Dolan v. City of Tigard, 93-518

CourtUnited States Supreme Court
Writing for the CourtRehnquist
Citation129 L. Ed. 2d. 304,114 S. Ct. 2309,512 U.S. 374
PartiesFlorence DOLAN, Petitioner v. CITY OF TIGARD.
Decision Date24 June 1994
Docket Number93-518

512 U.S. 374
114 S.Ct. 2309
129 L.Ed.2d 304
Florence DOLAN, Petitioner

v.

CITY OF TIGARD.

No. 93-518.
Supreme Court of the United States
Argued March 23, 1994.
Decided June 24, 1994.
Syllabus *

The City Planning Commission conditioned approval of petitioner Dolan's application to expand her store and pave her parking lot upon her compliance with dedication of land (1) for a public greenway along Fanno Creek to minimize flooding that would be exacerbated by the increases in impervious surfaces associated with her development and (2) for a pedestrian/bicycle pathway intended to relieve traffic congestion in the City's Central Business District. She appealed the Commission's denial of her request for variances from these standards to the Land Use Board of Appeals (LUBA), alleging that the land dedication requirements were not related to the proposed development and therefore constituted an uncompensated taking of her property under the Fifth Amendment. LUBA found a reasonable relationship between (1) the development and the requirement to dedicate land for a greenway, since the larger building and paved lot would increase the impervious surfaces and thus the runoff into the creek, and (2) alleviating the impact of increased traffic from the development and facilitating the provision of a pathway as an alternative means of transportation. Both the State Court of Appeals and the State Supreme Court affirmed.

Held: The city's dedication requirements constitute an uncompensated taking of property. Pp. ____.

(a) Under the well-settled doctrine of "unconstitutional conditions," the government may not require a person to give up a constitutional right in exchange for a discretionary benefit conferred by the government where the property sought has little or no relationship to the benefit. In evaluating Dolan's claim, it must be determined whether an "essential nexus" exists between a legitimate state interest and the permit condition. Nollan v. California Coastal Comm'n, 483 U.S. 825, 837, 107 S.Ct. 3141, 3148, 97 L.Ed.2d 677. If one does, then it must be decided whether the degree of the exactions demanded by the permit conditions bears the required relationship to the projected impact of the proposed development. Id., at 834, 107 S.Ct. at 3147. Pp. ____.

(b) Preventing flooding along Fanno Creek and reducing traffic congestion in the District are legitimate public purposes; and a nexus exists between the first purpose and limiting development within the creek's floodplain and between the second purpose and providing for alternative means of transportation. Pp. ____.

(c) In deciding the second question — whether the city's findings are constitutionally sufficient to justify the conditions imposed on Dolan's permit — the necessary connection required by the Fifth Amendment is "rough proportionality." No precise mathematical calculation is required, but the city must make some sort of individualized determination that the required dedication is related both in nature and extent to the proposed development's impact. This is essentially the "reasonable relationship" test adopted by the majority of the state courts. Pp. ____.

(d) The findings upon which the city relies do not show the required reasonable relationship between the floodplain easement and Dolan's proposed building. The Community Development Code already required that Dolan leave 15% of her property as open space, and the undeveloped floodplain would have nearly satisfied that requirement. However, the city has never said why a public, as opposed to a private, greenway is required in the interest of flood control. The difference to Dolan is the loss of her ability to exclude others from her property, yet the city has not attempted to make any individualized determination to support this part of its request. The city has also not met its burden of demonstrating that the additional number of vehicle and bicycle trips generated by Dolan's development reasonably relates to the city's requirement for a dedication of the pathway easement. The city must quantify its finding beyond a conclusory statement that the dedication could offset some of the traffic demand generated by the development. Pp. ____.

317 Ore. 110, 854 P.2d 437 (1993), reversed and remanded.

REHNQUIST, C.J., delivered the opinion of the Court, in which O'CONNOR, SCALIA, KENNEDY, and THOMAS, JJ., joined. STEVENS, J., filed a dissenting opinion, in which BLACKMUN and GINSBURG, JJ., joined. SOUTER, J., filed a dissenting opinion.

David B. Smith, Tigard, OR, for petitioner.

Timothy V. Ramis, Portland, OR, for respondent.

Edwin S. Kneedler, Washington, DC, for U.S., as amicus curiae by special leave of the Court.

Chief Justice REHNQUIST delivered the opinion of the Court.

Petitioner challenges the decision of the Oregon Supreme Court which held that the city of Tigard could condition the approval of her building permit on the dedication of a portion of her property for flood control and traffic improvements. 317 Ore. 110, 854 P.2d 437 (1993). We granted certiorari to resolve a question left open by our decision in Nollan v. California Coastal Comm'n, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677 (1987), of what is the required degree of connection between the exactions imposed by the city and the projected impacts of the proposed development.

I

The State of Oregon enacted a comprehensive land use management program in 1973. Ore.Rev.Stat. §§ 197.005-197.860 (1991). The program required all Oregon cities and counties to adopt new comprehensive land use plans that were consistent with the statewide planning goals. §§ 197.175(1), 197.250. The plans are implemented by land use regulations which are part of an integrated hierarchy of legally binding goals, plans, and regulations. §§ 197.175, 197.175(2)(b). Pursuant to the State's requirements, the city of Tigard, a community of some 30,000 residents on the southwest edge of Portland, developed a comprehensive plan and codified it in its Community Development Code (CDC). The CDC requires property owners in the area zoned Central Business District to comply with a 15% open space and landscaping requirement, which limits total site coverage, including all structures and paved parking, to 85% of the parcel. CDC, ch. 18.66, App. to Pet. for Cert. G16-G17. After the completion of a transportation study that identified congestion in the Central Business District as a particular problem, the city adopted a plan for a pedestrian/bicycle pathway intended to encourage alternatives to automobile transportation for short trips. The CDC requires that new development facilitate this plan by dedicating land for pedestrian pathways where provided for in the pedestrian/bicycle pathway plan.1

The city also adopted a Master Drainage Plan (Drainage Plan). The Drainage Plan noted that flooding occurred in several areas along Fanno Creek, including areas near petitioner's property. Record, Doc. No. F, ch. 2, pp. 2-5 to 2-8; 4-2 to 4-6; Figure 4-1. The Drainage Plan also established that the increase in impervious surfaces associated with continued urbanization would exacerbate these flooding problems. To combat these risks, the Drainage Plan suggested a series of improvements to the Fanno Creek Basin, including channel excavation in the area next to petitioner's property. App. to Pet. for Cert. G13, G38. Other recommendations included ensuring that the floodplain remains free of structures and that it be preserved as greenways to minimize flood damage to structures. Record, Doc. No. F, ch. 5, pp. 5-16 to 5-21. The Drainage Plan concluded that the cost of these improvements should be shared based on both direct and indirect benefits, with property owners along the waterways paying more due to the direct benefit that they would receive. Id., ch. 8, p. 8-11. CDC Chapters 18.84, 18.86 and CDC § 18.164.100 and the Tigard Park Plan carry out these recommendations.

Petitioner Florence Dolan owns a plumbing and electric supply store located on Main Street in the Central Business District of the city. The store covers approximately 9,700 square feet on the eastern side of a 1.67-acre parcel, which includes a gravel parking lot. Fanno Creek flows through the southwestern corner of the lot and along its western boundary. The year-round flow of the creek renders the area within the creek's 100-year floodplain virtually unusable for commercial development. The city's comprehensive plan includes the Fanno Creek floodplain as part of the city's greenway system.

Petitioner applied to the city for a permit to redevelop the site. Her proposed plans called for nearly doubling the size of the store to 17,600 square feet, and paving a 39-space parking lot. The existing store, located on the opposite side of the parcel, would be razed in sections as construction progressed on the new building. In the second phase of the project, petitioner proposed to build an additional structure on the northeast side of the site for complementary businesses, and to provide more parking. The proposed expansion and intensified use are consistent with the city's zoning scheme in the Central Business District. CDC § 18.66.030. App. to Brief for Petitioner C1-C2.

The City Planning Commission granted petitioner's permit application subject to conditions imposed by the city's CDC. The CDC establishes the following standard for site development review approval:

"Where landfill and/or development is allowed within and adjacent to the 100-year floodplain, the city shall require the dedication of sufficient open land area for greenway adjoining and within the floodplain. This area shall include portions at a suitable elevation for the construction of a pedestrian/bicycle pathway within the floodplain in accordance with the adopted pedestrian/bicycle plan." CDC § 18.120.180.A.8, App. to Brief for Respondent.

Thus, the Commission required that petitioner dedicate the portion...

To continue reading

Request your trial
891 practice notes
  • Eastern Enterprises v. Apfel, 9742
    • United States
    • United States Supreme Court
    • June 25, 1998
    ...intestacy, e.g., Hodel v. Irving, 481 U.S. 704, 107 S.Ct. 2076, 95 L.Ed.2d 668 (1987); creation of an easement, Dolan v. City of Tigard, 512 U.S. 374, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994); Nollan v. California Coastal Comm'n, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677 (1987); right to b......
  • Kamaole Pointe Development Lp v. County of Maui, No. CV. 07-00447 DAE-LEK.
    • United States
    • United States District Courts. 9th Circuit. United States District Court (Hawaii)
    • July 3, 2008
    ...set forth in Nollan v. California Coastal Comm'n, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677 (1987) and Dolan v. City of Tigard, 512 U.S. 374, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994); (2) the Ordinance, on its face, imposes an unconstitutional "leveraging" regime of exactions in that: (a) ......
  • Dakota, Minn. & Eastern R.R. Corp. v. South Dakota, No. CIV. 02-4083.
    • United States
    • United States District Courts. 8th Circuit. United States District Courts. 8th Circuit. District of South Dakota
    • December 6, 2002
    ...a landowner to grant an easement outright presents a physical occupation case and most likely a taking. See Dolan v. City of Tigard, 512 U.S. 374, 384, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994); see also Nollan v. California Coastal Comm'n, 483 U.S. 825, 834, 107 S.Ct. 3141, 97 L.Ed.2d 677 (19......
  • Koontz v. St. Johns River Water Mgmt. Dist., No. 11–1447.
    • United States
    • U.S. Supreme Court
    • June 25, 2013
    ...failed the requirements of Nollan v. California Coastal Comm'n, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677, and Dolan v. City of Tigard, 512 U.S. 374, 114 S.Ct. 2309, 129 L.Ed.2d 304. Those cases held that the government may not condition the approval of a land-use permit on the owner's r......
  • Request a trial to view additional results
843 cases
  • Eastern Enterprises v. Apfel, 9742
    • United States
    • United States Supreme Court
    • June 25, 1998
    ...intestacy, e.g., Hodel v. Irving, 481 U.S. 704, 107 S.Ct. 2076, 95 L.Ed.2d 668 (1987); creation of an easement, Dolan v. City of Tigard, 512 U.S. 374, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994); Nollan v. California Coastal Comm'n, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677 (1987); right to b......
  • Pierce v. King, No. 5:94-CRT-523-BO.
    • United States
    • United States District Courts. 4th Circuit. Eastern District of North Carolina
    • March 7, 1996
    ...amend. V ("nor shall private property be taken for public use, without just compensation."); Dolan v. City of Tigard, ___ U.S. ___, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994); Nollan v. California Coastal Commission, 483 U.S. 825, 107 S.Ct. 3141, 97 L.Ed.2d 677...
  • USA v. Arbert Pool, No. 09-10303.
    • United States
    • United States Courts of Appeals. United States Court of Appeals (9th Circuit)
    • September 14, 2010
    ...110 S.Ct. 1632, 109 L.Ed.2d 1 (1990). 14 In Scott, we explained: The “unconstitutional conditions” doctrine, cf. Dolan v. City of Tigard, 512 U.S. 374, 385, 114 S.Ct. 2309, 129 L.Ed.2d 304 (1994), limits the government's ability to exact waivers of rights as a condition of benefits, even wh......
  • San Diego Cnty. Water Auth. v. Metro. Water Dist. of S. Cal., A146901
    • United States
    • California Court of Appeals
    • June 21, 2017
    ...one to surrender a constitutional right in exchange for a discretionary benefit. ( 12 Cal.App.5th 1159 Dolan v. City of Tigard (1994) 512 U.S. 374, 385, 114 S.Ct. 2309, 129 L.Ed.2d 304.) When receipt of a public benefit is conditioned upon the waiver of a constitutional right, the " ‘govern......
  • Request a trial to view additional results
1 firm's commentaries
50 books & journal articles
  • The 'Euclidean' Strategy: Authorizing and Implementing the Legislative Districting of Permissible Land Uses
    • United States
    • Land use planning and the environment: a casebook
    • January 23, 2010
    ...who claimed that the government had, by regulatory means, taken their private property without compensation: Dolan v. City of Tigard, 512 U.S. 374, 384 (1994) (“right to exclude others”); Nollan v. California Coastal Comm’n, 483 U.S. 825, 831 (1987) (“right to exclude others”); Hodel v. Irv......
  • Case List
    • United States
    • Bargaining for Development Case List
    • July 19, 2003
    ...of Huntington Beach , 22 Cal. 2d 580, 140 P.2d 392 (1943) Denning v. Maui , 52 Haw. 653, 485 P.2d 1048 (1971) Dolan v. City of Tigard , 512 U.S. 374, 114 S. Ct. 2309, 129 L. Ed. 2d 304, 24 ELR 21083 (1994) Donwood, Inc. v. Spokane County , 90 Wash. App. 389, 957 P.2d 775 (1998) Dowerk v. Ch......
  • Review of Adverse Decisions
    • United States
    • Wetlands Deskbook Part I. Clean Water Act §404 Programs
    • November 11, 2009
    ...ELR 20045 (Fed. Cir. 2002) (relevant parcel is not limited to wetland area but includes entire property with developable uplands). 84. 114 S. Ct. 2309, 24 ELR 21083 (1994). 85. 114 S. Ct. at 2319. 86. 114 S. Ct. at 2319-20. 87. 30 Fed. Cl. 63, 24 ELR 20185 (1993), af’d without opinion , 39 ......
  • List of Case Citations
    • United States
    • Wetlands Deskbook Appendices
    • November 11, 2009
    ...Dolan v. City of Tigard, 114 S. Ct. 2309, 24 ELR 21083 (1994) ........................................................112 Donnell v. United States, 834 F. Supp. 19, 24 ELR 20463 (D. Me. 1993) ........................................... 76 Dufau v. United States, 22 Cl. Ct. 156, 21 ELR 20814......
  • Request a trial to view additional results
1 provisions
  • Chapter 1128, SB 2849 – Real Property
    • United States
    • Tennessee Session Laws
    • January 1, 2022
    ...and applied by the United States Supreme Court in Nollan v. California Coastal Comm'n, 483 U.S. 825 (1987), and Dolan v. City of Tigard, 512 U.S. 374 (1994); now, BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE: SECTION 1. Tennessee Code Annotated, Section 13-3-403, is amend......

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT