Catlin v. Board of Registration of Architects

Citation604 N.E.2d 1301,414 Mass. 1
PartiesJohn CATLIN v. BOARD OF REGISTRATION OF ARCHITECTS.
Decision Date23 December 1992
CourtUnited States State Supreme Judicial Court of Massachusetts Supreme Court

Michael J. Stone, Boston, for plaintiff.

Daniel W. Halston, Asst. Atty. Gen., for defendant.

Before LIACOS, C.J., and WILKINS, NOLAN, LYNCH and GREANEY, JJ.

NOLAN, Justice.

On September 12, 1991, after the parties had filed cross motions for summary decision, the Board of Registration of Architects (board) issued a final decision and order which ruled that John Catlin had violated G.L. c. 112, § 60G (e ) (1990 ed.), by affixing his seal to architectural plans not prepared by either himself or his subordinates. The board suspended for six months Catlin's registration to practice architecture in the Commonwealth, but stayed the suspension and placed Catlin on probation for two years. Pursuant to G.L. c. 112, § 64 (1990 ed.), Catlin appealed from the board's decision. A single justice of this court reserved and reported the case to the full court on the administrative record. After reviewing the record, we conclude that there was no error in the board's decision.

The facts of this case are undisputed. On March 7, 1986, Ziegler Cooper, Inc. (Ziegler Cooper), an out-of-State architectural firm with no member of its staff registered in Massachusetts, contracted with the owners of the Border Cafe Restaurant in Cambridge to provide "schematic designs, design development, interior architectural design, and furnishings selection services" for a proposed renovation of the restaurant. According to the contract, Ziegler Cooper was to "coordinate with" a local architect regarding site investigations and existing conditions and to confer with regulatory authorities to ensure that the design was in compliance with local building codes. The restaurant owners retained their rights to final review and approval of the designs.

Ziegler Cooper submitted completed plans and drawings to the designated local architect on or about June 3, 1986. A dispute subsequently arose between the restaurant owners and the local architect over whether the plans were in compliance with local codes. The local architect was fired, and Ziegler Cooper eventually contracted with another registered architect, John Catlin. The terms of that agreement provided that Ziegler Cooper was to "prepare construction documentation for the project," and that John Catlin & Associates would be responsible only for "permitting and coordination with local authorities ... [and] [a]ny necessary field verification and coordination with structural or [mechanical, electrical, and plumbing] engineers for the purpose of completing the construction documentation." Ziegler Cooper informed the restaurant owners of its proposed agreement with Catlin and also informed them that Catlin's seal would appear on the drawings submitted for final permit approval. Catlin reviewed at least two "progress sets" of drawings, 1 made on-site evaluations, met with local building code authorities, and noted revisions in the plans which would be necessary to satisfy the building code. Ziegler Cooper then revised the plans in accordance with Catlin's notations. Catlin affixed his seal on the final drawings which were submitted to the Cambridge building department for approval on October 14, 1986. There is no evidence that either Catlin or his associates drafted any part of the construction documents.

1. Error of law. The heart of this dispute is the proper interpretation of the word "prepared" in G.L. c. 112, § 60G(e ). The statute authorizes the board to "revoke, suspend or annul the certificate of registration ... or otherwise discipline a registrant, upon proof satisfactory to the board ... (e ) that the holder of such certificate of registration has permitted or suffered his official seal to be affixed to any plans, specifications or drawings not prepared by him or under his personal supervision by his regularly employed subordinates" (emphasis added). Catlin argues that his actions were proper because he "prepared" the plans within the plain meaning of the statute. He urges that the proper interpretation of "prepared" would include any acts which adapted, qualified, or made ready the plans for use. See Black's Law Dictionary 1182 (6th ed. 1990) ("To provide with necessary means; to make ready...."); Webster's New Int'l Dictionary 1952 (2d ed. 1959) ("To fit, adapt, or qualify beforehand for a particular purpose ..."). See also Medlin v. Florida State Bd. of Architecture, 382 So.2d 708, 710 (Fla.Dist.Ct.App.), cert. denied, 376 So.2d 71 (Fla.1979).

We have held that "[w]hile courts should look to dictionary definitions and accepted meanings in other legal contexts ... their interpretations must remain faithful to the purpose and construction of the statute as a whole" (citations omitted). Commonwealth v. One 1987 Mercury Cougar Auto., 413 Mass. 534, 537-538, 600 N.E.2d 571 (1992). Read in conjunction with other provisions in the statute, "prepared" in § 60G excludes the actions taken by Catlin in this case. First, § 60F, which parallels § 60G, provides that "[a] registered architect shall impress his seal on any plans or specifications only if ... he was the author of such plans and specifications or in responsible charge of their preparation" (emphasis added). The seal is meant to show authorship of or responsibility for the plans. Catlin was not the author of the plans, nor did he produce the plans in this case; he reviewed not the work of his regularly employed subordinates in his normal place of business, 2 2 but rather plans drawn by an independent architectural firm based outside Massachusetts. 3

Catlin's reliance on Deck House, Inc. v. New Jersey State Bd. of Architects, 531 F.Supp. 633 (D.N.J.1982) and Medlin, supra, is misplaced. 4 The New Jersey statute in Deck House, supra at 637-638, is inapposite. The architect in Medlin, unlike Catlin, made "substantial changes" 5 in the plans and drew a new site plan for one of the projects. Medlin, supra at 710.

Supervision is not enough. The board reads its statutory mandate to require a greater degree of involvement by a registered Massachusetts architect to ensure the safety of the people of the Commonwealth. Thus, without sufficient evidence that the board's interpretation of "prepared" in § 60G is inconsistent with its statutory authority, we defer to the board's judgment. See G.L. c. 30A, § 14(7).

2. Procedural error. Catlin claims that by failing to consider all the evidence in the record and by failing to construe the evidence in the light most favorable to him, the board committed a procedural error sufficient to warrant remand or reversal under G.L. c. 30A, § 14(7)(d ) (1990 ed.). 6 Specifically, Catlin charges that the board did not consider portions from the transcript of the trial of a related Federal case referenced in his memorandum in support of his motion for summary decision. To support this charge, Catlin points out that the board's final decision fails to note that an associate in Catlin's office also reviewed the plans and noted necessary revisions and that Catlin's firm as a whole spent approximately sixty hours on the Border Cafe project. This evidence appears in the trial transcript but nowhere in the board's final decision.

The board, however, expressly stated that it relied on the "Chronological Document Index" provided by Catlin, the pleadings, and the briefs of the parties. Since the transcript was part of Catlin's brief, this court will presume that the board reviewed the entire record, absent evidence to the contrary. Although an agency's adjudicative body must review all the evidence in the record, it need only record findings which were necessary for it to decide the issue and provide the courts with a basis for judicial review. See Hamilton v. Department of Pub. Utils., 346 Mass. 130, 137, 190 N.E.2d 545 (1963) (statement of reasons for agency decision required by G.L. c. 30A, § 11 ). Thus, the choice by the board or, indeed, by a court not to refer in a decision to a particular piece of evidence does not imply the failure to consider that evidence when ruling on the issue.

Moreover, even if the board did fail to review the trial transcript, this error was harmless. The appealing party has the burden of showing that his "substantial rights ... may have been prejudiced" by the agency's error. See G.L. c. 30A, § 14(7). After reviewing the pages of the transcript in the administrative record, we find that it does not contain any information which might have produced a different result, and, therefore, Catlin suffered no harm. The information it does provide merely illustrates further the undisputed fact that John Catlin & Associates spent time reviewing Ziegler Cooper's architectural plans and noting revisions required by local law; it does not provide any additional evidence that Catlin or his associates "prepared" the plans as required by law. Cf. Glovsky v. Holly Point Estates, Inc., 354 Mass. 94, 98, 236 N.E.2d 202 (1968) (no injury where facts otherwise established).

In arguing that the board did not construe the evidence in the light most favorable to him, Catlin misconstrues the law. The right of a party facing summary decision to have the facts viewed in a favorable light, Hub Assocs. v. Goode, 357 Mass. 449, 451, 258 N.E.2d 733 (1970), does not entitle that party to a favorable decision. Conversely, summary judgment entered against a party does not mean that the evidence was not viewed in that party's favor. In making a summary decision, the board must determine that there is no genuine issue as to any material facts and then rule as a matter of law. Mass.R.Civ.P. 56, 365 Mass. 824 (1974). In this matter the facts were undisputed. We find the evidence sufficient to support the board's decision as a matter of law.

3. Commerce clause. On the assumption, arguendo, that Catlin has standing...

To continue reading

Request your trial
35 cases
  • Doucette v. Mass. Parole Bd.
    • United States
    • Appeals Court of Massachusetts
    • October 29, 2014
    ...an issue for appeal from an agency's decision, a party must raise the issue before the agency.” Catlin v. Board of Registration of Architects, 414 Mass. 1, 7 n. 7, 604 N.E.2d 1301 (1992). See Rivas v. Chelsea Hous. Authy., 464 Mass. 329, 336, 982 N.E.2d 1147 (2013) ( “arguments not made bef......
  • Town of Weymouth v. Mass. Dep't of Envtl. Prot.
    • United States
    • U.S. Court of Appeals — First Circuit
    • June 3, 2020
    ...to Algonquin for such a violation affects only the allocation of costs as between those parties. See Catlin v. Bd. of Registration of Architects, 414 Mass. 1, 604 N.E.2d 1301, 1305 (1992) ("The appealing party has the burden of showing that his ‘substantial rights ... may have been prejudic......
  • Sullivan v. Superintendent, Mass. Corr. Inst.-Shirley, 19-P-1734
    • United States
    • Appeals Court of Massachusetts
    • September 27, 2022
    ...[improperly considered] because the commission's decision did not depend on that testimony"); Catlin v. Board of Registration of Architects, 414 Mass. 1, 7, 604 N.E.2d 1301 (1992) (party's substantial rights not prejudiced where administrative record "does not contain any information which ......
  • Doe v. Sex Offender Registry Bd.
    • United States
    • Appeals Court of Massachusetts
    • October 4, 2022
    ...[improperly considered], because the commission's decision did not depend on that testimony"); Catlin v. Board of Registration of Architects, 414 Mass. 1, 7, 604 N.E.2d 1301 (1992) (party's substantial rights not prejudiced where administrative record "does not contain any information which......