Ballard v. SVF Found. SVF Found., 2015–351–Appeal. (NC 13–499)

Decision Date10 April 2018
Docket NumberNo. 2015–352–Appeal. (NC 08–655),No. 2015–351–Appeal. (NC 13–499),No. 2015–353–Appeal. (NC 00–340),2015–351–Appeal. (NC 13–499),2015–352–Appeal. (NC 08–655),2015–353–Appeal. (NC 00–340)
Citation181 A.3d 27
Parties Carol C. BALLARD et al. v. SVF FOUNDATION. SVF Foundation v. Carol C. Ballard et al. Dorrance H. Hamilton et al. v. Carol C. Ballard et al.
CourtRhode Island Supreme Court

R. Daniel Prentiss, Esq., for Plaintiffs.

Stephen J. MacGillivray, Esq., Michael Daly, Esq., for Defendants.

Present: Suttell, C.J., Goldberg, Flaherty, Robinson, and Indeglia, JJ.

OPINION

Justice Goldberg, for the Court.

Before this Court is yet another chapter in the long-running spat between Newport's renowned feuding neighbors, Carol C. Ballard and A.L. Ballard (the Ballards) against SVF Foundation (the Foundation) and its predecessor owner, the Dorrance H. Hamilton Trust (the Trust), regarding the former "Edgehill property" located in Newport, Rhode Island. The parties have engaged in an embittered and unseemly battle that has endured for more than seventeen years. In the multiple cases that have been filed in the Superior Court—presided over by a series of intrepid trial justices—not a single count, claim, or counterclaim has proceeded to trial.1 Rather, a plethora of summary judgments and Rule 54(b) judgments abound. The Ballards currently appeal from summary judgments and an order of dismissal entered by the Superior Court, on the eve of trial, in these consolidated cases. The parties appeared before the Supreme Court for oral argument on November 7, 2017. After carefully reviewing the record and considering the parties' written and oral submissions, we affirm the judgment in all respects.

Facts and Travel

In early 2001, in the context of pending litigation, the Superior Court ordered a partition of the Edgehill property and appointed a partition commissioner (the commissioner) to assess the equities and recommend a fair division of the property between the Ballards and the Foundation's previous owner, the Trust.2 On February 8, 2002, the commissioner issued his report, including his findings and recommendations; on September 27, 2002, the commissioner issued a supplemental report and recommendation. The Superior Court adopted the commissioner's findings and recommendations, and a judgment of partition entered on December 16, 2002. The Ballards and the Foundation were awarded equal portions of the property—specifically, the Foundation was awarded approximately 17.172 acres, comprising a masonry complex known as the "Swiss Village," and the Ballards were awarded 11.478 acres, which included two structures known as the "Manor House" and the "Carriage House." Carol Ballard also owned a separate parcel identified as "Lot 20," an undeveloped lot that abuts the Edgehill property on the westerly side.3 Lot 20 is featured in the current phase of this battle. The partition order was not challenged by either side, and it ripened into a final judgment. However, the parties' incessant squabbles over access easements and sewer debate have persisted for many years. This Court has been confronted with a petition for relief from the partition judgment arising from an access easement, the unending sewer debate, as well as numerous amendments to the original complaint, additional claims, counterclaims, and new complaints.4

The Sewer System and Lot 20 (NC–2000–0340)

Among the post-partition disputes from which these appeals arise was the Edgehill property sewer system (the sewer system). Questions about joint responsibility for the sewer system and whether the sewer system could be utilized to service adjacent lots were raised during the partition proceeding. The Ballards sought, and were denied, an easement to connect Lot 20 to the sewer system; their request had been opposed by the Foundation. This was not the Ballards' first attempt to do so, nor was it their last. Indeed, it is fair to say that much of this litigation has centered on the Ballards' persistent efforts to expand the sewer system for their personal benefit. On September 27, 2002, the commissioner issued his supplemental report and recommendation to address the post-partition sewer system issues. The commissioner expressly determined that it was not necessary to address whether the Ballards may access the sewer system to service abutting properties such as Lot 20, as that issue did not relate to the partitioned estate.

On December 6, 2002, the Superior Court issued an order of partition that adopted the original and supplemental findings and recommendations of the commissioner. As explained in the order, the sewer pump facility and its sewer lines serviced the Swiss Village, the Manor House, and the Carriage House. The trial justice awarded the Ballards and the Foundation—in joint ownership—all the benefits and rights to the sewer pump station, the forced main sewer line, and the main sewer feed line on the Edgehill property, and directed that any repair and maintenance responsibilities be allocated on a pro rata basis. The order also awarded individual ownership of any lateral sewer lines located on the parties' respective properties. The Superior Court declared that "[t]o the extent that other necessary but unspecified utility or drainage lines, conditions or facilities exist which predate the partition, such shall be deemed pre-existing easements by necessity or implication which inure to the benefit of the dominant tenant." The Ballards are before the Court arguing that the sewer system qualifies as an "unspecified utility or drainage line." Although no appeal was taken by either party from the partition judgment, the Ballards' efforts to connect the sewer system to Lot 20 have persisted.

In a 2005 fifth amended complaint in the original action, the Foundation sought injunctive relief to prevent the Ballards from connecting Lot 20 to the Edgehill property's sewer station.5 The Ballards then filed an answer and counterclaim, which included claims for trespass, declaratory judgment, and an accounting.6 A decade later, in 2015, with the trial date looming, the Ballards moved to amend their counterclaim to add a new count, seeking a declaration that an implied easement to access the sewer system arose when they bought Lot 20. The motion to amend was denied. No appeal was taken.

The Driveway Easement (NC–2013–0499)

An easement that is described in the commissioner's report and recommendation as "a driveway easement for access to the Carriage House" (the driveway easement) is also before us on appeal.7 The driveway easement provided the Ballards with access to a driveway over the Foundation's property to the Carriage House. Due to zoning setback requirements, this easement was a necessary part of the partition judgment. Two stone pillars stood at the entrance to the driveway: one on the Foundation's property and the other on the Ballards' property, with an iron gate between them. The stone pillars and the iron gate were in poor condition and in need of repair. Given the parties' toxic relationship, it was only a matter of time before this circumstance led to acrimony and litigation.

The Ballards, concerned about the appearance and the condition of the pillars and the gate, sought to initiate the restoration of these structures. A.L. Ballard approached the Trust, the owner at the time, with an offer to relocate the pillars and to move the driveway. Before this Court, the Ballards allege that, after replacing the pillars and gate and relocating the driveway, thus eliminating the need for access to the Foundation's property, they nonetheless intended to continue to use "their easement." They planned to install a garden with landscaping and a grass or gravel path for foot or vehicular traffic over "their easement"; and not for its original purpose as "an access easement over existing driveway to [the] Carriage House." Indeed, at a July 9, 2015, pretrial conference, the Ballards' counsel argued to the trial justice that "the whole purpose of moving the driveway is so we can landscape on our easement[.]" Counsel also argued that the Ballards moved the driveway but that "[w]e didn't move the easement."

According to the Foundation, it agreed to the offer to relocate the driveway and move the pillars onto the Ballards' property; however, in return, the Foundation declared its intent to erect a fence on its property, where the stone pillar once stood. The Foundation also contends that, by relocating the driveway, the Ballards abandoned the driveway easement. Despite knowing the Foundation's intention once the driveway was relocated, the Ballards claim that they "proceeded with the project of relocating and rebuilding the stone pillars and relocating the carriage house driveway." Thereafter, the Foundation began installing the fence, and another donnybrook erupted.

The Ballards filed a new complaint in Superior Court on December 16, 2013, seeking to enjoin the Foundation from erecting the fence and obstructing their use and enjoyment of "their easement."8 The Ballards argued that, notwithstanding their request to move the pillars and relocate the driveway, and the Foundation's conditional acceptance, they had no intention of abandoning the driveway easement. The Foundation responded that the proposal to relocate the driveway was accepted based on the understanding that the Foundation would install a fence at the entry of the driveway. The Foundation also filed a counterclaim alleging several counts, including a request for a declaration that the Ballards had abandoned the driveway easement.

These consolidated actions were set for trial on July 29, 2015.

Pretrial Dispositions

On May 4 and June 1, 2015, the parties came before the trial justice on the Foundation's motion for partial summary judgment on Count I of the Foundation's fifth amended complaint, seeking to enjoin the Ballards from accessing the jointly owned Edgehill property sewer system to service a subdivision of Lot 20. The trial justice noted at the later hearing date that

"[t]his Court gave the parties a month to try to resolve the matter
...

To continue reading

Request your trial
19 cases
  • McElroy v. Stephens
    • United States
    • Rhode Island Superior Court
    • 21 Diciembre 2022
    ...A.3d 27, 37 (R.I. 2018). "Generally, this occurs when another lawful way onto the property has been acquired, thus eliminating the necessity." Id. an easement by necessity arises only in cases where a parcel is "landlocked" within the meaning of the legal doctrine discussed above, this Cour......
  • Atmed Treatment Ctr. v. The Travelers Indem. Co.
    • United States
    • Rhode Island Supreme Court
    • 9 Diciembre 2022
    ... ... will affirm the judgment." Ballard v. SVF ... Foundation , 181 A.3d 27, 34 (R.I. 2018) ... trial justice found that Travelers had not breached the ... insurance ... ...
  • Atmed Treatment Ctr., Inc. v. Travelers Indem. Co.
    • United States
    • Rhode Island Supreme Court
    • 9 Diciembre 2022
    ...of material fact and that the moving party is entitled to judgment as a matter of law, we will affirm the judgment." Ballard v. SVF Foundation , 181 A.3d 27, 34 (R.I. 2018) (brackets omitted) (quoting Sullo , 68 A.3d at 406-07 ). "Summary judgment is appropriate only when the pleadings, dep......
  • Laprocina v. Lourie
    • United States
    • Rhode Island Supreme Court
    • 26 Mayo 2021
    ...from that judgment.Standard of Review This Court reviews a trial justice's grant of summary judgment de novo. Ballard v. SVF Foundation , 181 A.3d 27, 34 (R.I. 2018). "Although summary judgment is recognized as an extreme remedy, to avoid summary judgment the burden is on the nonmoving part......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT