South Carolina Public Service Authority v. F.E.R.C., 87-1146
| Court | U.S. Court of Appeals — District of Columbia Circuit |
| Writing for the Court | Before D.H. GINSBURG and SENTELLE; D.H. GINSBURG |
| Citation | South Carolina Public Service Authority v. F.E.R.C., 850 F.2d 788, 271 U.S.App.D.C. 95 (D.C. Cir. 1988) |
| Decision Date | 05 July 1988 |
| Docket Number | No. 87-1146,87-1146 |
| Parties | , 57 USLW 2037, 100 P.U.R.4th 559, 19 Envtl. L. Rep. 20,050 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY, Petitioner, v. FEDERAL ENERGY REGULATORY COMMISSION, Respondent. |
Carmen D. Legato, with whom Vern R. Walker, Gary L. Kaplan and Helen E. Disenhaus, Washington, D.C., were on the brief, for petitioner.
Joshua Z. Rokach, Atty., F.E.R.C., with whom Catherine C. Cook, General Counsel and Jerome M. Feit, Sol., F.E.R.C., Washington, D.C., were on the brief, for respondent.
Before D.H. GINSBURG and SENTELLE, Circuit Judges, and MARKEY, * Chief Judge, United States Court of Appeals for the Federal Circuit.
The South Carolina Public Service Authority (SCPSA or the State) owns and operates a hydroelectric project on the Santee and Cooper Rivers near Charleston, South Carolina. The project, which is licensed by the respondent Federal Energy Regulatory Commission under the Federal Power Act, 16 U.S.C. Sec. 791a et seq. (1982 & Supp. IV 1986), includes a 4.38 mile dam constructed of hydraulic fill and known as the Santee North dam. Although this dam met prevailing engineering standards when it was built in 1942, recent scientific study indicates that it could fail during an earthquake, thereby flooding the downstream area. Accordingly, when the project came up for relicensing, FERC imposed a number of conditions on its continued operation. SCPSA here challenges one of those conditions, viz. that the State agree to provide compensation for all foreseeable property damage caused by any seismically induced dam failure. We agree with the State that the licensing authority granted to the Commission under the Act does not include the power to displace existing state tort law with its own rules of liability for damages caused by licensees. Accordingly, we grant the petition for review and remand the case to the Commission for further proceedings.
FERC relicensed the Santee-Cooper project in 1979, noting in the accompanying order that the stability of the project in the event of an earthquake was in doubt and therefore reserving the right to order any remedial measures or corrective procedures that might later be deemed necessary in order to ensure the safety of the facility. See 7 FERC p 61,148 at 61,234, 61,243 (May 9, 1979). Thereafter, SCPSA, the Commission, and a number of consultants began a joint investigation into the risks posed by the dam and the measures that could be taken to minimize them. They reached the following undisputed conclusions: because of its hydraulic fill construction, the Santee North dam would fail during an earthquake measuring 6.1 on the Richter scale. The Charleston area experiences an earthquake of this severity approximately once every 100 years. The potential for failure is inherent in the design of the dam, so that repairing it is not feasible. In order to eliminate the risk of failure during an earthquake, SCPSA would have to build a replacement dam, which would cost more than $500 million. See 36 FERC p 61,061 at 61,130-32 (July 18, 1986).
A breach of the existing dam would result in flooding of the downstream area. Because the Santee River Valley below the dam is broad, flat, and densely vegetated, however, the inundation would advance at only two miles per hour, or about one half the average person's walking speed. Id. at 61,131. The area below the dam is sparsely populated. Between the dam and the community of Alvin (referred to by the parties as Area 1), there are 47 dwellings. The flood waters would reach only two of them in the first two hours after the breach. The rest would be affected within about 24 hours of the breach. From Alvin to the Atlantic Ocean (Area 2), there are 695 dwellings. The minimum warning time for the first-affected residents of Area 2 would be more than five times longer than the shortest warning time for those first affected in Area 1. The flood would cause an estimated $12.1 million of property damage.
Relying primarily upon these findings, SCPSA proposed to FERC that the agency adopt a Comprehensive Emergency Action Plan (EAP) designed to protect the safety of the Santee Valley residents in the event of an earthquake-induced flood. Under the plan, SCPSA would install tone alert radio receivers in dwellings in the flood plain notify all potentially affected occupants how to proceed in the event of an earthquake, and coordinate evacuation procedures with local disaster preparedness agencies. FERC held a public hearing on SCPSA's proposal, and received a single written comment, this from the owner of 8100 acres of timber land in the flood plain, inquiring about the State's liability for property damage in the earthquake-breach-flood scenario.
FERC approved SCPSA's EAP with several modifications. See id. at 61,140. First the Commission noted that it had four options: it could (1) do nothing; (2) require SCPSA to remove the dam; (3) require that the dam be replaced; or (4) adopt the "non-structural" approach represented by SCPSA's proposed EAP. The Commission dismissed the option of doing nothing as inconsistent with its responsibility under the Act to protect life, health, and property. It rejected the removal option because "the economy of the project area is, to a considerable degree, dependent upon the continued existence of the project." As for requiring SCPSA to build a new dam, the Commission noted that while repair or replacement is the presumed remedy for an unsafe structure, a less radical remedy was sufficient in the "unique circumstances" of this case. In particular, the slow velocity of the flood waters, the low population density of the flood plain, and SCPSA's ability to minimize any possibility of personal injury and loss of life by means of the proposed EAP warranted comparison of the cost of replacement against the adverse impacts of failure. Since the cost of replacement was approximately nine times the value of all expected losses from the flood, the Commission concluded that a comprehensive EAP would best serve the public interest.
The Commission determined that SCPSA's plan, with several modifications, adequately protected human life and health from reasonably foreseeable seismic risks. The plan would not necessarily protect downstream owners from flood damage to their property, however. The Commission therefore concluded:
In approving this non-structural alternative to reconstructing the North Dam, we believe it fair and equitable that SCPSA be required to compensate all those whose property is damaged as a result of a dam failure that could have been avoided by reconstruction to meet the design earthquake.... It is central to the acceptability of this non-structural approach that SCPSA, which is being spared the cost of dam reconstruction, will bear the cost of any foreseeable seismically-induced dam failure.
Id. at 61,134. The Commission implemented this view in Paragraph (F) of its order as follows: "In the event of a failure of the North Dam due to a seismic event equal to or less than the design earthquake (7.5 on the Richter scale) ... SCPSA shall provide for compensation for all foreseeable property damage proximately caused by the dam failure." Acting Chairman Sousa dissented on the ground that "a license condition requiring SCPSA to compensate property owners for damages caused by dam failure [is] a usurpation of authority left to the states by Congress, beyond the Commission's authority." Id. at 61,143. 1
SCPSA requested rehearing, challenging the legal basis for the compensation requirement (along with other modifications to its EAP that are not at issue here). The Commission replied in its order denying rehearing:
... The Commission's approval of SCPSA's application for this amendment of its license, as well as its imposition of certain conditions to that approval, including the imposition of the liability at issue, was grounded in its broad authority and responsibility under Section 10(a)(1) of the FPA to ensure that the licensed project, and its operation, is best adapted to a comprehensive plan for the use of a waterway for beneficial public uses.
The non-structural approach adopted while adequately ensuring protection of the public life and health, did not remove the risk to property from a seismically-induced dam failure. Since this risk to property would not be present had we ordered reconstruction of the dam to meet the design earthquake, we concluded that it was fair and equitable to require SCPSA to compensate all those whose property is damaged as a result of the dam failure as a condition to the continued operation of the project without reconstruction of the North Dam. Consequently, we included [the compensation requirement] as a condition of our approval of the EAP. However, licenses may be amended only upon mutual agreement between the licensee and the Commission. Consequently, SCPSA may choose between the EAP as conditioned and the replacement of the North Dam.
38 FERC p 61,137, at 61,366-67. SCPSA petitioned for review in this court, which has jurisdiction pursuant to 16 U.S.C. Sec. 825l (b).
The question before us is one of first impression: Did the Commission exceed its authority under the Act when it conditioned the renewal of the Santee-Cooper license upon SCPSA's acceptance of strict liability for all property damage caused by an earthquake-induced flood?
We note first the standard by which we review the Commission's order, which the agency contends is authorized by the licensing provisions of the Federal Power Act. In NLRB v. United Food and Commercial Workers Union, --- U.S. ----, 108 S.Ct. 413, 98 L.Ed.2d 429 (1987), the Supreme Court recently adumbrated the approach we are to take when we review an agency's...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial
-
Environmental Defense Fund v. Reilly
...Workers Union, Local 23, 484 U.S. 112, 124, 108 S.Ct. 413, 421, 98 L.Ed.2d 429, 442 (1987); South Carolina Pub. Serv. Auth. v. FERC, 271 U.S.App.D.C. 95, 98, 850 F.2d 788, 791 (1988).73 15 U.S.C. Sec. 2603 (1988).74 Id. Sec. 2605.75 Id. Sec. 2607.76 Id. Sec. 2604(e).77 Id. Sec. 2605(b)(2).7......
-
DiLaura v. Power Authority of State of N.Y.
...that "Judge Elfvin did not have the benefit, at that time, of Judge Ginsberg's [persuasive] decision in South Carolina Public Serv. Auth. v. FERC [850 F.2d 788 (D.C.Cir.1988) ]," 786 F.Supp. at 250, the court articulated a legitimate ground to support its reconsideration. Because Judge Arca......
-
Skokomish Indian Tribe v. U.S.
...DiLaura v. Power Authority of State of N.Y., 982 F.2d 73 (2d Cir.1992), and the D.C. Circuit's decision in South Carolina Public Service Authority v. FERC, 850 F.2d 788 (D.C.Cir.1988). DiLaura and South Carolina Public Service Authority held that section 803(c) does not create a federal pri......
-
Overseas Educ. Ass'n, Inc. v. Federal Labor Relations Authority, s. 87-1468
...extends to "[t]he words, structure, and history of the" statute). So it has been in our decisions. South Carolina Pub. Serv. Auth. v. FERC, 271 U.S.App.D.C. 95, 98, 850 F.2d 788, 791 (1988) ("[w]e ... turn to the language and to the history of the [statute] respectively, in order to do 'our......