Friedman, Alschuler & Sincere v. Arlington Structural Steel Co., Inc.
Decision Date | 23 August 1985 |
Docket Number | No. 84-0835,84-0835 |
Citation | 95 Ill.Dec. 87,140 Ill.App.3d 556,489 N.E.2d 308 |
Court | United States Appellate Court of Illinois |
Parties | , 95 Ill.Dec. 87 FRIEDMAN, ALSCHULER & SINCERE, Plaintiff-Appellant, v. ARLINGTON STRUCTURAL STEEL COMPANY, INC., a corporation and the Berger Steel Company, Inc., a corporation, Defendants-Appellees. |
LORENZ, Justice, delivered the opinion of the court, as modified, upon denial of the petition for rehearing:
Plaintiff-appellant Friedman, Alschuler & Sincere ("FAS"), an architectural partnership, appeals from the dismissal of its amended complaint seeking indemnity from defendants Arlington Structural Steel Co., Inc. ("Arlington") and Berger Steel Co., Inc. ("Berger") ("defendants"). The order sustained defendants' motion to dismiss the amended complaint for failure to state a cause of action pursuant to section 2-615 of the Code of Civil Procedure. (Ill.Rev.Stat.1983, ch. 110, par. 2-615.) The issue on appeal is whether or not the amended complaint stated a cause of action. We affirm.
On August 25, 1972, FAS entered into a written agreement with Shure Brothers, Inc. ("Shure") whereby FAS agreed to design and oversee the construction of an office and warehouse facility ("the building") for Shure. Shure subsequently signed a separate agreement with W.E. O'Neil Construction Company ("O'Neil"), naming O'Neil as general construction manager for the building. O'Neil, in turn, contracted with Arlington (the "O'Neil-Arlington contract") to obtain the necessary labor and materials for the erection of the structural steel required for the building. Article II of the O'Neil-Arlington contract stated that Arlington's work would not be accepted for contract purposes unless it satisfied the general contractor (O'Neil), the architect (FAS), and the owner (Shure). Arlington subsequently contracted with Berger to obtain the steel needed for the O'Neil-Arlington contract.
The building was completed in early 1975. In January 1979, a portion of the roof of the building collapsed. It was determined that the collapse was caused by poor workmanship and the use of faulty materials. It was further determined that an uncollapsed portion of the roof was structurally unsound and in need of repair. Consequently, Shure asserted a claim against O'Neil and FAS for the costs of repair and reinforcement of the uncollapsed portion of the roof. The claim was compromised, resulting in FAS' assumption of 25% or $221,908.82 of the repair costs involved.
FAS then demanded contribution and indemnification from Arlington and Berger for costs incurred in the compromise settlement. Following defendants' rejection of these demands, FAS filed the instant action for indemnification against defendants Arlington and Berger. Following Berger's motion for summary judgment and Arlington's motion to strike and dismiss, the trial court dismissed FAS' initial complaint on the grounds that it failed to state a cause of action. FAS filed an amended complaint in four counts: Count I for contractual indemnification against Arlington as a third-party beneficiary; Count II for implied indemnification against both defendants; Count III against both defendants based on an active-passive negligence theory; and Count IV for contribution against both defendants. Upon motions of defendants, the trial court dismissed the amended complaint with prejudice. This appeal followed. However, FAS has withdrawn Count IV from the appeal.
OPINIONThe trial court dismissed the amended complaint pursuant to section 2-615 of the Code of Civil Procedure. (Ill.Rev.Stat.1983, ch. 110, par. 2-615.) Under section 2-615, dismissal is proper when a pleading or portion thereof is insufficient at law. Dismissal is a drastic action however, and therefore, only proper if the complaint cannot be sustained under the facts alleged by the complainant. (Johnston v. City of Bloomington (1979), 77 Ill.2d 108, 32 Ill.Dec. 319, 395 N.E.2d 549.) Accordingly, we must determine whether or not the dismissal of the amended complaint was proper under this standard.
FAS initially contends that Count I of the amended complaint was improperly dismissed. FAS maintains that Count I states a claim against Arlington based on the indemnity provision in Article XVI of the O'Neil-Arlington contract. FAS argues that the language of Article XVI indicates FAS was intended as a third-party beneficiary of the indemnification provision.
General contract principles governing construction and interpretation are applied to contracts of indemnity. (Mosley v. Northwestern Steel & Wire Co. (1979), 76 Ill.App.3d 710, 31 Ill.Dec. 853, 394 N.E.2d 1230.) Where the intent of the parties is clearly ascertainable, the meaning of the indemnity contract is determined by the language used therein, unless such language is found to be ambiguous. Montgomery Ward & Co., Inc. v. Wetzel (1981), 98 Ill.App.3d 243, 53 Ill.Dec. 366, 423 N.E.2d 1170.
Article XVI of the O'Neil-Arlington contract states as follows:
To continue reading
Request your trial-
VanKirk v. Green Const. Co., 22791
...Star Borough v. Roen Design Assocs., Inc., 727 P.2d 758 (Alaska 1986), 7 and Friedman, Alschuler and Sincere v. Arlington Structural Steel Co., Inc., 140 Ill.App.3d 556, 95 Ill.Dec. 87, 489 N.E.2d 308 (1985). In Fairbanks North Star Borough, the borough entered into a design contract with R......
-
Jordan v. Jewel Food Stores, Inc., 10 C 340
...(holding that a business and business-invitee relationship does not qualify); Friedman, Alschuler & Sincere v. Arlington Structural Steel Co., 140 Ill.App.3d 556, 95 Ill.Dec. 87, 489 N.E.2d 308, 310 (1985) (same, for architect and subcontractor); see generally Allison v. Shell Oil Co., 113 ......
-
Illinois Cent. Gulf R.R. v. American President Lines, Inc., s. 86-2964
...of a pretort relationship, although it does help to illuminate the issue. In Friedman, Alschuler & Sincere v. Arlington Structural Steel Co. (1986), 140 Ill.App.3d 556, 557, 95 Ill.Dec. 87, 489 N.E.2d 308, a portion of the roof of a building collapsed as a result of poor workmanship and the......
-
Gerwin v. Livingston County Bd.
...385, 390 (1983). Keeping in mind that dismissal is a drastic way to end a case (Friedman, Alschuler, & Sincere v. Arlington Structural Steel Co., 140 Ill.App.3d 556, 95 Ill. Dec. 87, 489 N.E.2d 308 (1985)) and a court should not dismiss a complaint unless it clearly appears that no set of f......