Rogers v. United States

Decision Date09 February 1972
Docket NumberNo. 31000.,31000.
Citation452 F.2d 1149
PartiesCecil D. ROGERS, Plaintiff-Appellant, v. UNITED STATES of America, Defendant-Third-Party Plaintiff-Appellee, v. JACKSONVILLE SHIPYARDS, INC., Third-Party Defendant-Appellee.
CourtU.S. Court of Appeals — Fifth Circuit

Billy J. Sanders, Sanders & Sanders and Waldman & Smallwood, Ned Johnson, Beaumont, Tex., Robert M. Smith, Jr., Jacksonville, Fla., for plaintiff-appellant.

Raymond D. Battocchi, Atty., Dept. of Justice, Washington, D. C., U. S. Atty., Jacksonville, Fla., Alfred H. O. Boudreau, Jr., Admiralty & Shipping Section, L. Patrick Gray, III, Asst. Atty. Gen., John L. Briggs, U. S. Atty., Morton Hollander, Michael C. Farrar, Dept. of Justice, Washington, D. C., for plaintiff-appellee.

John E. Houser, Jacksonville, Fla., for Jacksonville Shipyards Inc.

Before GEWIN, GOLDBERG and DYER, Circuit Judges.

DYER, Circuit Judge:

This is an appeal from the district court's judgment based upon a determination that a warranty of seaworthiness did not extend to a shipyard pipefitter who was injured while working aboard a ship that had just come out of drydock. We reverse.

The USNS REDSTONE, a government missile tracking ship, arrived at the Jacksonville Shipyards under its own power on May 11, 1968, for minor repairs and alterations. These reparations included cleaning, painting, part replacement, polishing the propeller, and the addition of a new sea chest. To install the sea chest a hole 18" x 21" had to be cut into the hull below the water line and piping was added to carry the sea water coolant back to the Auxiliary Machine Room (AMR). On May 16, 1968, the ship was placed in drydock to perform some of this work. Two days later the ship was removed from drydock and tied to a pier at the shipyard. The boilers and generator had been shut down and the ship utilized shore-based power.

On May 21, 1968, one day before the repairs were completed, Rogers was injured while installing sea chest piping in the AMR. The AMR space is filled with large machinery. In order to facilitate movement, deck plating is placed on angle irons that run between the machinery. Rogers and other repairmen working in these spaces had to remove this decking and lower themselves into the bilge to install the piping. To retrieve some needed tools Rogers lifted himself out of the bilge and while walking along the angle irons out of the AMR he slipped. He did not fall but the jolt further aggravated an existing back injury. He contends that oil and water in the bilge collected on the soles of his shoes and caused him to slip.

Rogers' suit is premised on the theories that the water and oil in the bilge amounted to an unseaworthy condition that caused his injury and, alternatively, because of this condition the shipowner breached his duty to provide Rogers with a safe place to work. Because we reverse the judgment on the ground that the oil and water in the bilge created an unseaworthy condition and that the warranty of seaworthiness extends to Rogers, we discuss only the law and facts pertinent to that cause of action.

The evidence is conflicting concerning the existence of water and oil in the bilge and its origin. The district court found, however, that the oil came from the machinery in the AMR and that the water spilled into the bilge when Rogers and his co-workers cut into existing water lines while installing the new pipe. We accept this finding.

The district court concluded that the warranty of seaworthiness did not extend to Rogers because (a) the REDSTONE was not in navigation at the time of the injury; (b) Rogers was not performing seaman's type work; and (c) the ship was under the control of the shipyards. While we do not question the underlying facts, we find the conclusions based upon them to be erroneous. Although these findings are usually denominated as factual, see e. g., Roper v. United States, 1961, 368 U.S. 20, 23, we do not review them with an eye on F.R.Civ.P. 52(a) because they were induced by faulty legal standards. Manning v. M/V Sea Road, 5 Cir. 1969, 417 F.2d 603, 607.

It is now well settled that the warranty of seaworthiness may extend to shore based repair workers. The Tungus v. Skovgaard, 1959, 358 U.S. 588; Pope & Talbot, Inc. v. Hawn, 1953, 346 U.S. 406. To determine whether the warranty is owed to Rogers we must focus ". . . upon the status of the ship, the pattern of repairs, and the extensive nature of the work contracted to be done, . . ." West v. United States, 1959, 361 U.S. 118, 122; Delome v. Union Barge Line Co., 5 Cir. 1971, 444 F.2d 225, 231. Applying the facts to this test we find that the REDSTONE was in navigation and that Rogers was performing work traditionally engaged in by seamen.

The REDSTONE Was in Navigation

In concluding that the REDSTONE was not in navigation the district court said, "the warranty of seaworthiness is extended to no one while a vessel is in drydock or thereafter until the vessel is ready for sea."1 This is not a correct statement of the law. See Delome v. Union Barge Line Co., supra at 230-231. Of course, if a vessel is not in navigation the warranty of seaworthiness to shore workers will not apply. Roper v. United States, supra at 23-24; Johnson v. Oil Transport Co., 5 Cir. 1971, 440 F.2d 109, 111. But the fact that a ship is or was in drydock is but one of the factors that must be considered in determining whether the vessel is in navigation.

Roper teaches that "the test for determining whether a vessel is in navigation is the `status of the ship,' West v. United States, 361 U.S. 118, 122 (1959)." In West the ship had been in "moth-balls" and was undergoing renovation to make her seaworthy again. Because of the magnitude of the undertaking and the fact that the contractor had complete control of the ship for this purpose, the Court held that the ship was not in maritime service (navigation). Here the REDSTONE, far from being in moth-balls prior to undergoing repairs, was actively engaged in maritime commerce and immediately resumed these activities upon completing ten days of repairs.

In assaying the status of the REDSTONE we look also to the type repairs the contractor performed. Delome v. Union Barge Line Co., supra at 232. Most of the REDSTONE work was replacing and cleaning parts and equipment. One of the more extensive items was the installation of a new sea chest, but even this cannot be considered a major repair or a structural change in the ship. The cost of the repairs, $91,142, does not indicate that this was a major undertaking. The repairs here are similar to those in Union Barge Line Corp. v. Allen, E.D.La.1965, 239 F.Supp. 1004, aff'd, 5 Cir. 1966, 361 F.2d 217 and Lawlor v. Socony-Vacuum Oil Co., 2 Cir. 1960, 275 F.2d 599, cert. denied, 363 U.S. 844. They are not sufficient, in legal contemplation, to take the ship out of navigation.

The status of the ship test also encompasses the question of the control of the ship. See, Watz v. Zapata Off-Shore Co., 5 Cir. 1970, 431 F.2d 100, 108. The trial court's finding that the REDSTONE was under the control of the shipyard is clearly erroneous. The crew were on board performing their normal duties. Logs were kept, watches were stood, and machinery in the AMR was operated. Crew members were working in the AMR on the day of the injury. The crew even undertook to pump the bilge where Rogers was working. Even if the yard workers had control over the particular areas where they were working, and here they did not, the warranty survives when the owner remains in general control of the vessel. Johnson v. Oil Transport Co., supra at 114; Lawlor v. Socony-Vacuum Oil Co., supra at 604.

The district court's conclusion that the warranty of seaworthiness will not extend to a shore-based worker when the owner has relinquished control of the ship to the contractor, in addition to being premised on a clearly erroneous fact finding, appears to be a variation of the relinquishment of control doctrine that was put to rest in Petterson v. Alaska S. S. Co. Inc., 9 Cir. 1953, 205 F.2d 478, aff'd, 1954, 347 U.S. 396. Control of the ship is a factor that is taken into account when determining the ship's status, as pointed out supra, but it is not a condition which, without more, negates the warranty of seaworthiness. See Watz v. Zapata Off-Shore Co., supra at 106, 108; Cf., Parker v. Cargill, 5 Cir. 1969, 417 F.2d 773; Moye v. Sioux City & New Orleans Barge Lines, Inc., 5 Cir. 1968, 402 F.2d 239.

Rogers Was Performing Traditional Seaman's Work

The mere fact that the shipowner contracts work to a third party in order to take advantage of the skill brought about by the modern division of labor does not release him from his responsibility of providing shore workers with a seaworthy vessel. Seas Shipping Co. v. Sieracki, 1946, 325 U.S. 85, 100. In order to come within the warranty's protection, the repair work being performed on the ship must be the type of work traditionally done by seamen. United Pilots Ass'n v. Halecki, 1959, 358 U.S. 613, 617. Applying the West test we must look to the pattern of repairs and the extensive or limited nature of the work contracted to be done rather than the specific type of work that each of the numerous shore-based workmen is doing on shipboard at the moment of the injury in determining whether the work was traditionally that of a seaman. Delome v. Union Barge Line Co. supra at 232; Johnson v. Oil Transport Co., supra at 117; Watz v. Zapata Off-Shore Co., supra at 108.

The installation of the sea chest and piping and the numerous minor refittings and additions were of the type which seamen have traditionally performed.2 This...

To continue reading

Request your trial
15 cases
  • Martinez v. Dixie Carriers, Inc.
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • March 29, 1976
    ...some of the spilled oil, Skovgaard slipped and fell to his death in eight feet of hot coconut oil. Still another case, Rogers v. United States, 5 Cir., 1972, 452 F.2d 1149, involved injuries suffered by a repairman while installing sea chest piping. Installation of the sea chest had require......
  • Sandoval v. Mitsui Sempaku KK Tokyo
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • June 16, 1972
    ...by the record. See Alaska Steamship Company v. Petterson, 347 U.S. 396, 74 S.Ct. 601, 98 L.Ed. 798 (1954). See also Rogers v. United States, 5 Cir., 1971, 452 F.2d 1149. Finally, Sandoval appeals the issue of damages. The District Court awarded judgment in the amount of $60,092.08. Appellan......
  • Copeland v. Oil Transport, Inc.
    • United States
    • U.S. District Court — Southern District of Alabama
    • June 27, 1973
    ...v. Union Barge Lines, 444 F. 2d 225 (5th Cir. 1971); other recent cases on this subject in the Fifth Circuit are: Rogers v. United States, 452 F.2d 1149 (5th Cir. 1972); Johnson v. Oil Transport, 440 F.2d 109 (5th Cir. 1971); Drake v. Dupont, 432 F.2d 276 (5th Cir. 1970); Grigsby v. Coastal......
  • McDermott, Inc. v. Boudreaux, 81-4309
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • June 28, 1982
    ...that a semisubmersible drilling barge temporarily moored for repairs remained a vessel in navigation. See also Rogers v. United States, 452 F.2d 1149, 1152 (5th Cir. 1971) (missile tracking ship tied to pier for repairs "in navigation"); Bodden v. Coordinated Caribbean Transport, Inc., 369 ......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT