Tuschman v. Pennsylvania Railroad Company, 11755.

Decision Date09 March 1956
Docket NumberNo. 11755.,11755.
PartiesChester TUSCHMAN, Nellie D. Tuschman and Helen J. Tuschman, Individually and as Co-Partners T/A Steel Baling Company, v. The PENNSYLVANIA RAILROAD COMPANY.
CourtU.S. Court of Appeals — Third Circuit

F. Hastings Griffin, Jr., Barnes, Dechert, Price, Myers & Rhoads, Philadelphia, Pa., for appellant.

A. Samuel Buchman, Philadelphia, Pa., for appellee.

Before GOODRICH, McLAUGHLIN and HASTIE, Circuit Judges.

McLAUGHLIN, Circuit Judge.

In this diversity action appellees, owners of a crawler crane, sued appellant, as a common carrier, for damage to the crane allegedly sustained while in appellant's possession. There was a verdict for the plaintiffs in the sum of $2,000. The trial court denied a defense motion for judgment n.o.v. and plaintiffs' motion to add interest to the verdict. The defendant appeals.

It is urged that the plaintiffs failed to prove where the damage occurred and that, even assuming some damage in transit, the evidence was too speculative to warrant submission to a jury.

On February 1, 1951, at Toledo, Ohio, appellant accepted the crane for shipment to plaintiffs-appellees at East St. Louis, Illinois. The bill of lading described it as in apparent good order and contained no exceptions. On its face it has a note "Loaded at Toledo Cartage Co., E. Toledo, Ohio." Frank Tuschman, one of the plaintiffs, testified that when he first saw the crane in November of 1950 it was then in good operating condition and he purchased it on behalf of his firm for $6,000. He saw the crane again in the latter part of January, 1951, two or three days before it was shipped out. He said it was in the same condition at that time as when he had first observed it. He next viewed it at East St. Louis just prior to its being unloaded from a flat car of the terminal carrier. According to him the crane had run over the twelve inch timbers which had blocked it in the car. The crawlers were resting up on top of the timber and the bolts which had held the timber in place were broken. A couple of the treads were broken on the crane "whether there were more than that broken or not I don't know, but I did see two from the top." He stated that the two clutches looked as though they had been broken with a hammer, two of the motor blocks were cracked, the operating lever seemed to have been cut with a torch and the radiator coil was broken. On cross-examination he testified that when he had inspected the crane in November, 1950, he could tell pretty well from the way it operated under a load there was nothing really worn in the crane. Cross-examination developed that necessary repairs to the crane were estimated by the people who built it to cost $5,371.10. Replacing 54 crawler treads alone, exclusive of labor and other necessary collateral parts, would cost $2,045.52. The witness described the broken radiator as looking like it had hit up against something. He said that in November, 1950, because of the winter weather, after his inspection of the crane the water had been drained out of its engine and radiator for shipping purposes. The witness said, "We knew that somewhere along the line it was bumped because of the fact that the crawler treads were up on top of the blocks at the time when the crane arrived."

The seller of the crane to the plaintiffs was with Frank Tuschman when the latter inspected it in November. He testified that the crane appeared in good working condition. He said it was worth from $6,000 to $8,000 and that he sold it to the Tuschmans for $6,000. The third and last witness on behalf of plaintiffs was a service engineer on contractors equipment whose deposition had been taken by the defendant but was read on behalf of the plaintiffs. In the latter part of February he had examined the crane in its damaged condition after shipment. He found 50% of the crawler treads broken, that the clutches and steering hand lever had been cut with a torch which he thought had happened more than six weeks prior to his inspection, the engine block was cracked and the radiator leaking. The witness said the crane had been manufactured in 1927.

Asked "In general what was your conclusion as to the cause for the condition you found the crane in?," the witness replied "Worn out." He thought the only value of the crane was for scrap metal — "junk price." He had made up a list of the repairs he found necessary to put the crane in running condition. The cost of these totaled $5,371.10. In his opinion none of the items needing repair had been damaged while in transit with the railroad nor did the latter have any connection with such damage. His estimate was sent to plaintiffs. The man he had met in the plaintiffs' office on the date of his examination later, according to the witness, asked him if he would testify that the repairs had been made necessary by the fault of the railroad and his answer had been no.

The first witness for the defense was the rigger superintendent for the cartage company which, acting for plaintiffs, had put the crane on the railroad car and blocked it in. He testified that a few pads were cracked or broken off and that all of the tread pads on one side would not turn, they just slid and that side could not be turned. Someone from the yard where the crane was standing took a torch "and went under there and cut it, cut it off with a torch, but that didn't help it, it was still stuck, froze." The witness did not know what the trouble was. On cross-examination he said that the crane was not broken or damaged in hauling it to the flat car and that the inspector for the railroad approved its loading as proper. Because the crane's treads were so loose he thought it had a normal tendency to move up and back four or five inches. He had handled many cranes and commented that it was the worst crane he had ever loaded in his life. He said Mr. Tuschman had called him up and "He wanted me to testify for him in this case."

The railroad loading inspector said that the crane had been loaded better than the railroad loading specifications required. The foreman of the railroad shops at Toledo testified that some of the original blocks and cables holding the crane in position had become loose before the crane in the flat car left for East St. Louis. He said the crane had not been affected by this and that the blocks and cables were tightened in the shops. He examined the crane and did not see anything wrong with it. Car inspectors who checked the crane on its arrival at East St. Louis said that some of the blocking had again come loose during the trip but the load had only shifted eight inches and they found no recent damage to the crane. It was testified there had been no accident to or anything unusual in connection with the flat car on the trip to East St. Louis.

The damage report of the railroad was in evidence. It reads: "Apparent cause of damage — block in front of caterpillar not large enough, caterpillar moved forward slightly and rolled over the block onto a large bolt and was broken. Block is approximately 12 inches high while caterpillar treads are approximately 22 inches high."

Appellant argues there is no presumption as urged by appellees that the crane continued in the same condition on the date of delivery to the carrier as it had been when Tuschman saw it two or three days previously. This was an interstate shipment. The crane was transported under a bill of lading authorized by the federal Bill of Lading Act of 1916, 49 U.S.C.A. § 81 et seq. The railroad was liable under the Interstate Commerce Act, 49 U.S.C.A. § 20(11), for damage caused by it. The question of responsibility under the bill of lading is a federal one to be resolved by application of general principles of common law. Southern R. Co. v. Prescott, 1916, 240 U. S. 632, 640, 36 S.Ct. 469, 60 L.Ed. 836. We find no support for the above stated presumption in Ohio where the contract was executed, Industrial Commission of Ohio v. Carden, 1935, 129 Ohio St. 344, 195 N.E. 551. St. Louis-San Francisco R. Co. v. Glow Electric Co., 1929, 35 Ohio App. 291, ...

To continue reading

Request your trial
16 cases
  • Glass-Tite Industries, Inc. v. Spector Freight Systems, Inc.
    • United States
    • Rhode Island Supreme Court
    • 2 d5 Junho d5 1967
    ...constituted an express limitation on any acknowledgment by the carrier that the goods were received in good order. In Tuschman v. Pennsylvania R.R., 3 Cir., 230 F.2d 787, a statement on a bill of lading that the goods were received in apparent 'good order' was construed to be prima facie ev......
  • Pillsbury Co. v. Illinois Cent. Gulf R. R.
    • United States
    • U.S. Court of Appeals — Eighth Circuit
    • 26 d4 Agosto d4 1982
    ...R. R., 492 F.2d 1329 (3d Cir. 1974); Hoover Motor Express Co. v. United States, 262 F.2d 832 (6th Cir. 1959); Tuschman v. Pennsylvania R. R., 230 F.2d 787, 791 (3d Cir. 1956); The Niel Maersk, 91 F.2d 932 (2d Cir.), cert. denied, 302 U.S. 753, 58 S.Ct. 281, 82 L.Ed. 582 (1937); World Wide M......
  • Kaiser Aluminum & Chemical Corp. v. Illinois Cent. Gulf R. Co.
    • United States
    • U.S. Court of Appeals — Eighth Circuit
    • 5 d3 Março d3 1980
    ...477 (1969); Continental Grain Co. v. American Commercial Barge Line Co., 332 F.2d 26, 27 (7th Cir. 1964); Tuschman v. Pennsylvania R.R., 230 F.2d 787, 791 (3d Cir. 1956). Cf. Ed Miniat, Inc. v. Baltimore & Ohio R.R., 190 U.S.App.D.C. 380, 383, 587 F.2d 1277, 1280 (D.C.Cir. 1978) (recital of......
  • Blue Bird Food Products Co. v. Baltimore & Ohio R. Co.
    • United States
    • U.S. Court of Appeals — Third Circuit
    • 20 d2 Fevereiro d2 1973
    ...that the hams were being shipped pursuant to "Plan 2-¼"; the fourth did not indicate a routing plan.7 In Tuschman v. Pennsylvania Railroad, 230 F.2d 787 (3d Cir. 1956), this court held that a representation in a bill of lading that goods were received "in apparent good order" establishes a ......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT