Vermont Yankee Nuclear Power Corporation v. Natural Resources Defense Council, Inc Consumers Power Company v. Aeschliman
Decision Date | 03 April 1978 |
Docket Number | Nos. 76-419,76-528,s. 76-419 |
Citation | 98 S.Ct. 1197,435 U.S. 519,55 L.Ed.2d 460 |
Parties | VERMONT YANKEE NUCLEAR POWER CORPORATION, Petitioner, v. NATURAL RESOURCES DEFENSE COUNCIL, INC., et al. CONSUMERS POWER COMPANY, Petitioner, v. Nelson AESCHLIMAN et al |
Court | U.S. Supreme Court |
In No. 76-419, after extensive hearings before the e Atomic Safety and Licensing Board (Licensing Board) and over respondents' objections, the Atomic Energy Commission (AEC) granted petitioner Vermont Yankee Nuclear Power Corp. a license to operate a nuclear power plant, and this ruling was affirmed by the Atomic Safety and Licensing Appeal Board (Appeal Board). Subsequently, the AEC, specifically referring to the Appeal Board's decision, instituted rulemaking proceedings to deal with the question of considering environmental effects associated with the uranium fuel cycle in the individual cost-benefit analyses for light-water-cooled nuclear power reactors. In these proceedings the Licensing Board was not to use full formal adjudicatory procedures. Eventually, as a result of these rulemaking proceedings, the AEC issued a so-called fuel cycle rule. At the same time the AEC approved the procedures used at the hearing; indicated that the record, including the Environmental Survey, provided an adequate data base for the rule adopted; and ruled that to the extent the rule differed from the Appeal Board's decision such decision had no further precedential significance, but that since the environmental effects of the uranium fuel cycle had been shown to be relatively insignificant, it was unnecessary to apply the rule to Vermont Yankee's environmental reports submitted prior to the rule's effective date or to the environmental statements circulated for comment prior to such date. Respondents appealed from both the AEC's adoption of the fuel cycle rule and its decision to grant Vermont Yankee's license. With respect to the license, the Court of Appeals first ruled that in the absence of effective rulemaking proceedings, the AEC must deal with the environmental impact of fuel reprocessing and disposal in individual licensing proceedings, and went on to hold that despite the fact that it appeared that the AEC employed all the procedures required by the Administrative Procedure Act (APA) in 5 U.S.C. § 553 (1976 ed.) and more the rulemaking proceedings were inadequate and overturned the rule, and accordingly the AEC's determination with respect to the license was also remanded for further proceedings. In No. 76-528, after examination of a report of the Advisory Committee on Reactor Safeguards (ACRS) and extensive hearings, and over respondent intervenors' objections, the AEC granted petitioner Consumers Power Co. a permit to construct two nuclear reactors, and this ruling was affirmed by the Appeal Board. At about this time the Council on Environmental Quality revised its regulations governing the preparation of environmental impact statements so as to mention for the first time the necessity for considering energy conservation as one of the alternatives to a proposed project. In view of this development and a subsequent AEC ruling indicating that all evidence of energy conservation should not necessarily be barred at the threshold of AEC proceedings, one of the intervenors moved to reopen the permit proceedings so that energy conservation could be considered, but the AEC declined to reopen the proceedings. Respondents appealed from the granting of the construction permit. The Court of Appeals held that the environmental impact statement for the construction of the reactors was fatally defective for failure to examine energy conservation as an alternative to plants of this size, and that the ACRS report was inadequate and should have been returned to the ACRS for further elucidation, understandable to a layman, and remanded the case for appropriate consideration of waste disposal and other unaddressed issues. Held :
1. Generally speaking, 5 U.S.C. § 553 (1976 ed.) establishes the maximum procedural requirements that Congress was willing to have the courts impose upon federal agencies in conducting rulemaking proceedings, and while agencies are free to grant additional procedural rights in the exercise of their discretion, reviewing courts are generally not free to impose them if the agencies have not chosen to grant them. And, even apart from the APA, the formulation of procedures should basically be left within the discretion of the agencies to which Congress has confided the responsibility for substantive judgments. Pp. 523-525.
2. The Court of Appeals in these cases has seriously misread or misapplied such statutory and decisional law cautioning reviewing courts against engrafting their own notions of proper procedures upon agencies entrusted with substantive functions by Congress, and moreover as to the Court of Appeals' decision with respect to agency action taken after full adjudicatory hearings, it improperly intruded into the agency's decision-making process. Pp. 535-558.
(a) In No. 76-419, the AEC acted well within its statutory authority when it considered the environmental impact of the fuel processes when licensing nuclear reactors. Pp. 538-539.
(b) Nothing in the APA, the National Environmental Policy Act of 1969 (NEPA), the circumstances of the case in No. 76-419, the nature of the issues being considered, past agency practice, or the statutory mandate under which the AEC operates permitted the Court of Appeals to review and overturn the rulemaking proceeding on the basis of the procedural devices employed (or not employed) by the AEC so long as the AEC used at least the statutory minima, a matter about which there is no doubt. Pp. 539-548.
(c) As to whether the challenged rule in No. 76-419 finds sufficient justification in the administrative proceedings that it should be upheld by the reviewing court the case is remanded so that the Court of Appeals may review the rule as the APA provides. The court should engage in this kind of review and not stray beyond the judicial province to explore the procedural format or to impose upon the agency its own notion of which procedures are "best" or most likely to further some vague, undefined public good. P. 549.
(d) In No. 76-528, the Court of Appeals was wrong in holding that rejection of energy conservation on the basis of the "threshold test" was capricious and arbitrary as being inconsistent with the NEPA's basic mandate to the AEC, since the court's rationale basically misconceives not only the scope of the agency's statutory responsibility, but also the nature of the administrative process, the thrust of the agency's decision, and the type of issues the intervenors were trying to raise. The court seriously mischaracterized the AEC's "threshold test" as placing "heavy substantive burdens on intervenors." On the contrary the AEC's stated procedure as requiring a showing sufficient to require reasonable minds to inquire further is a procedure well within the agency's discretion. Pp. 549-555.
(e) The Court of Appeals' holding in No. 76-528 that the Licensing Board should have returned the ACRS report to the ACRS for further elaboration is erroneous as being an unjustifiable intrusion into the administrative process, and there is nothing in the relevant statutes to justify what the court did. Pp. 556-558.
No. 76-419, 178 U.S.App.D.C. 336, 547 F.2d 633, and No. 76-528, 178 U.S.App.D.C. 325, 547 F.2d 622, reversed and remanded.
Thomas G. Dignan, Jr., Boston, Mass., for petitioner in No. 76-419.
Lawrence G. Wallace, Washington, D. C., for respondent Nuclear Regulatory Commission in support of petitioners.
Myron M. Cherry, Chicago, Ill., for respondents in No. 76-528.
[Amicus Curiae Information from pages 522-523 intentionally omitted] Mr. Justice REHNQUIST delivered the opinion of the Court.
In 1946, Congress enacted the Administrative Procedure Act, which as we have noted elsewhere was not only "a new, basic and comprehensive regulation of procedures in many agencies," Wong Yang Sung v. McGrath, 339 U.S. 33, 70 S.Ct. 445, 94 L.Ed. 616 (1950), but was also a legislative enactment which settled "long-continued and hard-fought contentions, and enacts a formula upon which opposing social and political forces have come to rest." Id., at 40, 70 S.Ct., at 448. Section 4 of the Act, 5 U.S.C. § 553 (1976 ed.), dealing with rulemaking, requires in subsection (b) that "notice of proposed rule making shall be published n the Federal Register . . .," describes the contents of that notice, and goes on to require in subsection (c) that after the notice the agency Interpreting this provision of the Act in United States v. Allegheny-Ludlum Steel Corp., 406 U.S. 742, 92 S.Ct. 1941, 32 L.Ed.2d 453 (1972), and United States v. Florida East Coast R. Co., 410 U.S. 224, 93 S.Ct. 810, 35 L.Ed.2d 223 (1973), we held that generally speaking this section of the Act established the maximum procedural requirements which Congress was willing to have the courts impose upon agencies in conducting rulemaking procedures.1 Agencies are free to grant additional procedural rights in the exercise of their discretion, but reviewing courts are generally not free to impose them if the agencies have not chosen to grant them. This is not to say necessarily that there are no circumstances which would ever justify a court in overturning agency action because of a failure to employ procedures beyond those required by the statute. But...
To continue reading
Request your trial-
Pasco Terminals, Inc. v. United States
...capable of permitting them to discharge their multitudinous duties'." Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 543, 98 S.Ct. 1197, 1211, 55 L.Ed.2d 460 (1978). Plaintiff, however, cites a number of cases which it claims supports its conten......
-
Forestwatch v. Lint, Civil Action No.: 8:12–CV–3455–BHH
...Glickman, 81 F.3d at 443 (citing Robertson, 490 U.S. at 350, 109 S.Ct. 1835 ; Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 558, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978) ) (emphasis added). The plaintiff's challenges to the Forest Service's NEPA an......
-
Preservation of Los Olivos v. Dept. of Interior, Case No. CV 06-1502 AHM (CTx).
...reviewed and to reach its own conclusions based on such an inquiry."); Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 543-49, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978) (holding that courts may not impose any procedures on an agency when a statute doe......
-
Timken Co. v. United States
...the agency has adduced no reasoned answers), rev'd on other grounds sub nom. Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978). By failing to collect home market sales data on TRB models other than those charact......
-
Court Orders Dakota Access Pipeline Shut Down
...transportation by pipeline. [1] Balt. Gas & Elec. Co. v. NRDC, 462 U.S. 87, 97 (1983) (quoting Vt. Yankee Nuclear Power Corp v. NRDC, 435 U.S. 519, 553 (1978)). [2] Grand Canyon Trust v. FAA, 290 F.3d 339, 340 (D.C. Cir. 2002) (quoting Sierra Club v. Peterson, 717 F.2d 1409, 1415 (D.C. ......
-
REASONABLE TAX RULES: ADVANCING PROCESS VALUES WITH REMEDIAL RESTRAINT.
...U.S. 644, 659-60 (2007)). (173.) Id. at 2384. (174.) Id. at 2385. (175.) Vt. Yankee Nuclear Power Corp. v. Nat'l Res. Def. Council, Inc., 435 U.S. 519 (176.) Little Sisters of the Poor, 140 S. Ct. at 2385-86. (177.) Id. at 2385 (quoting Pension Benefit Guar. Corp. v. LTV Corp., 496 U.S. 633......
-
2011 Ninth Circuit environmental review.
...such claims are procedural in nature, rather than substantive. See, e.g., Vt. Yankee Nuclear Power Corp. v. Natural Res. Def. Council, 435 U.S. 519, 558 (461) Adaptive monitoring is defined as a system under which Forest Service continuously assesses the effects of management practices on s......
-
Addressing barriers to watershed protection.
...Kleppe v. Sierra Club, 427 U.S. 390, 410 (1976). (477) Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 553 (1978). (478) See Rodgers, supra note 393, at 801; William L. Andreen, In Pursuit of NEPA's Promise. The Role of Executive Oversight in the......
-
§1.5 - NEPA Process
...consideration. Dept of Transp. v. Pub. Citizen, 541 U.S. at 764, citing Vt. Yankee Nuclear Power Corp. v. Natural Res. Def. Council, Inc., 435 U.S. 519, 98 S. Ct. 1197, 55 L. Ed. 2d 460 (1978) (participants in the NEPA process have an obligation to participate meaningfully, alert the agency......