No East-West Highway Committee, Inc. v. Whitaker
| Court | U.S. District Court — District of New Hampshire |
| Writing for the Court | BOWNES |
| Citation | No East-West Highway Committee, Inc. v. Whitaker, 403 F.Supp. 260 (D. N.H. 1975) |
| Decision Date | 17 October 1975 |
| Docket Number | Civ. A. No. 73-199. |
| Parties | NO EAST-WEST HIGHWAY COMMITTEE, INC. v. Robert H. WHITAKER, as New Hampshire Highway Commissioner, et al. |
COPYRIGHT MATERIAL OMITTED
Robert A. Backus, Devine, Millimet, Stahl & Branch, Manchester, N. H., Haynes N. Johnson, Bryan, Parmelee, Johnson & Bollinger, Stamford, Conn., for plaintiff.
John C. Boeckeler, Asst. Atty. Gen., Concord, N. H., Gary Randall, Land & Natural Resources Div., General Litigation Section, Dept. of Justice, Washington, D. C., for defendants.
Plaintiff alleges that the defendants are planning to construct a four-lane east-west limited access highway from the Connecticut River to the Merrimack River in contravention of various federal environmental statutes.1 National Environmental Policy Act of 1969, 42 U.S.C. § 4321 et seq. (NEPA); the Intergovernmental Cooperation Act of 1968, as amended, 42 U.S.C. § 4231 et seq. (ICA); and the Federal Aid Highway Act, as amended, 23 U.S.C. §§ 109(h), 128, and 138. Jurisdiction is pursuant to 5 U.S.C. §§ 701-706 and 28 U.S.C. § 1331.
Plaintiff contends that the incremental construction of four federally funded highway projects along New Hampshire Route 101, in conjunction with the commitment to construct a bypass in Milford, New Hampshire, which coincides with the recommendations contained in a State study for an east-west highway, constitutes a plan to construct a new four-lane east-west limited access highway in southern New Hampshire. Plaintiff further contends that the alleged plan is a "major Federal action," requiring the preparation of an Environmental Impact Statement (EIS) for the entire route corridor.
Defendants contend that there is no overall State or Federal plan to construct or relocate a new east-west highway, and that they have no legal duty to prepare an EIS for a study which is subject to extensive modification.
The following issues are presented to the court:
1. When does a preliminary highway route location study become a plan, recommendation or proposal to construct necessitating the preparation of an EIS for the entire route; and
2. Whether federal participation in the incremental stage construction of bypasses and widening of an existing highway, in accord with the State funded engineering study that recommends such construction as part of a new east-west highway, in conjunction with the use of Federal highway planning, research, and development funds, constitutes a "major Federal action" requiring the preparation of an EIS for the entire route.
Plaintiffs seeks a declaratory judgment that the defendants are planning or designing a new east-west highway for southern New Hampshire in the vicinity of the existing Route 9 — Route 101 corridor. (Route Corridor) In addition, plaintiff seeks to permanently enjoin the defendants from financing, planning, designing or constructing any portion of the new east-west highway pending the completion and approval of an EIS which considers the intrinsic environmental impact that route construction or relocation will have on the entire Route Corridor.
A hearing on the merits, pursuant to Fed.R.Civ.P. 65(a)(2), was held on August 7 and 8, 1975.
Route 9 is an east-west route beginning at the Vermont border, on the Connecticut River, in the vicinity of Brattleboro, and runs in an easterly direction to Keene, New Hampshire. At Keene, Route 9 terminates and, in effect, connects with Route 101, so that traffic traveling along Route 9 in an easterly direction can bypass Keene and continue unimpeded in an easterly direction.2
Route 101 is, for the most part, on the Federal-aid primary system. It extends from Keene in the west to Portsmouth in the east and passes around or through the cities, towns or villages of Keene, Marlboro, Dublin, Peterborough, Wilton, Amherst, Bedford, Manchester, Raymond, Epping, and Exeter. At Manchester, Route 101 intersects with the F. E. Everett Turnpike and Interstate Route I-93.3
West of the F. E. Everett Turnpike, along the route in question, "Route 101 is primarily a two-lane highway having four-lane limited access right-of-way portions, within which only two lanes have been constructed." (Stipulation No. 4) Construction has occurred in the areas "of Amherst-Milford, the Hillsborough-Cheshire county lines near Bonds Corners sic and Keene." (Stipulation No. 4)
The Route Corridor is the principal east-west highway in southern New Hampshire, serving local traffic, through traffic, interurban traffic (e. g., Keene to Nashua-Manchester), and interstate traffic. Route 9 intersects with I-91, a north-south interstate highway in Vermont, right next to the New Hampshire border; Route 101 intersects with I-93, a north-south interstate highway in southern New Hampshire. Both I-91 and I-93 connect with the interstate system running along the Eastern Seaboard of the United States.
In May, 1960, the New Hampshire Department of Public Works and Highways commissioned the consultant firm of Fay, Spofford, and Thorndike (FST) to prepare an engineering study and design report for the relocation of Route 101 as a limited access highway, on a new right-of-way, from Keene to a point on the F. E. Everett Turnpike near Thornton's Ferry. (Pl.'s Ex. 12-5) The FST Study was financed solely by State funds.
In 1962, FST presented to the NHDPW&H a study entitled "Design Report for the Relocation of Route 101, Keene to Merrimack." FST Study, Pl.'s Ex. 4-3) The FST Study concluded that "there will be definite need in the foreseeable future for a four-lane divided highway from Keene to a point on the F. E. Everett Turnpike between Manchester and Nashua." Id. at 8.
In order to attain the goal of route relocation or reconstruction, while at the same time improving the most deficient portions of Route 101, the Study proposed a "stage construction program." The program suggested an order of construction by listing numerically, according to their priority, ten stages of construction. (Pl.'s Ex. 5-18) The FST Study stated that "the completion of the stage construction . . . will provide a complete workable facility from Keene to Merrimack and high-type connections to points north and south via the F. E. Everett Turnpike." (Pl.'s Ex. 4-3, App. at 5)
In regard to the present status of the first four FST priorities, the parties have stipulated as follows:
The FST "Recommended Order of Stage Construction" describes ten numbered priorities. Projects for the improvement of Route 101 which are similar to parts of the first four priority recommendations of the FST study have been completed. Improvements of Route 101 which are substantially in the routes as shown by the recommendations of the FST study have been completed. Improvements of Route 101 which are substantially in the routes as shown by the recommendations of the FST study have been constructed in the areas of Milford and Amherst, Bonds Corners sic on the Cheshire-Hillsborough county lines and in Keene and are shown in red on Pl.'s Ex. 7-20. (Stipulation No. 16)
The parties have also stipulated that the State is presently planning the construction of the Milford bypass in the Wilton area as was suggested in FST's Priority No. 4. (Stipulation No. 17)
Concerning FST Priority No. 5, the parties stipulated as follows:
Priority No. 5 of the FST study recommended a relocation of Route 101 from Marlborough to a point near existing Route 101 at the Hillsborough-Cheshire county line in the Dublin area. Studies for improvement of Route 101 in the Dublin area are now taking place and include a line substantially corresponding to one shown in the FST report, several other lines not shown in the FST report, and the possibility of no improvement at all. (Stipulation No. 18; see also Dublin Construction, infra)
The FST Study still continues to be used "as a source of information to portions of Route 101 from Keene to Bedford by the Planning and Economics Division of the New Hampshire Department of Public Works and Highways." (Stipulation No. 15) The FST Study has not, however, been submitted to the Federal Works and Highways Administration (FHWA) for either their comment or approval.
In 1969, pursuant to Section 17 of the Federal Aid Highway Act of 1968, the NHDPW&H inventoried the State's highway system and functionally classified all state highways. As a consequence of this program, the Route 9 — Route 101 corridor was classified as a "principal arterial"4 highway having as its primary purpose the movement of automobile traffic which has "characteristics indicative of substantial statewide or interstate travel." "This principal arterial corridor is the only one running east-west in southern New Hampshire between the Connecticut River and the Merrimack River." (Stipulation No. 11)
It should be noted that the functional classification of the Route Corridor as a "principal arterial" highway was "for study purposes only and in no way represents a commitment or policy change by the Department of Transportation, the State's, or the local participating units of government."
In 1971, the NHDPW&H, pursuant to Section 121(a) of the Federal Aid Highway Act of 1970, prepared a "Needs Study" which projected New Hampshire's highway needs to the year 1990. On the basis of these projections, the NHDPW&H recommended the functional realignment of the State's highways.
As part of the Needs Study, and with a predictive eye to the future, the NHDPW&H prepared, in late 1970, a Functional Classification Study map. (Pl's. Ex. 16-12) This map discloses an intent to relocate Route 101 from Milford to the F. E. Everett Turnpike. This relocated portion of...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial
-
Ross v. Federal Highway Admin.
...for administering the federal-aid highway program, but "does not plan, design or locate highways." No East-West Highway Comm., Inc. v. Whitaker, 403 F.Supp. 260, 273-74 (D.N.H. 1975). On April 2, 1987, Congress allocated funds for the Trafficway as a demonstration and priority highway in Do......
-
Citizens for Responsible Area Growth v. Adams
...for determining whether an EIS should be prepared resides in the responsible federal agency." No East-West Highway Committee, Inc. v. Whitaker, 403 F.Supp. 260, 270 (D.N.H. 1975). It should be undertaken "before a significant project is launched." City of Boston v. Volpe, 464 F.2d 254, 257 ......
-
CHESAPEAKE BAY, ETC. v. Va. State Water Control Bd.
...The instant case is also distinguishable from Scottsdale Mall v. Indiana, 549 F.2d 484 (7th Cir. 1977) and No East-West Highway Comm., Inc. v. Whitaker, 403 F.Supp. 260 (D.N.H.1975), cases which plaintiffs have offered in support of their position. Those cases involve federal funding and hi......
-
No East-West Highway Committee, Inc. v. Chandler, EAST-WEST
...to do so and that study of the proposed highway was still too vague and preliminary to require an EIS. No East-West Highway Committee, Inc. v. Whitaker, 403 F.Supp. 260 (D.N.H.1975). The court said it would view any future construction comporting with any part of the FST study other than "b......