Forkin v. Furness Withy & Co.

Decision Date17 October 1963
Docket NumberNo. 24,Docket 28159.,24
Citation323 F.2d 638
PartiesVincent FORKIN, Plaintiff-Appellant, v. FURNESS WITHY & CO., Ltd., Defendant-Appellee.
CourtU.S. Court of Appeals — Second Circuit

Jacob Rassner, New York City (Zale & De Vito, New York City), for plaintiff-appellant.

Joseph M. Cunningham, New York City (Kirlin, Campbell & Keating, New York City) (Vernon S. Jones, New York City, of counsel), for defendant-appellee.

Before LUMBARD, Chief Judge, and FRIENDLY and SMITH, Circuit Judges.

FRIENDLY, Circuit Judge.

In this action for personal injuries, brought by Forkin, a longshoreman, against Furness Withy & Co., Ltd., owner and operator of the "Queen of Bermuda," in the Supreme Court for New York County and removed to the District Court for the Southern District of New York, 28 U.S.C. §§ 1332(a) (2) and 1441, Judge Dawson directed a verdict for the defendant at the close of the plaintiff's case on the issue of liability. We hold the direction was proper.

The facts as developed by plaintiff's witnesses were as follows: Forkin was a longshoreman in the employ of Bay Ridge Operating Company, a stevedoring contractor which operated Pier 95 North River — a pier that was regularly used by the Queen of Bermuda as well as by vessels not operated by Furness Withy & Co. Forkin reported for duty one morning at 8 A.M.; the Queen was then in mid-stream, approaching the pier. His first task was to help secure a line thrown from the ship as she entered the slip. He then was summoned by his foreman, Carroll, also a Bay Ridge employee, to help affix to the ship a conveyor belt which was being hoisted from the pier to a side-port for use in unloading baggage and loading ship's stores. The normal method for lifting the conveyor off the pier to the proper position was to attach a wire or rope fall to a wire bridle fastened to the outer end of the conveyor, to pass the fall through a block on top of the pier, and then to hoist it with an electric winch on the pier below. On the morning in question access to the winch was obstructed by newsprint previously unloaded from some other ship. Instead of moving enough of this to give access to the winch, the stevedore foreman caused a rope to be passed around the conveyor and ordered a crane operator to lift the conveyor toward the ship by hooking onto the rope. When the conveyor had thus been raised to what was considered the correct angle, the foreman and Forkin went out on it to shackle wires at its end to cleats on the ship. The conveyor had not quite reached the side port, but was close enough for Forkin to rest one hand on the ship's side. Finding that the conveyor was positioned too low to fasten the wires, the foreman ordered the crane-man to lift it; the rope, worn by the conveyor, snapped and the conveyor fell, pitching Carroll into the water and injuring Forkin's leg. Later the conveyor was positioned by use of the wire bridle and winch. So far as appears, all this equipment was owned by the stevedores; certainly it was operated by them.

The complaint predicated liability of the shipowner both upon negligence and upon unseaworthiness. The absence of evidence to support the former theory is too clear to require extended discussion. The decision to take the easy way of hoisting the conveyor by a rope and crane rather than move enough newsprint to give access to the winch was made by the stevedore foreman, without any participation or knowledge by the shipowner. Neither can the ship be charged with negligence for the blocked access to the winch. While the failure to remove this obstruction and gain access to the winch was negligent on the part of Bay Ridge, no basis exists for charging either the condition or the failure to cure it to a shipowner not shown to have exercised any control at any time over the stevedoring activities on the pier. West v. United States, 361 U.S. 118, 123, 80 S.Ct. 189, 4 L.Ed.2d 161 (1959); Gallagher v. United States Lines Co., 206 F.2d 177 (2 Cir.), cert. denied, 346 U.S. 897, 74 S.Ct. 221, 98 L.Ed. 398 (1953). Although "control of the impact zone is not essential for negligence," Gutierrez v. Waterman S.S. Corp., 373 U.S. 206, 211, 83 S.Ct. 1185, 1188-1189, 10 L.Ed.2d 297 (1963), some careless act or failure to act must be established. We perceive no basis for concluding that a ship is required either to have someone on shore to police the previous placing of other cargo on a pier at which she is about to land or the dispositions taken by stevedores in regard to it, or to maintain a watch on board the ship to see that shore installations to be used on her arrival have been properly rigged by a qualified independent contractor hired to do exactly that.

With respect to unseaworthiness we start with the inevitable quotation "That the vessel and her owner are * * * liable to an indemnity for injuries received by seamen in consequence of the unseaworthiness of the ship, or a failure to supply and keep in order the proper appliances appurtenant to the ship." The Osceola, 189 U.S. 158, 175, 23 S.Ct. 483, 487, 47 L.Ed. 760 (1903). Two issues emerge. Was Forkin acting as a "seaman" within the expansion of that term wrought by Seas Shipping Co. v. Sieracki, 328 U.S. 85, 66 S.Ct. 872, 90 L.Ed. 1099 (1946)? And was there such a defect in "the proper appliances appurtenant to the ship" or, in Judge Learned Hand's phrasing, "in hull, gear and stowage," Grillea v. United States, 232 F.2d 919, 922 (2 Cir., 1956), as to render her not "reasonably suitable for her intended service"? Mitchell v. Trawler Racer, Inc., 362 U.S. 539, 550, 80 S.Ct. 926, 933, 4 L.Ed.2d 941 (1960). Defendant properly concedes that liability to the plaintiff for unseaworthiness is not ruled out because the accident did not happen aboard ship — a position for which Gutierrez, supra, 373 U.S. at 214, 83 S.Ct. at 1190-1191, 10 L.Ed.2d 297, is a fortiori authority.

Examination of the Sieracki opinion gives rise to serious doubt whether its rationale is fairly applicable to a longshoreman readying a shore-based installation for fixation to the ship. The basis of the decision was that "Historically the work of loading and unloading is the work of the ship's service, performed until recent times by members of the crew," 328 U.S. at 96, 66 S.Ct. at 878, 90 L.Ed. 1099, and that the owner ought not be permitted to escape liability for unseaworthiness to those who do "the ship's work," 328 U.S. at 93, 66 S.Ct. at 876-877, 90 L.Ed. 1099, by having this performed by men "employed and furnished by another." 328 U.S. at 92-93, 96, 66 S.Ct. at 876-877, 878, 90 L.Ed. 1099. Within the last decade, the premise that "the work of loading and unloading" was "performed until recent times by members of the crew," has been challenged as much too broad. See Tetreault, Seaman, Seaworthiness, and the Rights of Harbor Workers, 39 Corn.L.Q. 381, 413-14 (1954); Shields and Byrne, Application of the "Unseaworthiness" Doctrine to Longshoremen, 111 U. of Pa.L.Rev. 1137, 1140-47 (1963); it seems certain that, at least in major ports, the stevedore has a long lineage, reaching back to ancient times and, in this country, to the nation's earliest days. See Swift v. The Happy Return, 23 Fed.Cas. 560, 561 (No. 13697) (D.Pa.1799). However all this may be, and for us, of course, the historical premise of Sieracki stands, it takes some imagination to suppose that the work of putting out a gangplank from shore to ship was generally done by members of the ship's crew,1 even in instances where the crew did handle, or assist in, subsequent unloading and loading. Plaintiff conceded that, to his knowledge, work of this sort is performed not by sailors from the ship but by shoreside men. Cf. Partenweederei, MS Belgrano v. Weigel, 299 F.2d 897, 902 (9 Cir.), cert. denied, 371 U.S. 830, 83 S.Ct. 49, 9 L.Ed.2d 67 (1962).

We find it unnecessary to pass on this issue, since we hold that the defect which caused Forkin's injury was not within the shipowner's warranty of seaworthiness. Equipment maintained on a pier to establish connection with a ship is not an "appliance appurtenant to the ship" or part of the ship's "gear," at least until it has been affixed. Although "the shipowner's actual or...

To continue reading

Request your trial
15 cases
  • Victory Carriers, Inc v. Law 8212 54 18 8212 19, 1971
    • United States
    • U.S. Supreme Court
    • December 13, 1971
    ...produced substantial confusion in the lower courts; the cases are impossible to rationalize. Denying compensation: Forkin v. Furness Withy & Co., 323 F.2d 638 (CA2 1963), McKnight v. N. M. Paterson & Sons, 286 F.2d 250 (CA6 1960), cert. denied, 368 U.S. 913, 82 S.Ct. 189, 7 L.Ed.2d 130 (196......
  • Huff v. Matson Navigation Company
    • United States
    • U.S. Court of Appeals — Ninth Circuit
    • October 22, 1964
    ...conditions must be borne by the shipowner and not the seaman." Our attention has also been called to the case of Forkin v. Furness Withy & Co., 2d Cir., 323 F.2d 638, in which a divided court held the shipowner not liable to a longshoreman who received injuries due to the failure of a rope ......
  • Harney v. William M. Moore Building Corporation
    • United States
    • U.S. Court of Appeals — Second Circuit
    • April 7, 1966
    ...Waterways Corp., 96 F.Supp. 234 (E.D.Mo.1951); Ross v. S. S. Zeeland, 240 F.2d 820 (4 Cir. 1951). Cases such as Forkin v. Furness Withy & Co., 323 F.2d 638 (2 Cir. 1963) and Shenker v. United States, 322 F.2d 622 (2 Cir. 1963), cert. den. American Stevedores v. Shenker, 376 U.S. 907, 84 S.C......
  • Metzger v. SS Kirsten Torm
    • United States
    • U.S. District Court — District of Maryland
    • September 24, 1965
    ...McKnight, supra, the Sixth Circuit affirmed per curiam the decision of the district court denying liability. In Forkin v. Furness Withy & Co., 2 Cir., 323 F.2d 638, 641 (1963), the majority opinion by Judge Friendly, in which Chief Judge Lumbard concurred, held that "equipment maintained on......