Utah Dep't of Transp. v. Target Corp.

CourtUtah Court of Appeals
Writing for the CourtHARRIS, Judge
CitationUtah Dep't of Transp. v. Target Corp., 414 P.3d 1080 (Utah App. 2018)
Decision Date08 February 2018
Docket NumberNo. 20160122-CA,20160122-CA
Parties UTAH DEPARTMENT OF TRANSPORTATION, Appellant, v. TARGET CORPORATION and Weingarten/Miller/American Fork LLC, Appellees.

Sean D. Reyes, Barbara E. Ochoa, William H. Christensen, and Stanford E. Purser, Attorneys for Appellant

Kevin E. Anderson and Jason E. Wilkinson, Attorneys for Appellee Target Corporation

Jeffrey W. Appel, Matthew N. Evans, and Robert P. Harrington, Attorneys for Appellee Weingarten/Miller/American Fork LLC

Judge Ryan M. Harris authored this Opinion, in which Judges Kate A. Toomey and Jill M. Pohlman concurred.

Opinion

HARRIS, Judge:

¶1 One extremely small portion of a massive freeway interchange was built on land that the Utah Department of Transportation (UDOT) took from claimants Target Corporation (Target) and Weingarten/Miller/American Fork LLC (Miller) (collectively, Claimants). The vast majority of the interchange was constructed upon UDOT's own land or upon land taken from others. Claimants complain that the interchange prevents or impairs motorists from viewing their shopping center, and they claim the right to recover severance damages from UDOT related to this loss of visibility and related to the loss of a right-out exit1 from the shopping center's parking lot. The trial court allowed that claim to proceed to a jury trial, and a jury awarded Claimants more than $2.3 million in severance damages.

¶2 UDOT now appeals, and asserts that the trial court erred in even allowing Claimants' suit for severance damages to reach the jury. UDOT asserts that Claimants' evidence was insufficient, regarding both causation and damages, to support their claims. For the reasons discussed below, we find UDOT's arguments unpersuasive, and therefore affirm.

BACKGROUND2

¶3 In 2009, UDOT determined that two major highway construction projects (the Projects) needed to be built in fast-growing Utah County. One project involved widening and reconstructing Interstate 15 through essentially the entire length of Utah County, from Santaquin to the Salt Lake County line. This project, in total, was more than twenty-two miles long. The other project involved the construction of a new east-west arterial road from American Fork through Lehi to Saratoga Springs. This project, in total, was seven miles long. The two Projects intersect at a point in American Fork where Main Street crosses I-15. Before the Projects, there was already a freeway interchange at the site, allowing motorists to cross I-15 on Main Street via an overpass, or get on or off I-15 at that same location. The Projects called for the widening of both I-15 and American Fork Main Street, and therefore UDOT found it necessary to completely rebuild the existing freeway interchange (the Interchange).

¶4 In order to facilitate construction of the new Interchange at that location, UDOT condemned various properties, including three relatively small portions3 of the Alpine Valley Shopping Center (the Shopping Center), a mall owned largely by Claimants that is located on the northeast corner of the Interchange. The Shopping Center is a large retail facility with many stores and shops. It has one major "anchor" tenant—Target—as well as other smaller retail stores, and includes a large outdoor parking lot. Claimants' witnesses testified at trial that the Shopping Center is designed to draw customers from a large regional area, and that customers are drawn there due to "ease of access and convenience, and knowing how to get there by visibility or good signage." Target owns the land on which its store is located, and Miller owns most of the Shopping Center's remaining land. Both Target and Miller share a parking lot, and also share a cross-easement across the entirety of the Shopping Center. The shared parking lot abuts Main Street, and prior to completion of the Projects a driver could easily access northbound I-15 by making a right-hand turn out of the south side of the parking lot, driving briefly westbound along Main Street, and then merging onto northbound I-15. The original northbound I-15 on-ramp was "at grade"—on the same level—with Main Street.

¶5 UDOT chose to rebuild the Interchange using an innovative "diverging diamond" design, which is "a very unique cross-over type interchange" that involves cars temporarily driving on the left side of the road. Significantly for present purposes, a diverging diamond design requires a lot of space, and in this case that design required that the bridge over the freeway be built higher than other design options, and also required much larger and higher on-and off-ramps. To take one specific example, the northbound I-15 on-ramp was raised from "at grade" (in the before condition) to a height of some twenty-three feet (in the after condition). The new Interchange's increase in height affected Claimants' property and the surrounding area in several ways.

¶6 First, the heightened overpass and raised northbound I-15 on-ramp required UDOT to gradually raise the elevation of Main Street as it approached the Interchange. Because Main Street itself was being raised, UDOT determined that, "for safety reasons," it could no longer permit right-out access from the south end of the Shopping Center onto the now-heightened Main Street, although UDOT was able to preserve right-in access from westbound Main Street into the parking lot. In connection with closing this right-out exit, UDOT took from Claimants one small rectangular parcel located on the south side of the shared parking lot, along Main Street. UDOT did not build any portion of the Interchange on this parcel. Prior to the taking, the right-out exit was the most heavily used exit in the parking lot, due to its proximity to the northbound I-15 on-ramp. After the taking, the closure of the right-out exit required all traffic exiting the parking lot to use an intersection located along the east side of the Shopping Center, along Kawakami Drive.

¶7 Next, to facilitate construction of the heightened northbound I-15 on-ramp, UDOT built a retaining wall along the northbound on-ramp. In order to support the retaining wall, UDOT found it necessary to construct an earthen slope alongside the retaining wall. UDOT did not, however, have enough space on its own property for the entire dirt support slope, so UDOT took a perpetual "slope easement" across a long, narrow parcel of Claimants' land that runs alongside the northbound I-15 on-ramp. UDOT then placed a large amount of dirt on the slope easement, creating a slope that supported the retaining wall that, in turn, supported the raised on-ramp onto northbound I-15. While the retaining wall itself is not located on the slope easement, the dirt slope supporting the retaining wall is at least partially located on the slope easement.4

¶8 At trial, Target's representative testified that UDOT informed him that "it was not feasible to maintain the right-out [exit] due to the new construction, the design, specifically, of this diverging diamond." However, no other witness at trial testified that the condemnation of Claimants' specific parcels was "essential to the completion of the project as a whole." See Ivers v. Utah Dep't of Transp. , 2007 UT 19, ¶ 21, 154 P.3d 802, overruled in part on other grounds by Utah Dep't of Transp. v. Admiral Beverage Corp. , 2011 UT 62, 275 P.3d 208 (holding that a claimant is entitled to severance damages related to a view-impairing structure "built on property other than that which was condemned" only "if the use of the condemned property is essential to the completion of the project as a whole").

¶9 Claimants also presented evidence that completion of the Interchange affected the visibility—defined as the ability of others to view into the property, see id. ¶ 12 —of the Shopping Center. Prior to the Projects, motorists moving in any direction on I-15 or Main Street could easily see the Shopping Center as they were driving. After the Projects, by contrast, visibility into the Shopping Center decreased, chiefly because of the larger and taller Interchange. Parts of the Interchange, including the taller and wider bridge over the freeway, as well as new or taller retaining walls and raised on- and off-ramps, now impair motorists' view of the Shopping Center. Claimants argued that they were entitled to be compensated not just for the value of the parcels that were taken, but also for "severance damages" representing the full loss of the market value of the Shopping Center caused by the taking, including diminution in value caused by reduced visibility and access.

¶10 In support of this contention, Claimants presented testimony from an expert appraiser (Appraiser). Appraiser valued Claimants' remaining property twice, once in the "before" condition, as though the Interchange had never been built, and once in the "after" condition, taking into account any effect that the Interchange had on the property's value. Appraiser explained that the difference in these values constituted the measure of Claimants' severance damages. Appraiser concluded that Claimants' remaining property was worth approximately 7.5% less in the "after" condition than in the "before" condition, and he calculated Claimants' severance damages, based on that conclusion, as more than $2.3 million. Appraiser testified that there were two main factors that contributed to the property's diminution in value: loss of visibility, largely because of the presence of the larger and taller Interchange, and loss of the right-out exit onto Main Street. However, Appraiser did not attempt to provide any specific values for these individual components of loss—that is, Appraiser did not provide the jury with any specific amounts for damages related to loss of the right-out exit alone, or for damages related to loss of visibility alone, or for damages related to loss of visibility related to any specific component of the Interchange. At the close of Claimants' case, UDOT moved for a partial...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex
6 cases
  • Utah Dep't of Transp. v. Target Corp.
    • United States
    • Utah Supreme Court
    • 28 Febrero 2020
    ...impairment "stem[s] from a ‘structure’ that is built upon the part of the property that was taken." Utah Dep’t of Transp. v. Target Corp. , 2018 UT App 24, ¶ 20, 414 P.3d 1080. The court of appeals deemed the new interchange to be the relevant "structure" for purposes of this analysis. Id. ......
  • Pinney v. Carrera
    • United States
    • Utah Court of Appeals
    • 10 Enero 2019
    ...favorable to the prevailing party, we conclude that the evidence is insufficient to support the verdict." Utah Dep't of Transp. v. Target Corp. , 2018 UT App 24, ¶ 12, 414 P.3d 1080 (cleaned up), cert. granted , 425 P.3d 800 (Utah 2018). As discussed, Plaintiff demonstrated at trial that sh......
  • Arreguin-Leon v. Hadco Constr. LLC
    • United States
    • Utah Court of Appeals
    • 13 Diciembre 2018
    ...follows that the evidence was sufficient to support the denial of Hadco’s motion for directed verdict. See Utah Dep’t of Transp. v. Target Corp. , 2018 UT App 24, ¶ 12, 414 P.3d 1080, cert. granted , 425 P.3d 800 (Utah 2018). Therefore, the trial court correctly denied Hadco’s motion.CONCLU......
  • Utah Dep't of Transp. v. Lej Invs. LLC
    • United States
    • Utah Court of Appeals
    • 8 Noviembre 2018
    ...avoid error. Under these circumstances, we are inclined to conclude that the trial court did not err. Cf. Utah Dep’t of Transp. v. Target Corp. , 2018 UT App 24, ¶ 40, 414 P.3d 1080 (concluding that claimants in a condemnation action were not required to "present their severance damages on ......
  • Get Started for Free