Larson v. Commonwealth Edison Co.

Decision Date29 September 1965
Docket NumberNo. 38637,38637
Citation211 N.E.2d 247,33 Ill.2d 316
PartiesStanley LARSON, Appellant, v. COMMONWEALTH EDISON COMPANY et al., Appellees.
CourtIllinois Supreme Court

Peterson, Lowry, Rall, Barber & Ross, Chicago (Harold W. Huff, James L. Tuohy and William E. Rattner, Chicago, of counsel), for appellant.

Bernard M. Mamet, Peter Fitzpatrick, Leonard M. Ring and John G. Phillips, Chicago (Leonard M. Ring, Chicago, of counsel), for amicus curiae International Assn. of Bridge, Structural and Ornamental Ironworkers-A.F.L., C.I.O.

Vogel & Vogel, Chicago (L. H. Vogel and Albert F. Manion, Chicago, of counsel), for appellee A. Kolflat d/b/a Sargent & Lundy.

Harry I. Parsons, Chicago, (Norton Wasserman and Charles D. Snewind Chicago, of counsel), for appellee Commonwealth Edison Co.

DAILY, Justice. *

Based upon a claimed violation of the Structural Work Act, more commonly known as the Scaffold Act (Ill.Rev.Stat.1957, chap. 48, pars. 60-69), the plaintiff, Stanley Larson, brought this action in the circuit court of Cook County against Commonwealth Edison Company and A. Kolflat, the latter doing business as Sargent & Lundy, to recover for personal injuries sustained when a scaffold on which plaintiff was working broke and fell. The trial court directed a verdict and judgment for defendant Sargent & Lundy, and a jury returned a verdict for defendant Edison upon which judgment was entered. On appeal by plaintiff both judgments were affirmed by the Appellate Court. (48 Ill.App.2d 349, 199 N.E.2d 265) We have granted plaintiff's petition for leave to appeal and, in addition, have permitted the filing of briefs by amici curiae.

Factual background shows that in November, 1955, Edison commenced the remodeling and rehabilitation of an electric generating plant it owned and operated in the city of Chicago. The plant consisted of several buildings, occupying an area of three city blocks, and the project entailed the removal of old equipment, cleaning out the interior of the buildings to the walls, and the installation of new equipment. To provide for continued plant operation, the work was accomplished in a progressive fashion and was done in 'units.' For example, prior to the removal of old turbines from Unit 8, new turbines were installed in Unit 7 and, before the work progressed to Unit 8, a temporary barricade or partition was erected between the two units so that demolition in Unit 8 could proceed without damaging what had been accomplished in Unit 7.

Edison entered into from 70 to 80 contracts with numerous contractors, each of whom was to perform specific work on the over-all project. The majority of the contracts were prepared by Sargent & Lundy, (hereinafter referred to as Sargent) a firm of consulting engineers specializing in the design of electrical generating stations, as were the work plan, structural designs, and specifications used in the construction work. These contracts specifically required the contractors to comply with the provisions of the Scaffold Act.

Plaintiff's employer, Paschen, had a contract for the work in Unit 7, one provision of which stated: 'The work shall be done under the general supervision and to the satisfaction of owner's Station Construction Department * * *.' The contract also obligated Paschen to perform additional work as directed by Edison and, in accordance therewith, a 'purchase order' was drawn by Edison whereby Paschen was directed to erect the barricade between Units 7 and 8. By the terms of the purchase order, Paschen was to: 'Furnish all labor, materials, tools and equipment required to install preliminary structural work for Unit No. 8, Crawford Station, as directed by the Station Construction Department, and in accordance with drawings to be issued by Sargent & Lundy.' To aid in the construction of the barricade, scaffolds were erected by Paschen employes and it was one of such scaffolds which broke, causing plaintiff to be thrown to the floor. As may be seen in greater detail from the opinion of the Appellate Court (48 Ill.App.2d 349, 199 N.E.2d 265), it is undisputed that the scaffold did not comply with rules promulgated by the Industrial Commission to implement the statute, and that plaintiff, who had no part in the erection of the scaffold, was injured as a direct result of such noncompliance.

Apart from intermittent visits by its chief engineer, Sargent had no personnel working at that construction site. However, six employees of Edison, all members of its Station Construction Department, were on the job at all times. According to one of the group, they exercised no control over the work, but merely inspected to see that the terms and specifications of the contracts were complied with. So far as the barricades were concerned, the same witness stated that the scope of their inspection did not extend to the kind or safety of the scaffold employed, but only to a determination of whether Edison 'got the type of barricade specified.' Representatives of Edison's Safety Department also visited the site periodically, and while their primary concern was the safety of Edison's operating personnel still on the premises, it appears they could make, but not enforce, safety suggestions to the contractors and their employees. Weekly work progress reports were compiled by Edison and, adhering to a long practice between the two firms for many years, copies of the reports were forwarded to Sargent. In addition weekly or bi-weekly meetings, presided over by Edison, were held to co-ordinate the sequence of the work, and were attended by representatives of all the contractors and by a representative of Sargent.

Although there is general accord between the other participants to the appeal that both Edison and Sargent may be sued as persons potentially having duties under the Scaffold Act, it is the contention of one amicus curiae, based principally on Breton v. Levinson, (1917), 207 Ill.App. 406, that we should discard all prior decisions and reconstrue the act as meaning that only the person or persons who actually erect a scaffold are subject to duty and liability under its terms. We see no beneficial purpose to be served by an extended discussion of this proposal. Suffice it to say, first, that such a construction was rejected, in principle at least, in Gannon v. Chicago, Milwaukee, St. Paul and Pacific Railway Co., 22 Ill.2d 305, 175 N.E.2d 785, after an exhaustive analysis of the statute and prior decisions; and second, that when sections 1 and 9 of the act are read together, (Ill.Rev.Stat.1957, chap. 48, pars. 60 and 69), the construction contended for cannot be sustained. (See also: Kennerly v. Shell Oil Co., 13 Ill.2d 431, 150 N.E.2d 134). Moreover, the legislature has apparently agreed with our interpretation of the act, since it has not seen fit to nullify or limit such construction by amending the statute.

The principal controversy between plaintiff and defendant Edison is whether the trial court erred when, over plaintiff's objection, it instructed the jury as follow: 'The Court instructs the jury that the plaintiff is not entitled to recover damages under the provisions of the Structural Work Act unless he has proven by a preponderance, or greater weight of the evidence, that the defendant, Commonwealth Edison Company, had charge of the work by retaining control and supervision of such work being performed by Paschen Contractors, Inc.' (Emphasis added.) The controlling section of the statute, which is section 9, makes no mention of either the retention or exercise of control and supervision, but imposes a duty of compliance, and liability for either willful violation or a failure to comply with the terms of the act, upon '(a)ny owner * * * having charge of the erection * * * (or) alteration * * * of any building * * * or other structure * * *.' Ill.Rev.Stat.1957, chap. 48, par. 69. (Emphasis added.)

It is the contention of the plaintiff, concurred in by a dissenting justice in the Appellate Court, that the instruction misstates the law and improperly limits and restricts the language of the statute, first, when it requires proof of the retention of supervision and control as the basis for Edison's liability, and second, when it also requires proof of the retention of supervision and control over the specific work being done by Paschen. Conforming to the views of the majority opinion in the Appellate Court, it is contended by Edison, first, that the words 'control and supervision' employed in the instruction are the legal equivalent of the statutory language 'having charge of,' and second, that under the factual circumstances presented in this case it was essential to focus the attention of the jury on Paschen's work.

While it may be conceded that some of the decisions in this jurisdiction involving the Scaffold Act appear to have equated 'having charge' with 'supervision and control' in varying degrees, it is our opinion the language of the statute, and the legislative intent it reflects, do not permit the conclusion that the terms are the inflexible and unbending legal equivalent of the other. The term 'having charge of' is a generic term of broad import, and although it may include supervision and control,...

To continue reading

Request your trial
197 cases
  • Crothers v. LaSalle Institute
    • United States
    • Illinois Supreme Court
    • 17 Octubre 1977
    ...(Kobus v. Formfit Co. (1966), 35 Ill.2d 533, 221 N.E.2d 633) and actual exercise of supervision or control (Larson v. Commonwealth Edison Co. (1965), 33 Ill.2d 316, 211 N.E.2d 247) are not conclusive, as to being in charge and therefore as to liability, but only factors to be considered by ......
  • Carney v. Union Pac. R.R. Co.
    • United States
    • Illinois Supreme Court
    • 20 Octubre 2016
    ...to exercise his control with reasonable care." Restatement (Second) of Torts § 414 (1965).¶ 34 In Larson v. Commonwealth Edison Co., 33 Ill.2d 316, 325, 211 N.E.2d 247 (1965), we implicitly recognized section 414 of the first Restatement of Torts as an expression of Illinois common law. Sec......
  • Lyle v. Sester
    • United States
    • United States Appellate Court of Illinois
    • 31 Diciembre 1981
    ... ... (1979), 79 Ill.App.3d 386, 395-96, 34 Ill.Dec. 707, 398 N.E.2d 382; Kjellesvik v. Commonwealth Edison Co. (1979), 73 Ill.App.3d 773, 775-76, 29 Ill.Dec. 559, 392 N.E.2d 116; Hernandez v. Power ... (Larson v. Commonwealth Edison Co. (1965), 33 Ill.2d 316, 323, 211 N.E.2d 247; Gruszeczki v ... ...
  • Lee v. Six Flags Theme Parks, Inc.
    • United States
    • United States Appellate Court of Illinois
    • 9 Mayo 2014
    ...N.E.2d 208; see Joyce v. Mastri, 371 Ill.App.3d 64, 73, 308 Ill.Dec. 537, 861 N.E.2d 1102 (2007). In Larson v. Commonwealth Edison Co., 33 Ill.2d 316, 325, 211 N.E.2d 247 (1965), however, our supreme court first recognized Restatement section 414 as an expression of Illinois common-law negl......