Candiano v. Moore-McCormack Lines, Inc.

Decision Date15 March 1966
Citation251 F. Supp. 654
PartiesCarmelo CANDIANO, Plaintiff, v. MOORE-McCORMACK LINES, INC., Defendant and Third-Party Plaintiff, v. JOHN W. McGRATH CORPORATION, Third-Party Defendant.
CourtU.S. District Court — Southern District of New York

Max D. Krongold, New York City, for plaintiff; Ezekiel Jasper, New York City, of counsel.

Burlingham, Underwood, Barron, Wright & White, New York City, for defendant and third-party plaintiff; James W. Lynch and Owen B. Walsh, New York City, of counsel.

Joseph F. McGoldrick, New York City, for third-party defendant; Martin J. McHugh, New York City, of counsel.

FEINBERG, District Judge.

This is an admiralty action for personal injuries by plaintiff Carmelo Candiano against Moore-McCormack Lines, Inc. ("Shipowner"), owner of the ship on which Candiano was working when injured. Shipowner impleaded John W. McGrath Corporation ("Stevedore"), employer of Candiano and stevedore for Shipowner.1

Plaintiff was hit by a falling hatch beam weighing about a ton while working in the lower hold of the "S. S. Mormachawk" shortly after midnight, on the morning of February 18, 1961. The ship was at its berth at the 23rd Street Pier in Brooklyn. Shipowner denies liability and contests the alleged damage; Stevedore, while also arguing against plaintiff's recovery, does not strenuously contest its obligation to indemnify Shipowner if the latter is liable to plaintiff. Plaintiff's viable theory of recovery at this stage is unseaworthiness; a negligence count was dismissed during trial without objection.

Plaintiff, as part of a gang of carpenters, was chocking cargo in the lower hold of No. 3 hatch on the night in question. The accident occurred while longshoremen, also employed by Stevedore, were engaged in placing a steel hatch beam on No. 3 tween deck hatch preparatory to covering up the hatch prior to sailing. While the steel hatch beam was being placed athwart tween deck hatch No. 3 and was suspended over the square of the hatch, a hook inserted into the opening at one of the ends of the hatch beam became dislodged and the beam fell into the lower hold. The heavy beam struck plaintiff and knocked him down. Plaintiff was rendered unconscious by the blow and injured severely, as discussed more fully below, and was taken out of the hold and off the ship by stretcher and transferred to a hospital.

I

The basis of plaintiff's claim is that the ship was unseaworthy because the device used to lower the hatch beam was not reasonably fit for its intended use. All parties agree that the longshoremen used a pontoon bridle to secure the beam to the cargo falls (or hoist rope). The bridle consisted of four equal lengths of wire; each had at one end a pontoon hook and was attached at the other end to a common ring. One hook was inserted into a hole at one end of the twenty-foot long hatch beam and another hook was attached at the other end; the remaining two hooks were looped up and placed into the common ring. Plaintiff claims that a different type of bridle—a toggle beam bridle—was the proper appliance for lowering a steel hatch beam. The distinguishing feature of a toggle bridle is that at one end a metal bar rather than a hook is attached to a length of chain; by passing the chain and metal bar through the hole of a hatch beam and then positioning the bar properly, the hatch beam is prevented from falling off the bridle. Plaintiff argues that if a toggle beam bridle had been used instead of a pontoon bridle, the hatch beam could not have been dislodged and it would not have fallen. Accordingly, plaintiff argues that an improper and unsafe appliance was used, thereby rendering the ship unseaworthy. Shipowner claims that the pontoon bridle was reasonably fit for its intended purpose and, in any event, toggle bridles were supplied by the ship and made available to Stevedore.

There is little doubt that the lowering mechanism utilizing the pontoon bridle, as it was actually used by the longshoremen, was unsafe and therefore unfit. The evidence shows that the hook that became dislodged had not been fully brought through the hole in the hatch beam and made secure to the standing part of the bridle. Shipowner's claim that the pontoon bridle was reasonably fit is based upon the proposition that had this operation been performed, the hatch beam would have been secure. Shipowner thus argues that the longshoremen's failure to properly secure the beam was "operational negligence," so that no unseaworthiness had as yet resulted. The cases in this circuit do make a distinction between operational negligence and an unseaworthy condition negligently created,2 denying the ship's liability in the former case. The difficulty lies in defining when negligent conduct ends and an unseaworthy condition begins. In Grillea v. United States, 232 F.2d 919, 922 (2d Cir. 1956), Judge Learned Hand stated:

It would be futile to try to draw any line between situations in which the defect is only an incident in a continuous operation, and those in which some intermediate step is to be taken as making the ship unseaworthy. Nevertheless, it is necessary to separate the two situations, even though each case must turn on its particular circumstances.

In Puddu v. Royal Netherlands S. S. Co., 303 F.2d 752, 756 (2d Cir.) (per curiam in banc), cert. denied, 371 U.S. 840, 83 S.Ct. 67, 9 L.Ed.2d 75 (1962), Judge Hays, in a concurring opinion stated (303 F.2d at 757):

The difficulty with the concept of unseaworthiness arises from the fact that while the authorities hold that there is liability without fault, there is no case which holds that there is absolute liability. The situation demands, then, that without regard to fault, we fix a point short of absolute liability. But logical coordinates for fixing a point, such as the time during which a particular condition continues to exist, are entirely lacking. Time is obviously irrelevant since notice to the shipowner is of consequence only if his liability is limited by fault. See Mitchell v. Trawler Racer, Inc., 362 U.S. 539, 80 S.Ct. 926, 4 L.Ed. 2d 941 (1960).
Perhaps the best that can be done is, like Judge Hand in Grillea v. United States, 232 F.2d 919 (2d Cir. 1956), to take as the starting point a condition of reasonable fitness for intended use, to consider this condition as impaired by the conduct or process which is the subject of litigation, and to call the resulting condition "unseaworthiness." The conduct or process by which the fitness is changed to unfitness is not then to be classified as itself constituting unseaworthiness.
A ship is not unseaworthy because it has glass in a window which might be broken. The injuries of a seaman who negligently breaks such a glass are not the result of unseaworthiness, nor are the injuries of a seaman who is cut by the falling glass. But injury incurred in stepping on the broken glass does result from unseaworthiness.
The rule is far from satisfactory, but it has the virtue of being possible, though not easy, of application, and of having behind it the authority of a great judge. The situation itself does not permit the formulation of a really satisfying rule.

This distinction was recently re-affirmed in Norfleet v. Isthmian Lines, Inc., 355 F.2d 359 (2d Cir. 1966).

In Grillea, the wrong hatch cover was placed over a pad-eye "only a short time" before libelant, a longshoreman, stepped on it and it gave way beneath him. This was held (2-1) to constitute a condition of unseaworthiness. In Puddu, a boom buckled while a rain tent was being raised and the falls of a winch were being stretched to a dangerously large angle. It was there held (7-2) that no condition of unseaworthiness had as yet been created.

The distinction has been questioned in this circuit3 and is not accepted in some other jurisdictions.4 However, accepting it as the applicable law in this circuit, I find that an unseaworthy condition had already come into being at the time the hatch beam fell and this condition caused the injury to plaintiff. There was an appreciable period of time after the hatch beam was secured to the cargo falls and before the beam fell off as it was being lowered. Once the beam was attached to the pontoon bridle—albeit insecurely, as later became clear—the lowering mechanism was clearly unsafe and, therefore, unseaworthy. The negligence of the stevedores in failing properly to secure the hook holding the beam had already been completed. Therefore, under the Grillea-Puddu distinction, the ship was unseaworthy at that time. Concededly, determination of the dividing line between operational negligence and an unseaworthy condition is difficult but crucial, and much depends on what is considered to be the negligent act that has or has not come to an end.5 However, my finding is supported by Strika v. Netherlands Ministry of Traffic, 185 F.2d 555 (2d Cir. 1950), cert. denied, 341 U.S. 904, 71 S.Ct. 614, 95 L.Ed. 1343 (1951), where the manner of hooking up two bridles to lift a heavy piece of metal was unsafe and rendered the ship's gear unseaworthy. See also Skibinski v. Waterman S. S. Corp., 242 F.Supp. 290 (S.D.N.Y.1965), relying on Strika, where plaintiff was injured because an open-mouth cargo hook, without any locking device, was used to lower a ladder which fell upon plaintiff. But cf. Massa v. C. A. Venezuelan Navigacion, 332 F.2d 779 (2d Cir.), cert. denied, 379 U.S. 914, 85 S.Ct. 262, 13 L.Ed.2d 186 (1964).6

Shipowner also contends that the ship cannot be held unseaworthy because proper equipment—a toggle bridle —was on board and available. However, this contention was squarely met and rejected in Strika, supra, where Judge Learned Hand stated (185 F.2d at 556):

But other "bridles" were available which could have been used, and which had a single ring with four lengths of wire. These concededly would have been suitable, and the defendant asserts that their presence made the ship seaworthy, even if they were not used. In answer we need only cite
...

To continue reading

Request your trial
9 cases
  • Petition of United States Steel Corporation
    • United States
    • U.S. Court of Appeals — Sixth Circuit
    • 23 Diciembre 1970
    ...the Second Circuit in Candiano v. Moore-McCormack Lines, Inc., 382 F.2d 961 (2d Cir. 1967), affirming the decision reported at 251 F.Supp. 654 (S.D.N.Y. 1966) approved the establishment of a claimant's earning capacity by averaging his earnings for the six years preceding the 6 In Drlik, to......
  • Battista v. US
    • United States
    • U.S. District Court — Southern District of New York
    • 31 Mayo 1995
    ...Lines, Inc., 451 F.2d 1329, 1333 (2d Cir.1971) (Moore, J., concurring in part and dissenting in part); Candiano v. Moore-McCormack Lines, Inc., 251 F.Supp. 654, 660 (S.D.N.Y.1966), aff'd, 382 F.2d 961 (2d Cir. 1967), cert. denied, 390 U.S. 1027, 88 S.Ct. 1416, 20 L.Ed.2d 284 7. Plaintiffs' ......
  • Neal v. Saga Shipping Co., SA
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • 23 Junio 1969
    ...negligence rests on the defendant. See, e.g., United States v. Smith, 5 Cir., 1955, 220 F.2d 548; Candiano v. Moore-McCormack Lines, Inc., 1966, S.D.N.Y., 251 F.Supp. 654, 661, affirmed, 2 Cir., 1967, 382 F.2d 961. It is sometimes said that there is a presumption that a deceased exercised d......
  • Fleming v. American Export Isbrandtsen Lines, Inc., 177-178
    • United States
    • U.S. Court of Appeals — Second Circuit
    • 19 Noviembre 1971
    ...as a district court judge: "The burden of proving damage and damages is, of course, on plaintiff. . . ." Candiano v. Moore-McCormack Lines, Inc., 251 F.Supp. 654, 660 (S.D.N.Y.1966), aff'd, 382 F.2d 961 (2d Cir. 1967), cert. denied, 390 U.S. 1027, 88 S.Ct. 1416, 20 L.Ed.2d 284 (1968) (admir......
  • Request a trial to view additional results