Ryan Walsh Stevedoring Co. v. James Marine Service, Civ. A. No. 80-1582

Decision Date22 February 1983
Docket Number80-3760 and 81-1313.,Civ. A. No. 80-1582
Citation1983 AMC 2516,557 F. Supp. 457
PartiesRYAN WALSH STEVEDORING COMPANY, INC. v. JAMES MARINE SERVICE, INC., et al. In the Matter of the Complaint of JAMES MARINE SERVICE, INC., Owner of the M/V Hiawatha, for Exoneration From or Limitation of Liability. SOUTHERN PACIFIC TRANSPORTATION COMPANY v. RYAN WALSH STEVEDORING COMPANY, INC., et al.
CourtU.S. District Court — Eastern District of Louisiana

Francis Emmett, New Orleans, La., for plaintiff.

A. Gordon Grant, Jr., Montgomery, Barnett, Brown & Read, New Orleans, La., for defendants.

FINDINGS OF FACT AND CONCLUSIONS OF LAW

MENTZ, District Judge.

This litigation arises out of an accident that occurred when the D/B FRANK L, while in tow of the M/V HIAWATHA, collided with the Huey P. Long Bridge. As a result of the collision, both the bridge and the barge sustained damage. So, too, did the crane located on the D/B FRANK L. Indeed, as a result of the collision, the crane was lifted from its turntable and fell into the river. The owners and underwriters of the M/V HIAWATHA settled the claims of the bridge owners and filed a cross-claim against the D/B FRANK L, her owner and insurer for those damages. Southern Pacific Transportation Company, the owner and operator of a railroad, claims damages for loss of revenue during the time the bridge was being repaired because its trains were delayed in crossing the bridge. Jefferson Disposal Company, Inc., claims damages because during that time its garbage trucks could not use the bridge. This opinion addresses questions of liability only. It does not cover the limitation of liability prayed for by James Marine Service in Civil Action No. 80-3760. A non-jury trial was held on September 2 and 3, 1982.

Ryan Walsh Stevedoring Company, Inc. ("Ryan Walsh"), is an Alabama corporation engaged in stevedoring operations in the Port of New Orleans area and, in connection therewith, owned and operated the D/B FRANK L at all times pertinent to this litigation ("the barge"). James Marine Service, Inc. ("James Marine"), is a Louisiana corporation that owned and operated the M/V HIAWATHA (the "tug") at all times pertinent to this litigation.

On April 2, 1980, the boom of D/B FRANK L struck the highest span of the Huey P. Long Bridge. This bridge, which crosses the Mississippi River at Mile 106, just above the Port of New Orleans, is a fixed structure with roadways for automobile traffic on either side and railroad tracks in its mid-section. Maximum vertical clearance of the bridge is 153 feet at the low-water reference plane and 133 feet based upon 1950 high water.

At the time of the collision, the D/B FRANK L was in tow of the M/V HIAWATHA. Captain Burgo and one deckhand manned the tug; the usual navigational equipment1 was aboard the tug. The barge was approximately 106 feet in length with an American Hoist revolving crane mounted near its stern. The boom of the crane was set in a partially elevated position in line with the center line of the barge. The crown of the boom plumbed even with the bow of the barge. The barge itself was unmanned. This practice was customary for Ryan Walsh in towing barges from one place to another.

At about 1:30 p.m. on April 2, 1980, the Ryan Walsh barge superintendent telephoned Joe Domino, Inc., ("Domino") a tug broker, and requested that Domino assign a tug to move the two derrick barges to the Celeste Street Wharf. Domino's dispatcher agreed to make the necessary arrangements for a tug but subsequently called back and said it would be necessary, owing to high river conditions,2 to move the two barges individually using two tugs. The barge superintendent agreed. At no time, however, did the dispatcher and the barge superintendent discuss the height of the boom on either barge. There is conflict in the testimony over whether the Ryan Walsh superintendent told Domino's dispatcher that "the barge was ready to go."3 At trial, the Court asked the dispatcher if that expression had any meaning to him, insofar as navigation was concerned. The dispatcher explained that the expression merely meant "Come get the barge now." On the basis of this testimony the Court finds that the dispatcher did not interpret the expression to mean the crane was in a position to clear the bridge safely.4

When the HIAWATHA arrived to pick up the barge, it was unable to make up to the barge because of the placement of various winch wires that helped to secure the barge at its mooring. Captain Burgo communicated this difficulty to the Domino dispatcher, who suggested that Burgo obtain assistance from Ryan Walsh personnel on another crane barge in the area. Captain Burgo then contacted the crew of a nearby Ryan Walsh crane barge. The foreman of that vessel sent over a Ryan Walsh deckhand, who released the winch wires and told Captain Burgo that the FRANK L was "ready to go."

At approximately 7:00 in the evening of April 2, 1980, Captain Burgo turned the FRANK L around in the river and headed south toward the New Orleans harbor. The weather was clear and there was almost no wind. With the barge in front and the boom extending over the wheelhouse, the tug proceeded downriver at approximately 10 knots without a lookout. As he approached the bridge, Captain Burgo failed to shine his spotlight on either the boom or the bridge. Suddenly, Captain Burgo felt a jerk on the vessel. Immediately thereafter, the crane cab and boom slid off the starboard side of the barge into the river.

Experts estimated that the boom of the crane failed to clear the bridge by five to six feet. Burgo admitted he did not know the vertical clearance of the bridge and did not look in his Book of Maps to ascertain it; nor did he know or try to ascertain the river stage to determine clearance. This is especially important since the river was high enough to prompt the tug broker to recommend one tug per barge rather than one tug for both barges, as Ryan Walsh had originally requested.

The Court cannot determine whether the D/B FRANK L had a boom angle indicator on it when the M/V HIAWATHA arrived. This being so, the Court finds that James Marine has failed to satisfy its burden of showing that Ryan Walsh was negligent in failing to furnish the indicator and that such a failure contributed to the collision. See Hart v. Blakemore, 410 F.2d 218 (5th Cir.1969). The Court does find, however, that the derrick barge had no boom rest (cradle) and therefore did not conform to the Safety Code for Floating Cranes and Floating Derricks, American Society of Mechanical Engineers, 1971 (ANSI) Safety Code, § 81.3.4. This code requires also that the operator, before leaving the barge, lower the boom to the cradle. ANSI Safety Code, § 83.2.3. James Marine has not shown, however, that Ryan Walsh was any way bound by law to comply with these regulations. Consequently, the Court cannot find that Ryan Walsh's failure to do so constitutes negligence.

At issue is whether the tug or the tow was responsible for ascertaining that the boom of the crane on D/B FRANK L could safely pass under the Huey P. Long Bridge. James Marine correctly asserts both that Ryan Walsh, as a party to a contract of towage, warranted that the D/B FRANK L was sufficiently seaworthy "to withstand the ordinary perils to be encountered on the voyage." South, Inc. v. Moran Towing and Transportation Co., Inc., 360 F.2d 1002, 1005 (2d Cir.1966), and that in determining whether the barge was sufficiently seaworthy to withstand the ordinary perils to be encountered on its voyage, the Court must consider whether the barge was "reasonably fit for its intended purpose." S.C. Loveland v. East West Towing, Inc., 415 F.Supp. 596, 605 (S.D.Fla.1976), aff'd, 608 F.2d 160 (5th Cir.1979). Additionally, James Marine plausibly argues that, to be reasonably fit for its intended purpose, a floating crane barge must have the ability to function at different sites and the capacity to travel safely from one site to another. Given this, James Marine argues, the FRANK L was not seaworthy and fit for its purpose on April 2, 1980, because its boom height exceeded the vertical clearance of the Huey P. Long Bridge.

James Marine also correctly asserts that a tug is not responsible for accidents which occur as a result of the unseaworthiness of its tow. However, even assuming that the barge was unseaworthy because of the positioning of its boom,5 James Marine's argument fails, for the Court finds that the instant case falls within an exception to that rule, i.e., the tug is responsible if the alleged unseaworthiness is so apparent that it would be negligent for the tug to attempt to proceed. Dameron White Co....

To continue reading

Request your trial
8 cases
  • Associated Dredging v. Continental Marine Towing
    • United States
    • U.S. District Court — Eastern District of Louisiana
    • September 19, 1985
    ...a tug is not responsible for accidents which occur as a result of the unseaworthiness of its tow. See Ryan Walsh Stevedoring Co. v. James Marine Service, 557 F.Supp. 457 (E.D.La.1983), aff'd, 729 F.2d 1457 (5th Cir.1984). The exception to the rule, i.e., the tug is responsible if the allege......
  • COMPLAINT OF JE BRENNEMAN CO.
    • United States
    • U.S. District Court — Eastern District of Pennsylvania
    • January 8, 1992
    ...likely to produce or contribute to a loss, unless appropriate means are adapted to prevent it." Ryan Walsh Stevedoring Co. v. James Marine Service, 557 F.Supp. 457, 461 (E.D.La. 1983), aff'd, 729 F.2d 1457 (5th Cir.1984), cert. denied, 469 U.S. 981, 105 S.Ct. 384, 83 L.Ed.2d 319 (1984), cit......
  • United States v. Agosto, Cr. 3-81-96.
    • United States
    • U.S. District Court — District of Minnesota
    • February 22, 1983
    ... ... Supp. 455         James M. Rosenbaum, U.S. Atty., Douglas Kelley and ... ...
  • Melbourne Bros. Const. Co. v. Gnots-Reserve
    • United States
    • Court of Appeal of Louisiana — District of US
    • December 11, 1984
    ...is in sole control, the tug is presumably at fault in a collision with a stationary object. Ryan Walsh Stevedoring Company, Inc. v. James Marine Service, Inc. et al, 557 F.Supp. 457 (E.D.La.1983); Bunge Corporation v. M/V Furness Bridge, 558 F.2d 790 (5th Cir.1977). As stated in Gilmore and......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT