Environmental Protection Agency v. National Crushed Stone Association Costle v. Consolidation Coal Co

Decision Date02 December 1980
Docket NumberNo. 79-770,79-770
Citation101 S.Ct. 295,449 U.S. 64,66 L.Ed.2d 268
PartiesENVIRONMENTAL PROTECTION AGENCY, Petitioner, v. NATIONAL CRUSHED STONE ASSOCIATION et al. Douglas COSTLE, Administrator, Environmental Protection Agency, Petitioner, v. CONSOLIDATION COAL CO. et al
CourtU.S. Supreme Court
Syllabus

Under § 301(b) of the Federal Water Pollution Control Act, the Environmental Protection Agency (EPA) is to set 1977 effluent limitations for categories of point sources, requiring such sources to meet standards based on application of the "best practicable control technology currently available" (BPT), and 1987 limitations, requiring all point sources to meet standards based on application of the "best available technology economically achievable" (BAT). Section 301(c) of the Act provides for variances from 1987 BAT effluent limitations for individual point sources upon a showing "that such modified requirements (1) will represent the maximum use of technology within the economic capability of the owner or operators; and (2) will result in reasonable further progress toward the elimination of the discharge of pollutants." However, the Act contains no similar variance provision authorizing consideration of the economic ability of the individual operator to meet the cost of complying with 1977 BPT standards. In 1977, the EPA promulgated BPT pollution discharge limitations for the coal mining industry and for certain portions of the mineral mining and processing industry. Under the regulations, a greater than normal cost of implementation will be considered in acting on a request for a variance, but a variance will not be granted on the basis of the applicant's economic inability to meet the cost of implementing the uniform standard. Respondents sought review of the regulations in various Courts of Appeals, challenging both the substantive standards and the variance clause. All of the petitions were transferred to the Court of Appeals for the Fourth Circuit, which set aside the variance provision as unduly restrictive and required the EPA to consider, inter alia, the factors set out in § 301(c), including the applicant's economic capability.

Held : The Court of Appeals erred in not accepting the EPA's interpretation of the Act. The EPA is not required by the Act to consider economic capability in granting variances from its uniform BPT standards. Pp. 73-85.

(a) The statute's plain language does not support the Court of Appeals' position. Section 301(c)'s requirement for a BAT variance of "reasonable further progress" toward the elimination of pollutant discharges refers to the prior BPT standard, but there is no comparable prior standard with respect to BPT limitations. And since BPT limitations do not require an industrial category to commit the maximum resources economically possible to pollution control, even if affordable, the § 301(c) BAT variance factor as to the maximum use of technology within the applicant's economic capability is inapposite in the BPT context. More importantly, under the Act, the Administrator of the EPA, in determining BPT limitations, is directed to consider the benefits of effluent reductions as compared to the cost of pollution control in defining the best practicable technology at a level that would effect the 1977 goal of substantially reducing total pollution produced by each industrial category. Thus, the statute contemplated regulations that would require a substantial number of point sources with the poorest performances either to conform to BPT standards or to cease production. To allow a BPT variance based on economic capability and not to require adherence to the prescribed minimum technology would permit the employment of the very practices that the Administrator had rejected in establishing the best practicable technology currently available in the industry. Pp. 73-78.

(b) The EPA's interpretation of the statutory language is also supported by the legislative history, which shows that Congress understood that the economic capability provision of § 301(c) was limited to BAT variances; foresaw and accepted the economic hardship, including the closing of some plants, that BPT effluent limitations would cause; and took certain steps to alleviate this hardship, steps which did not include allowing a BPT variance based on economic capability. Pp. 79-83.

(c) In the face of § 301(c)'s explicit limitation to BAT variances and in the absence of any other specific direction in the statute to provide for BPT variances in connection with permits for individual point sources, the Administrator adopted a reasonable construction of the statutory mandate, and the Court of Appeals erred in concluding that, since BAT limitations are to be more stringent than BPT limitations, the variance provision for the latter must be at least as flexible as that for the former with respect to affordability. Pp. 83-84.

CA 4, 601 F.2d 111 (first case) and CA 4, 604 F.2d 239 (second case), reversed.

Andrew J. Levander, Washington, D. C., for petitioner, pro hac vice, by special leave of the Court.

George C. Freeman, Jr., Richmond, Va., for the respondents Consolidation Coal Company, et al.

Theodore L. Garrett, Washington, D. C., for respondents National Crushed Stone Association, et al.

Justice WHITE delivered the opinion of the Court.

In April and July 1977, the Environmental Protection Agency (EPA), acting under the Federal Water Pollution Control Act (Act), as amended, 86 Stat. 816, 33 U.S.C. § 1251 et seq., promulgated pollution discharge limitations for the coal mining industry and for that portion of the mineral mining and processing industry comprising the crushed-stone, construction-sand, and gravel categories.1 Although the Act does not expressly authorize or require variances from the 1977 limitation, each set of regulations contained a variance provision.2 Respondents sought review of the regulations in various Courts of Appeals, challenging both the substantive standards and the variance clause.3 All of the petitions for review were transferred to the Court of Appeals for the Fourth Circuit. In National Crushed Stone Assn. v. EPA, 601 F.2d 111 (1979), and in Consolidation Coal Co. v. Costle, 604 F.2d 239 (1979), the Court of Appeals set aside the variance provision as "unduly restrictive" and remanded the provision to EPA for reconsideration.4

To obtain a variance from the 1977 uniform discharge limitations a discharger must demonstrate that the "factors relating to the equipment or facilities involved, the process applied, or other such factors relating to such discharger are fundamentally different from the factors considered in the establishment of the guidelines." Although a greater than normal cost of implementation will be considered in acting on a request for a variance, economic ability to meet the costs will not be considered.5 A variance, therefore, will not be granted on the basis of the applicant's economic inability to meet the costs of implementing the uniform standard.

The Court of Appeals for the Fourth Circuit rejected this position. It required EPA to "take into consideration, among other things, the statutory factors set out in § 301(c)," which authorizes variances from the more restrictive pollution limitations to become effective in 1987 and which specifies economic capability as a major factor to be taken into account.6 The court held that

" 'if [a plant] is doing all that the maximum use of technology within its economic capability will permit and if such use will result in reasonable further progress toward the elimination of the discharge of pollutants . . . no reason appears why [it] should not be able to secure such a variance should it comply with any other requirements of the variance.' " 601 F.2d, at 124, quoting from Appalachian Power Co. v. Train, 545 F.2d 1351, 1378 (CA4 1976).

We granted certiorari to resolve the conflict between the decisions below and Weyerhaeuser Co. v. Costle, 191 U.S.App.D.C. 309, 590 F.2d 1011 (1978), in which the variance provision was upheld. 444 U.S. 1069, 100 S.Ct. 1011, 62 L.Ed.2d 750.

I

We shall first briefly outline the basic structure of the Act, which translates Congress' broad goal of eliminating "the discharge of pollutants into the navigable waters," 33 U.S.C. § 1251(a)(1), into specific requirements that must be met by individual point sources.7

Section 301(b) of the Act, 33 U.S.C. § 1311(b) (1976 ed. and Supp. III), authorizes the Administrator to set effluent limitations for categories of point sources.8 With respect to existing point sources, the section provides for implementation of increasingly stringent effluent limitations in two steps. The first step, to be accomplished by July 1, 1977, requires all point sources to meet standards based on "the application of the best practicable control technology currently available [BPT] as defined by the Administrator. . . ." § 301(b)(1)(A). The second step, to be accomplished by July 1, 1987, requires all point sources to meet standards based on application of the "best available technology economically achievable [BAT] for such category or class. . . ." 9 § 301(b)(2)(A). Both sets of limitations-BPT's followed within 10 years by BAT's-are to be based upon regulatory guidelines established under § 304(b).

Section 304(b) of the Act, 33 U.S.C. § 1314(b), is again divided into two sections corresponding to the two levels of technology, BPT and BAT. Under § 304(b)(1) the Administrator is to quantify "the degree of effluent reduction attainable through the application of the best practicable control technology currently available [BPT] for classes and categories of point sources. . . ." In assessing the BPT the Administrator is to consider

"the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application, . . . the age of equipment and facilities involved, the process employed, the engineering...

To continue reading

Request your trial
179 cases
  • Doe v. General Services Admin.
    • United States
    • U.S. District Court — District of Maryland
    • July 27, 1982
    ...as the GSA is neither specifically nor alone charged with administering the Privacy Act. Cf. EPA v. National Crushed Stone Ass'n, 449 U.S. 64, 83-85, 101 S.Ct. 295, 306-307, 66 L.Ed.2d 268 (1980) (EPA and Federal Water Pollution Control Act); Ford Motor Credit Co. v. Milhollin, 444 U.S. 555......
  • Murray Energy Corp. v. McCarthy
    • United States
    • U.S. District Court — Northern District of West Virginia
    • October 17, 2016
    ...thus place us in a position to consider such remedial legislation as may be necessary to ameliorate those effects.'" EPA v. Nat'l Crushed Stone Ass'n, 449 U.S. 64, 83 n.24 (quoting Representative Fraser from legislative record). Finally, this Court finds that the plaintiffs fall within the ......
  • United States v. Cargill, Inc.
    • United States
    • U.S. District Court — District of Delaware
    • February 12, 1981
    ...This basic statutory framework has been elucidated in a substantial number of cases. See e. g., EPA v. National Crushed Stone Association, ___ U.S. ___, 101 S.Ct. 295, 66 L.Ed.2d 268 (1980); E. I. DuPont de Nemours & Co. v. Train, 430 U.S. 112, 97 S.Ct. 965, 51 L.Ed.2d 204 (1977); EPA v. Ca......
  • Chemical Manufacturers Association v. Natural Resources Defense Council, Inc United States Environmental Protection Agency v. Natural Resources Defense Council, Inc
    • United States
    • U.S. Supreme Court
    • February 27, 1985
    ...reference to the full range of current practices, to which the Administrator was to refer." EPA v. National Crushed Stone Assn., 449 U.S. 64, 77-78, 101 S.Ct. 295, 303-304, 66 L.Ed.2d 268 (1980). It is, essentially, not an exception to the standard-setting process, but rather a more fine-tu......
  • Request a trial to view additional results
15 books & journal articles
  • Can Wetland Property Be Developed? Regulated Activities and Statutory Exemptions
    • United States
    • Wetlands Deskbook Part I. Clean Water Act §404 Programs
    • November 11, 2009
    ...See also Consolidation Coal Co. v. Costle, 604 F.2d 239, 9 ELR 20511 (4th Cir. 1979), rev’d sub nom . EPA v. Nat’l Crushed Stone Ass’n, 449 U.S. 64, 10 ELR 20924 (1980); United States v. Earth Sciences, Inc., 599 F.2d 368, 9 ELR 20542 (10th Cir. 1979). 117. No. 89-54-N (E.D. Va. Aug. 3, 198......
  • Can Wetland Property Be Developed? Regulated Activities and Statutory Exemptions
    • United States
    • Wetlands deskbook. 4th edition -
    • April 11, 2015
    ...See also Consolidation Coal Co. v. Costle, 604 F.2d 239, 9 ELR 20511 (4th Cir. 1979), rev’d sub nom . EPA v. National Crushed Stone Ass’n, 449 U.S. 64, 10 ELR 20924 (1980); United States v. Earth Sciences, Inc., 599 F.2d 368, 9 ELR 20542 (10th Cir. 1979). 112. No. 89-54-N (E.D. Va. Aug. 3, ......
  • Uncontainable Threat: the Nation's Coal Ash Ponds
    • United States
    • Emory University School of Law Emory Law Journal No. 69-1, 2019
    • Invalid date
    ...18-1307).32. See Consolidation Coal Co. v. Costle, 604 F.2d 239, 249-50 (4th Cir. 1979), rev'd sub nom. EPA v. Nat'l Crushed Stone Ass'n, 449 U.S. 64 (1980); Plaintiff-Appellee's Petition for Rehearing and for Rehearing En Banc at 5, Va. Elec. & Power Co., 903 F.3d 403 (No. 17-1895).33. Ups......
  • Wetlands protection
    • United States
    • Introduction to environmental law: cases and materials on water pollution control - 2d Edition
    • July 23, 2017
    ...of the statute and applicable regulations are to be considered with an appropriate level of deference. EPA v. Nat’l Crushed Stone Ass’n , 449 U.S. 64 (1980). he plaintifs contend that the EPA has exceeded its authority under the CWA because the veto was based on recreational and ishery cond......
  • Request a trial to view additional results