Berke v. Lehigh Marine Disposal Corp.

Decision Date24 December 1970
Docket NumberDocket 33819.,No. 170,170
Citation435 F.2d 1073
PartiesAdolph BERKE, Plaintiff-Appellant, v. LEHIGH MARINE DISPOSAL CORP., Defendant-Appellee.
CourtU.S. Court of Appeals — Second Circuit

Paul C. Matthews, John F. X. McKiernan, New York City, for plaintiff-appellant.

William F. Larkin, Schaffner & D'Onofrio, New York City, for defendant-appellee.

Before LUMBARD, Chief Judge, and WATERMAN and ANDERSON, Circuit Judges.

WATERMAN, Circuit Judge:

Plaintiff-appellant Berke commenced this action against his employer to recover damages resulting from personal injuries which he suffered when he fell overboard from the scow S-3 in Greater New York Harbor on March 7, 1965. His first cause of action was premised on the alleged unseaworthiness of the scow and, under the Jones Act, on the alleged negligence of the employer. His second cause of action was for maintenance and cure. Seeking indemnity, the employer impleaded the owner of the tug which was towing the S-3 at the time of the accident. At the end of plaintiff's case the trial judge granted defendant's motion to dismiss the complaint on the ground that there was insufficient evidence to take the case to the jury on either of the two counts. The propriety of that decision is the subject of this appeal.1 We affirm the dismissal order.

The following sketch of the facts is undisputed. At about midnight on March 6, 1965, the scow S-3, owned and operated by the defendant-appellee, was berthed under the Brooklyn Bridge where it had been loaded with debris and was being prepared to be towed to sea by a tug operated by the third-party defendant. The scow was approximately 200 feet in length and 40 feet in width and contained four pockets in which the debris was heaped in cone-shaped piles. Around the pockets and along the perimeter of the scow ran a walkway approximately three feet in width. Plaintiff Berke was the scow's captain and was the sole crew member of the S-3.

When the tug arrived to take the S-3 out to sea, Berke and one Mullin, a deck-hand on the tug and an old friend of Berke, made the necessary tie-up. After preliminary maneuvering in the harbor, the tug towed the S-3, secured by a line 400 to 500 feet long, to sea. Out at sea, the tug captain signaled Berke to open the doors at the bottom of the pockets in order to dump the debris into the ocean. Berke responded and, after the dumping, the tug with the scow in tow headed back to New York. After dawn, Berke was observed by Mullin scraping the #1 pocket with a long pole. Approximately fifteen minutes later, as the tug was approaching the Verrazano Bridge, the tug slowed in order to shorten the tow lines so as to pull the S-3 alongside for better maneuverability in the harbor. A signal was given for Berke to help in changing the ropes but he did not appear. Therefore, the S-3 was pulled in immediately astern of the tug, and Mullin was sent on board to find Berke and to handle the ropes in bringing the scow alongside. After the manipulating of the ropes had been accomplished and after a search of the scow for Berke had proved fruitless, Mullin observed something, which turned out to be Berke, splashing in the water some distance astern of the scow. Berke was rescued and taken to the Marine Hospital on Staten Island, where he was treated for pneumonia and congestive heart failure. He was discharged on April 2, 1965, with the notation "Fit for duty." Since that time, Berke, then 65, has allegedly suffered marked physical and mental deterioration.

Plaintiff contends in his first cause of action that he fell overboard as a result of an alleged lack of equipment to clean the muddy debris off the deck of the scow and the alleged absence of a hand line around the perimeter of the boat. However, apparently because of his deteriorated mental state, Berke, though present in court during the trial, did not testify and Mullin was plaintiff's sole witness on the issues of negligence and unseaworthiness. In support of plaintiff's claims, Mullin testified that there was no hand line in place on the S-3 when he was helping Berke tie up under the Brooklyn Bridge on March 6, 1965, or on previous occasions; that at these times he had not seen the customary equipment for cleaning off the deck; and that he himself had slipped on the deck of the S-3 during Berke's rescue. However, the testimony as to the lack of cleaning equipment was stricken because Mullin had traversed only part of the S-3's perimeter that night and because he had not been looking for the equipment on any of the occasions mentioned. On cross-examination Mullin admitted that it was customary for hand lines to be removed during loading and that he was not surprised when he did not see them in place when the tug was made fast to the barge under the Brooklyn Bridge.

The trial judge's exclusion of Mullin's testimony relative to cleaning equipment was proper inasmuch as, under the circumstances, Mullin's testimony amounted to no more than a statement that he did not know whether such equipment was on the S-3. Nor does Mullin's testimony as to the condition of the scow at the time of Berke's rescue supply the evidence needed to show the alleged lack of cleaning equipment and hand lines. As Berke was the sole crew member of the S-3, an absence of hand lines from the deck perimeter and a slippery condition of...

To continue reading

Request your trial
12 cases
  • Saleeby v. Kingsway Tankers, Inc.
    • United States
    • U.S. District Court — Southern District of New York
    • August 18, 1981
    ...to defendants in our Circuit's Court of Appeals. See Johannessen v. Gulf Trading, 633 F.2d 653, 655 n.3 (2d Cir. 1980); Berke v. Lehigh, 435 F.2d 1073 (2d Cir.), cert. denied, 404 U.S. 825, 92 S.Ct. 55, 30 L.Ed.2d 53 (1970); Dunbar v. DuBois' Sons Co., 275 F.2d 304, 306 (2d Cir.), cert. den......
  • McMillan v. Tug Jane A. Bouchard
    • United States
    • U.S. District Court — Eastern District of New York
    • May 9, 1995
    ...further. See, e.g., Vella v. Ford Motor Co., 421 U.S. 1, 5, 95 S.Ct. 1381, 1383, 43 L.Ed.2d 682 (1975); Berke v. Lehigh Marine Disposal Corp., 435 F.2d 1073, 1076 n. 3 (2d Cir.1970), cert. denied, 404 U.S. 825, 92 S.Ct. 55, 30 L.Ed.2d 53 (1971). "Cure" consists of payments for all aspects o......
  • Haney v. Miller's Launch Inc.
    • United States
    • U.S. District Court — Eastern District of New York
    • November 15, 2010
    ...to curative as opposed to palliative treatment, the shipowner is liable for maintenance and cure.”) (citing Berke v. Lehigh Marine Disposal Corp., 435 F.2d 1073, 1076 (2d Cir.1970)); Desmond v. United States, 217 F.2d 948, 950 (2d Cir.1954), cert. denied, 349 U.S. 911, 75 S.Ct. 600, 99 L.Ed......
  • C-Suzanne Beauty Salon, Ltd. v. General Ins. Co. of America
    • United States
    • U.S. Court of Appeals — Second Circuit
    • March 17, 1978
    ...457 F.2d 1213, 1215 n. 5 (2d Cir.), cert. denied, 409 U.S. 997, 93 S.Ct. 320, 34 L.Ed.2d 262 (1972); Berke v. Lehigh Marine Disposal Corp., 435 F.2d 1073, 1075-76 n. 2 (2d Cir. 1970), cert. denied, 404 U.S. 825, 92 S.Ct. 55, 30 L.Ed.2d 53 (1971).9 It is noteworthy that the jury reached this......