Atchafalaya Basinkeeper v. U.S. Army Corps of Eng'rs

Decision Date06 July 2018
Docket NumberNo. 18-30257,18-30257
Citation894 F.3d 692
Parties ATCHAFALAYA BASINKEEPER ; Louisiana Crawfish Producers Association–West; Gulf Restoration Network; Waterkeeper Alliance ; Sierra Club, and its Delta Chapter, Plaintiffs–Appellees v. UNITED STATES ARMY CORPS OF ENGINEERS, Defendant–Appellant Bayou Bridge Pipeline, L.L.C.; Stupp Brothers, Incorporated, doing business as Stupp Corporation, Intervenor Defendants–Appellants
CourtU.S. Court of Appeals — Fifth Circuit

Jan Erik Hasselman, Jaimini Parekh, Earthjustice, Seattle, WA, Alisa Ann Coe, Esq., Earthjustice, Tallahassee, FL, for PlaintiffsAppellees.

James Maysonett, Trial Attorney, Environment & Natural Resources Division-Appellate Section RFK-2633, Washington, DC, Tyler McVeigh Alexander, Judith E. Coleman, Eileen Therese McDonough, Trial Attorney, U.S. Department of Justice, Environment & Natural Resources Division, Washington, DC, Susan Connella Amundson, Esq., Mary Patricia Jones, Assistant U.S. Attorneys, U.S. Attorney's Office, Middle District of Louisiana, Baton Rouge, LA, for DefendantAppellant UNITED STATES ARMY CORPS OF ENGINEERS.

Miguel Angel Estrada, David Debold, Esq., William S. Scherman, Esq., Gibson, Dunn & Crutcher, L.L.P., Washington, DC, James Conner Percy, Esq., Jones Walker, L.L.P., Baton Rouge, LA, for Intervenor DefendantAppellant BAYOU BRIDGE PIPELINE, L.L.C.

Richard B. Walsh, Jr., Edward Pivin, Lewis Rice, L.L.C., Saint Louis, MO, William C. Kaufman, III, Seale, Smith, Zuber & Barnette, L.L.P., Baton Rouge, LA, for Intervenor DefendantAppellant STUPP BROTHERS, INCORPORATED.

Before REAVLEY, JONES, and GRAVES, Circuit Judges.

EDITH H. JONES, Circuit Judge:

The United States Army Corps of Engineers (the "Corps") and Bayou Bridge Pipeline, LLC ("Bayou Bridge," a convenience that includes co-appellant Stupp Brothers, Inc.), appeal the district court's grant of a preliminary injunction preventing Bayou Bridge from constructing a pipeline in part through the Atchafalaya Basin of southern Louisiana. The injunction was based on the Corps' alleged failure to satisfy the demands of the National Environmental Policy Act in issuing a construction permit. Because the court misperceived the applicable regulations, and the Corps' analysis, properly understood, vindicates its decision that an Environmental Assessment sufficed under these circumstances, we vacate the preliminary injunction and remand to the district court.

BACKGROUND

On December 14, 2017, after a year-long review, the Corps issued Bayou Bridge a permit under Section 404 of the Clean Water Act ("CWA"), 33 U.S.C. § 1344, and Sections 10 and 14 of the Rivers and Harbors Act of 1899, 33 U.S.C. §§ 403, 408, allowing it to build a 162–mile crude oil pipeline from Lake Charles, Louisiana to terminals near St. James. Portions of the pipeline will cross the Atchafalaya Basin, affecting wetlands. The discharge of dredge or fill material into these wetlands necessitated the Corps' permitting action under the Clean Water Act, 33 U.S.C. § 1311(a), while the Rivers and Harbors Act requires permitting for structures in or affecting "navigable waters" as defined by regulations.

In discharging its permit responsibilities, the Corps was required to implement the National Environmental Policy Act ("NEPA"), a procedural statute, which requires certain steps before federal agencies may approve projects that will affect the environment. To comply, the agency first prepares an environmental assessment ("EA"). Sabine River Auth. v. U.S. Dep't of Interior , 951 F.2d 669, 677 (5th Cir. 1992). As this court has held, "[a]n EA should be a 'concise public document ... that serves to ... [b]riefly provide sufficient evidence and analysis for determining whether to prepare an [environmental impact statement].' " O'Reilly v. U.S. Army Corps of Eng'rs , 477 F.3d 225, 228 (5th Cir. 2007) (quoting 40 C.F.R. § 1508.9(a) ). If the agency finds during this process that the proposed action will result in "significant" effects to the environment, then it must also prepare an environmental impact statement ("EIS"). Id. ; 42 U.S.C. § 4332(C). If the agency finds that the project will not have a significant impact, it will conclude with a "Finding of No Significant Impact" ("FONSI") and no EIS will be required. Sabine River Auth. , 951 F.2d at 677.

In this instance, the Corps authored two EAs, one under the Rivers and Harbors Act (the "408 EA"), and the other under Section 404 of the CWA (the "404 EA"). Based on those assessments, which together run over two hundred pages, plus appendices of nearly 200 pages more, the Corps determined that an EIS would not be necessary for this project and issued a FONSI.

Atchafalaya Basinkeeper and other organizations interested in the Atchafalaya basin brought suit in January 2018 against the Corps and sought a preliminary injunction to redress alleged violations of NEPA and the CWA. Bayou Bridge and Stupp Brothers intervened as defendants. The district court held an expedited hearing even before the complete administrative record could be filed. The court's decision, filed soon afterward, rejected a number of Appellees' contentions but found that Appellees had shown irreparable harm and had demonstrated a likelihood of success on the merits as well as other prerequisites of preliminary relief for two of their claims: (1) the EAs violated NEPA and the CWA by failing to adequately analyze mitigation for the loss of cypress-tupelo swamp along the pipeline right of way through the Basin, and (2) the EAs violated NEPA and the CWA by failing to adequately consider historical noncompliance by other pipelines and the cumulative effects of this project. The resulting preliminary injunction stopped construction only "within the Atchafalaya Basin."

Appellants sought a stay of the injunction pending appeal, which this court granted in a split decision.

Appellants raise a number of issues for review: that the district court applied an incorrect standard for determining injunctive relief; abused its discretion in finding Appellees likely to succeed on the merits and affirming the other bases for injunctive relief; and issued an improper and overbroad injunction. We need only rule on the court's errors in assessing the likelihood that Appellees will succeed on the merits.1

STANDARD OF REVIEW

A grant of a preliminary injunction is reviewed for abuse of discretion. La Union Del Pueblo Entero v. FEMA , 608 F.3d 217, 220 (5th Cir. 2010). Factual determinations within the preliminary injunction analysis are reviewed for clear error, and legal conclusions within the analysis are reviewed de novo. Id. A preliminary injunction is an extraordinary remedy. In addition to proving a likelihood of prevailing on the merits, the movant must demonstrate a substantial threat of irreparable injury if the injunction is not granted; the threatened injury outweighs any harm that will result to the non-movant if the injunction is granted; and the injunction will not disserve the public interest." Id. at 219. The district court abuses its discretion if it relies on clearly erroneous factual findings in deciding whether to grant a preliminary injunction or relies on "erroneous conclusions of law." O'Reilly , 477 F.3d at 238 (internal citations and quotations omitted).

The Corps' actions under the NEPA and CWA are subject to review under the Administrative Procedure Act ("APA"). As relevant here, a court will uphold an agency action unless it finds it to be "arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." 5 U.S.C. § 706(2)(A) ; Coastal Conservation Assoc. v. U.S. Dep't of Commerce , 846 F.3d 99, 110-11 (5th Cir. 2017). This is a demanding standard. The Supreme Court carefully explained factors that inform judicial review under this provision. Motor Vehicle Mfrs. Ass'n v. State Farm Mut. Auto. Ins. Co. , 463 U.S. 29, 43, 103 S.Ct. 2856, 2866–67, 77 L.Ed.2d 443 (1983), and its words are worth repeating here:

The scope of review under the "arbitrary and capricious" standard is narrow and a court is not to substitute its judgment for that of the agency. Nevertheless, the agency must examine the relevant data and articulate a satisfactory explanation for its action including a "rational connection between the facts found and the choice made." In reviewing that explanation, we must "consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment." Normally, an agency rule would be arbitrary and capricious if the agency has relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise.

(citations omitted).

DISCUSSION
A. The district court decision.

The district court analyzed at length each of the Appellees' specific challenges to the procedural and substantive sufficiency of the EAs. The court rejected the complaint that the Corps' analysis of the environmental impact on the Basin of possible oil spills was insufficient and therefore arbitrary and capricious. The court also rejected the assertion that the Corps provided defective public notice of the "type and location of the proposed mitigation" measures; as the court noted, the public comments, many of which were made by the Appellees here, were addressed and responded to by the Corps in 26 pages of the Section 404 EA.

The court then focused on specific impacts of this project in the Basin, i.e., that 455.5 acres of "jurisdictional wetlands" will be temporarily affected and approximately 142 acres of those wetlands "[will] be permanently converted from forested to herbaceous wetlands within the permanent right-of-way." The Section 404 EA states that "[t]he proposed project will change and/or reduce wetland functional quality along...

To continue reading

Request your trial
32 cases
  • Southwestern Elec. Power Co. v. U.S. E.P.A.
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • April 12, 2019
    ...Co. , 463 U.S. 29, 43, 103 S.Ct. 2856, 77 L.Ed.2d 443 (1983) (" State Farm "); see generally, e.g., Atchafalaya Basinkeeper v. U.S. Army Corps of Eng'rs , 894 F.3d 692, 697 (5th Cir. 2018) (reciting State Farm standard). "[W]e must also ensure that the agency ‘examine[d] the relevant data a......
  • Food & Water Watch v. U.S. Dep't of Agric.
    • United States
    • U.S. District Court — District of Columbia
    • March 26, 2020
    ...measures designed to mitigate a project's impacts carries legal consequences. See, e.g., Atchafalaya Basinkeeper v. U.S. Army Corps of Eng'rs , 894 F.3d 692, 698–99 (5th Cir. 2018) ("The [district] court's misplaced view that the Corps issued a ‘mitigated FONSI’ is an error of law that stee......
  • Optimus Steel, LLC v. U.S. Army Corps of Eng'rs
    • United States
    • U.S. District Court — Eastern District of Texas
    • October 4, 2020
    ...to be "arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." Atchafalaya Basinkeeper v. U.S. Army Corps of Eng'rs , 894 F.3d 692, 696–97 (5th Cir. 2018) (quoting 5 U.S.C. § 706(2)(A) ). This standard evaluates "whether the decision was based on a considera......
  • Planned Parenthood of Greater Tex. Family Planning & Preventative Health Servs., Inc. v. Kauffman
    • United States
    • U.S. Court of Appeals — Fifth Circuit
    • November 23, 2020
    ...).21 Id. (emphasis omitted) (citing Janvey v. Alguire , 647 F.3d 585, 595 (5th Cir. 2011) ).22 See Atchafalaya Basinkeeper v. U.S. Army Corps of Eng'rs , 894 F.3d 692, 696 (5th Cir. 2018).23 42 U.S.C. § 1983.24 536 U.S. 273, 122 S.Ct. 2268, 153 L.Ed.2d 309 (2002).25 Id. at 283, 122 S.Ct. 22......
  • Request a trial to view additional results
1 books & journal articles

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT