a well-defined swale .... This swale should be such as to intercept and direct waters along the edge of the high side shoulder." Mr. Dayton added 15 jobs including this one to a list dated March 26, 1974 of 97 other projects. He did nothing about expediting this work because "it was nothing that was of great importance at that particular point in time." On August 1, 1974, this project was submitted along with 14 others for scheduling to John Datz, the Supervising Engineer in Area Four which encompassed eight counties including Ocean. No action was taken at that time to schedule construction of the swale.

On May 15, 1975 Dayton requested that the various area engineers review the projects and provide him with a priority listing. At that time the Supervising Engineer had a list of 23 projects. He listed the Route 9 swale ditch as number 17. He testified that he did not consider this "to be of an emergency" nature. He explained he evaluated the projects and considered whether other projects were in the same general area or were already under way. Datz also said that these priorities can be changed if "we find any problem in the priority assignment."

In an office memo dated July 7, 1975, approximately three weeks after the accident, the Chief Engineer in the design section, Frank Parker, noted the drainage situation had been investigated "approximately a year ago." He referred to the Project Engineer's July 29, 1974 report and commented that the recommendation had "not been implemented in any way."

On August 15, 1975 Mr. Parker requested a sketch for the proposed swale. On the same day, a request was made to obtain existing cross sections every 50' and topography along Route 9 as indicated on the "as built" plan, which depicted the original swale. On August 20, 1975 Edwin Dayton also requested the Supervising Engineer prepare a sketch for construction of the proposed swale. A follow-up request was made on September 26, 1975.

Prints for the construction of a swale were completed September 30, 1975. In a memo of October 2, 1975 the Regional Engineer noted that maintenance forces would cut the swale. A work order with a diagram attached showing the length, width and depth of the swale was prepared and sent to the maintenance department in Toms River. Part of the routine functions of the maintenance department involved clearing swale ditches.

Restoration of the ditch entailed scooping up sandy gravel to a depth of 6 to 12 inches for about 400 feet. Two stakes were inserted in the ground to mark the points between which the excavation was to be made. The work was done by employees of the maintenance department stationed at a highway maintenance yard located some five or six miles away. One employee operated a front end loader; a second employee ran a dump truck to cart away debris if necessary; a third acted as a safety guard. The project took approximately 11/2 days.

At the trial Herman Rich, plaintiff's expert, testified that no new survey was needed and the original plans would have sufficed. Only two elevations would be required, one where the swale disappeared and the other where it reappeared.

At the conclusion of the evidence the State moved for a directed verdict on two grounds. It contended there was no credible evidence relating to proximate cause between the dangerous condition and the happening of the accident. It also argued that the plaintiff had failed to prove that the dangerous condition was "palpably unreasonable" as required by N.J.S.A. 59:4-2. The trial court denied the motion and submitted the case to the jury, including the issue of...

To continue reading

Request your trial
52 cases
  • Berel Co. v. Sencit F/G McKinley Associates
    • United States
    • U.S. District Court — District of New Jersey
    • March 3, 1989
    ...burden of proof with respect to the reasonableness of a public entity's conduct undoubtedly rests with that entity. Brown v. Brown, 86 N.J. 565, 578-79, 432 A.2d 493 (1981). See also Fox v. Township of Parsippany-Troy-Hills, 199 N.J.Super. 82, 90, 488 A.2d 557 (App.Div.1985) ("the public en......
  • Davidson v. O'Lone
    • United States
    • U.S. Court of Appeals — Third Circuit
    • December 27, 1984
    ...Inc. v. Borough of Medford Lakes, 90 N.J. 582, 449 A.2d 472 (1982); Rivera v. Gerner, 89 N.J. 526, 446 A.2d 508 (1982); Brown v. Brown, 86 N.J. 565, 432 A.2d 493 (1981); Costa v. Josey, 83 N.J. 49, 415 A.2d 337 (1980); Kolitch v. Lindedahl, 193 N.J.Super. 540, 475 A.2d 86 (App.Div.1984); Sp......
  • Harris v. Peridot Chemical (New Jersey), Inc.
    • United States
    • New Jersey Superior Court — Appellate Division
    • June 22, 1998
    ...of Evidence 407 "excludes relevant evidence only if that evidence is used 'to prove negligence or culpable conduct.' " Brown v. Brown 86 N.J. 565, 581, 432 A.2d 493 (1981) (quoting Evid. R. 51). "Thus, where such evidence is offered for relevant purposes other than negligence or culpable co......
  • Newark Watershed Conservation v. Watkins-Brashear (In re Newark Watershed Conservation & Dev. Corp.)
    • United States
    • U.S. Bankruptcy Court — District of New Jersey
    • June 21, 2016
    ...to give meaning to all words and to avoid an interpretation that reduces specific language to mere surplusage”); Brown v. Brown , 86 N.J. 565, 577, 432 A.2d 493 (1981) (as a “general interpretive principle” the language of a statute is “not intended to be redundant, lead to an untoward resu......
  • Request a trial to view additional results