Jupiter Energy Corp. v. F.E.R.C.

Decision Date12 April 2005
Docket NumberNo. 04-60041.,04-60041.
PartiesJUPITER ENERGY CORPORATION, Petitioner, v. FEDERAL ENERGY REGULATORY COMMISSION, Respondent.
CourtU.S. Court of Appeals — Fifth Circuit

H. Christopher Bartolomucci (argued), Hogan & Hartson, Washington, DC, for Petitioner.

David H. Coffman (argued), Dennis Lane, FERC, Washington, DC, for Respondent.

James T. McManus, Wright & Talisman, Washington, DC, for Amici Curiae.

Petition for Review of an Order of the Federal Energy Regulatory Commission.

Before REAVLEY, HIGGINBOTHAM and DEMOSS, Circuit Judges.

PATRICK E. HIGGINBOTHAM, Circuit Judge:

Jupiter Energy Corporation petitions this Court for review of the Federal Energy Regulatory Commission's determination that Jupiter's two pipelines perform a "transportation" function rather than a "gathering" function, thereby subjecting them to the Commission's jurisdiction under Section 1(b) of the Natural Gas Act.1 We grant the petition, vacate the Commission's decision, and remand.

I

Jupiter owns and operates two natural gas pipelines in the Gulf of Mexico. Both pipelines originate at "Platform 39A," which is owned by Jupiter's parent corporation, Union Oil Company of California. The Jupiter system is located roughly 10 miles offshore from Louisiana in about 40 feet of water. The first Jupiter pipeline (the "8-inch line") is roughly eight inches in diameter and is 3.2 miles long. It heads from Platform 39A and, before reaching the shoreline, feeds into a pipeline owned by Transcontinental Gas Pipe Line Corporation ("Transco"). The Transco line is a lateral line ranging from 12 to 24 inches in diameter and running parallel to the shore at the point of connection with the 8-inch line. The second Jupiter pipeline (the "10-inch line") is roughly ten inches in diameter and is 10.2 miles long. It runs from Platform 39A (via an abandoned platform) to a land-based pipeline on the shore owned by Tennessee Gas Transmission Company. Platform 39A is itself downstream from other pipelines. Gas arrives at Platform 39A from 16 wells via non-jurisdictional Unocal facilities: ten platforms and several pipelines ranging from four to eight inches in diameter.

In 1966, the Commission's predecessor, the Federal Power Commission ("FPC"), determined that Jupiter provided gas "transportation" services. That classification was carried on by the Commission, thereby subjecting Jupiter to the Commission's jurisdiction. On November 4, 2002, Jupiter requested that the Commission change the status of its pipelines from jurisdictional to non-jurisdictional — that is, that the Commission determine that Jupiter is engaged in "gathering" rather than "transportation" of natural gas. The Commission unanimously denied this request, and denied rehearing by a 2-1 vote. Jupiter now seeks our review.

II

Section 1(b) of the Natural Gas Act governs "the transportation of natural gas in interstate commerce."2 In Section 1(b), Congress "not only prescribed the intended reach of the Commission's power, but also specified the areas into which this power was not to extend."3 This Section expressly exempts from the Commission's jurisdiction the "production" or "gathering" of natural gas.4 However, "[e]xceptions to the primary grant of jurisdiction in [Section 1(b)] are to be strictly construed,"5 and the terms "production" and "gathering" are to be "narrowly confined to the physical acts of drawing the gas from the earth and preparing it for the first stages of distribution."6

The Commission employs a multi-factor "primary function" test developed in the Farmland Industries case.7 Under this test, "the Commission determines whether, with reference to the specific facts and circumstances of the particular facility in question, its primary function is gathering."8 The test, which has continued to evolve, currently employs both physical and non-physical factors. The physical factors include:

(1) the facility's length and diameter, (2) the extension of the facility beyond the central point in the producing field, (3) the facility's geographic configuration, (4) the placement of compressors and processing plants, (5) the location of wells along all or part of the facility, and (6) operating pressures.9

The non-physical factors are "the purpose, location, and operation of the facility, the general business activity of the owner of the facility, and whether the jurisdictional determination is consistent with the objectives of the NGA and Natural Gas Policy Act."10 The Commission "do[es] not consider any single factor to be determinative and recognize[s] that all factors do not necessarily apply in all situations."11

In 1990, in Amerada Hess Corporation, the Commission modified the primary function test with respect to offshore facilities by applying "a sliding scale which will allow the use of gathering pipelines of increasing lengths and diameters in correlation to the distance from shore and the water depth of the offshore production area" based on the observation that as a result of "recent advances in engineering and available technology, offshore drilling operations continue to move further offshore and further from existing interstate pipeline interconnections."12 Following our 1997 decision in Sea Robin Pipeline Co. v. FERC,13 the Commission again modified the test with respect to offshore facilities by

(1) adopting an additional analytical element applicable to systems that contain a centralized aggregation point; (2) adjusting the weight to be afforded the "behind-the-plant" criterion so that the location of processing plants is not necessarily determinative and can be outweighed by other factors; and (3) focusing primarily on physical factors.14

The primary function test, as thus modified, was subsequently upheld.15

III
A

Under the Administrative Procedure Act, an agency determination shall be set aside if it is "arbitrary, capricious, an abuse of discretion or otherwise not in accordance with law."16 "The fundamental precept that permits this deferential standard of review is that `an agency must cogently explain why it has exercised its discretion in a given manner' and `must supply a reasoned analysis' for any departure from other agency decisions."17 However, "a court is not to substitute its judgment for that of the agency" or "supply a reasoned basis for the agency's action that the agency itself has not given."18

B

Jupiter argues that the Commission's decision — that Jupiter's system is transportational — is arbitrary and capricious because one of its pipelines is upstream from a gathering pipeline.19 We agree.

In a prior matter, the Commission determined that a portion of the Transco pipeline, into which Jupiter's 8-inch line flows, is a non-jurisdictional gathering pipeline.20 That decision was upheld by the D.C. Circuit.21 In the present case, the Commission decided that Platform 39A represents the point at which gathering stops and transportation begins and, therefore, that Jupiter's two pipelines — including the one that flows into the Transco line — are jurisdictional transportation lines. The result is the following anomalous scenario: A series of gathering pipelines (upstream from Platform 39A) feeds (via Platform 39A) into a transportation pipeline (Jupiter's 8-inch line), which in turn feeds into a gathering pipeline (the Transco line). We are persuaded that this cannot be considered consistent.

In Sea Robin Pipeline Co., we suggested that there is one point on any given route where gathering stops and transportation begins:

Discomfort in drawing the jurisdictional line at points internal to an overall system may be soothed with the reminder that Congress did not intend to extend FERC's jurisdiction to all natural gas pipelines; indeed it demands the drawing of jurisdictional lines, even when the end of gathering is not easily located. . . .22

On remand in the Sea Robin case, the Commission acknowledged: "As noted by the Fifth Circuit, where gas is destined for interstate commerce, there is necessarily a point at which the collection or gathering of gas ends, and interstate transmission begins."23

The Commission already set the jurisdictional boundary downstream from one of Jupiter's pipelines. It is inconsistent and arbitrary for the Commission now to set a jurisdictional dividing point at Platform 39A. Given that the Commission's decision as to both of Jupiter's pipelines flowed — so to speak — from the conclusion that Platform 39A represents the point at which gathering ceases and transportation begins, the inconsistency generated in relation to the downstream non-jurisdictional line infects the whole of the Commission's decision. We decline to address Jupiter's additional arguments at this time.

IV

The Commission's decision is fatally flawed by the inconsistency of having the putative point where gathering ends and transportation begins upstream from a gathering pipeline. The petition for review is GRANTED. The decision of the Commission is VACATED and the case is REMANDED.

To continue reading

Request your trial
11 cases
  • Stage Stores, Inc. v. Gunnerson
    • United States
    • Texas Court of Appeals
    • October 8, 2015
    ...bring together the disparate elements and give some account of how the judge has reached his conclusion.").32 Jupiter Energy Corp. v. F.E.R.C., 407 F.3d 346, 349 (5th Cir.2005) ("[A]n agency must cogently explain why it has exercised its discretion in a given manner" and " ‘must supply a re......
  • Hornbeck Offshore Servs., L.L.C. v. Salazar
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • November 27, 2012
    ...the first moratorium was arbitrary and capricious” in violation of the Administrative Procedure Act. See, e.g., Jupiter Energy Corp. v. FERC, 407 F.3d 346, 349 (5th Cir.2005) (explaining that the Act requires “reasoned analysis” and a cogent explanation for agency action). In “answer to the......
  • Univ. of Tex. M.D. Anderson Cancer Ctr. v. U.S. Dep't of Health & Human Servs.
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • January 14, 2021
    ...agency must show that there are good reasons for the new [position]." (emphasis omitted) (citation omitted)); Jupiter Energy Corp. v. FERC , 407 F.3d 346, 349 (5th Cir. 2005) (agency action is arbitrary and capricious when it fails to "supply a reasoned analysis for any departure from other......
  • Williams Gas Processing-Gulf Coast Co. v. F.E.R.C.
    • United States
    • U.S. Court of Appeals — District of Columbia Circuit
    • December 19, 2006
    ...and capricious because Jupiter's transportation pipeline sat upstream of a Transco gathering pipeline. Jupiter Energy Corp. v. FERC, 407 F.3d 346, 350-51 (5th Cir.2005) ("Jupiter Appeal"). The Fifth Circuit noted that FERC's Jupiter orders produced an "anomalous scenario," to wit: "A series......