FPL Energy, LLC v. Txu Portfolio Mgmt. Co.

Decision Date21 March 2014
Docket NumberNo. 11–0050.,11–0050.
Citation57 Tex. Sup. Ct. J. 325,426 S.W.3d 59
PartiesFPL ENERGY, LLC, FPL Energy Pecos Wind I, L.P., FPL Energy Pecos Wind II, L.P., and Indian Mesa Wind Farm, L.P., Petitioners, v. TXU PORTFOLIO MANAGEMENT COMPANY, L.P. n/k/a Luminant Energy Company, LLC, Respondent.
CourtTexas Supreme Court

OPINION TEXT STARTS HERE

Allen Ryan Paulsen, Anne McGowan Johnson, Ben L. Mesches, Nina Cortell, Haynes & Boone LLP, Jeffrey M. Tillotson, John D. Volney, Lynn Tillotson Pinker & Cox, LLP, Dallas, TX, for Petitioners.

Daniel Lee Gus, James W. Walker, Walker Sewell LLP, James C. Ho, Gibson Dunn & Crutcher LLP, Dallas, Lawrence J.C. VanDyke, Office of the Attorney General Solicitor General's Office, TX, for Respondent.

Gene Grace, American Wind Energy Company LLC, Washington, DC, for Amicus Curiae.

Justice GREEN delivered the opinion of the Court.

In this contract interpretation case, TXU Portfolio Management Company, L.P. (TXUPM) contracted to receive electricity and renewable energy credits (RECs) from wind farms owned by FPL Energy, LLC. FPL failed to provide the required electricity and RECs. TXUPM sued FPL for breach of contract; FPL counterclaimed, arguing TXUPM failed to provide FPL with sufficient transmission capacity. The trial court granted two partial summary judgments. First, it issued a declaratory judgment that the contracts required TXUPM to provide transmission capacity. Second, it declared the contracts' liquidated damages provisions unenforceable. The remaining issues were tried to a jury, and the trial court entered take-nothing judgments for both parties. Both parties appealed. The court of appeals reversed both summary judgment rulings. 328 S.W.3d 580, 591 (Tex.App.-Dallas 2010, pet. granted).

We address the following issues: (1) did TXUPM owe FPL a contractual duty to provide adequate transmission capacity to FPL; (2) if FPL breached and TXUPM did not, do the liquidated damages provisions apply to energy and RECs or only to RECs; and (3) are the liquidated damages provisions in these contracts enforceable? We affirm the court of appeals' holding that TXUPM owed no contractual duty to provide transmission capacity. However, we hold the liquidated damages provisions apply only to RECs and are unenforceable as a penalty. Accordingly, we reverse the court of appeals' judgment in part and remand the case to the court of appeals to determine damages.

I. Factual and Procedural Background

In Texas, the electric industry consists of three main components: power generation, power transmission, and power distribution. Electric producers own and operate generating facilities. The Electric Reliability Council of Texas, Inc. (ERCOT), with few exceptions, manages the transmission of electricity through an interconnected network—or grid—of transmission lines. Finally, retail electric providers distribute electricity directly to consumers.

In 1999, the Legislature created ambitious goals for renewable energy in Texas. See Act of May 27, 1999, 76th Leg., R.S., ch. 405, § 39, sec. 39.904, 1999 Tex. Gen. Laws 2543, 2598–99. The Legislature charged the Public Utility Commission of Texas (PUC) with establishing minimum renewable energy production requirements for all Texas electric providers. Tex. Util.Code § 39.904(c)(1). The Legislature also tasked the PUC with establishing a REC trading program. Id. § 39.904(b). A REC reflects one megawatt hour (MWh) “of renewable energy that is physically metered and verified in Texas.” 16 Tex. Admin. Code § 25.173(c)(13). Electric producers thus simultaneously create both electricity from renewable sources and the corresponding RECs, yet producers may choose to sell the two separately. Id. § 25.173(d). The REC trading program allows electric providers unable to satisfy the minimum renewable energy requirements to purchase and hold RECs “in lieu of capacity from renewable energy technologies.” Tex. Util.Code § 39.904(b); see16 Tex. Admin. Code § 25.173(d)(2).

TXU Electric, a retail electric provider (and a different entity than TXUPM), solicited proposals from renewable energy producers to meet the new renewable energy production requirements. In 2000, TXU Electric entered agreements with two wind farm subsidiaries of FPL: Pecos Wind I, L.P. and Pecos Wind II, L.P. Also in 2000, FPL acquired a third party's rights to a similar contract with TXU Electric for Indian Mesa Wind Farm, L.P. Under the contracts, FPL sells TXU Electric RECs and the renewable electric energy used to produce those credits. TXU Electric assigned the contracts to TXUPM, a power marketer and, importantly, not a retail electric provider. The contracts with Pecos Wind I and II are identical. The Indian Mesa contract largely contains the same provisions, but, as explained below, the parties point to relevant differences in support of their claimed intent at the time of contracting. Two provisions of these contracts give rise to this dispute: one provision governing TXUPM's transmission responsibilities and one providing for liquidated damages in the event that FPL fails to meet certain production requirements.

For approximately four years, FPL failed to produce the agreed upon electricity and RECs. TXUPM filed suit seeking damages for FPL's breach of the contracts. FPL counterclaimed, arguing that it could not meet its obligations because of congestion on the ERCOT grid. When the grid lacks capacity to transmit all energy produced in an area, ERCOT issues curtailment orders instructing certain facilities to cease production. FPL claims it received curtailment orders from ERCOT which, along with an unexpected lack of wind in the area, caused it to produce less energy than promised. FPL blamed the congestion and resulting curtailment orders on TXUPM, insisting that TXUPM bore responsibility to ensure transmission capacity for all energy FPL could produce.

Both parties filed motions for partial summary judgment. Each sought declaratory judgment to clarify the portions of the contracts relating to transmission capacity and liquidated damages. The trial court issued several rulings. First, the court declared that the contracts unambiguously required TXUPM to provide all transmission services, including transmission capacity, to FPL. Second, the court determined that the liquidated damages provisions in the contracts were not enforceable, and thus void, because a liquidated damages amount of $50 per REC was not a realistic forecast of damages.

Consistent with these rulings, the trial court's instructions to the jury indicated that TXUPM was required to provide transmission capacity and that the liquidated damages were unenforceable. The jury found that TXUPM should receive $8.9 million in compensatory damages for FPL's failure to deliver renewable energy, yet the jury determined that TXUPM secured cover for the missing electricity by acquiring substitute electricity. The jury also found that TXUPM owed no compensatory damages to FPL for TXUPM's alleged failure to ensure transmission capacity. The trial court entered judgment on the jury's verdict, ordering that (1) FPL take nothing on its claims; and (2) TXUPM take nothing, despite the jury's damage award, because TXUPM covered.

The court of appeals affirmed the take-nothing judgment for the damages claims but reversed and rendered judgment on the issues related to declaratory relief. 328 S.W.3d at 591. The court held that the contracts did not require TXUPM to provide the necessary transmission capacity. Id. at 587. As to liquidated damages, the court of appeals held that the provisions were enforceable because damages were difficult to estimate, the $50 rate was a reasonable estimate of just compensation, and FPL could not meet its burden to show that the $50 rate was disproportionate to TXUPM's actual damages. Id. at 587–90.

We granted FPL's petition for review and address the three issues before us-whether TXUPM was responsible for ensuring transmission capacity, whether the liquidated damages provisions apply to failure to deliver electricity, and whether the liquidated damages provisions are enforceable. 55 Tex.Sup.Ct.J. 320 (Feb. 17, 2012).

II. Contract Interpretation

Before deciding the enforceability of the liquidated damages provisions, we must resolve two matters of contract interpretation—TXUPM's responsibility for transmission capacity and the scope of the liquidated damages provisions. Our analysis begins with the legal question of the contracts' ambiguity. See Dynegy Midstream Servs., Ltd. P'ship v. Apache Corp., 294 S.W.3d 164, 168 (Tex.2009). If we can give a clear and definite legal meaning to a contract, it is not ambiguous as a matter of law. Gilbert Tex. Constr., L.P. v. Underwriters at Lloyd's London, 327 S.W.3d 118, 133 (Tex.2010). An ambiguous contract, however, has a doubtful or uncertain meaning or is reasonably susceptible to multiple interpretations; we will not find ambiguity simply because the parties disagree over a contract's meaning. Dynegy Midstream Servs., 294 S.W.3d at 168. Our primary concern in contract interpretation is to “ascertain the true intentions of the parties as expressed in the instrument.” Coker v. Coker, 650 S.W.2d 391, 393 (Tex.1983). We consider the entire writing to harmonize and effectuate all provisions such that none are rendered meaningless. Id. Further, we “construe contracts from a utilitarian standpoint bearing in mind the particular business activity sought to be served.” Frost Nat'l Bank v. L & F Distribs., Ltd., 165 S.W.3d 310, 312 (Tex.2005) (per curiam) (quoting Reilly v. Rangers Mgmt., Inc., 727 S.W.2d 527, 530 (Tex.1987)).

A. Transmission Capacity

We first consider whether the contracts require TXUPM to provide adequate transmission capacity to FPL. The trial court and the court of appeals found section 2.03 unambiguous, a finding the parties do not challenge. 328 S.W.3d at 584–85. We may, nonetheless, declare a contract ambiguous, see J.M. Davidson, Inc. v. Webster, 128...

To continue reading

Request your trial
84 cases
  • McGinnes Indus. Maint. Corp. v. Phx. Ins. Co.
    • United States
    • Texas Supreme Court
    • June 26, 2015
    ...819, 824 (Tex.1997).1 Am. Mfrs. Mut. Ins. Co. v. Schaefer, 124 S.W.3d 154, 162 (Tex.2003) ; see also, e.g., FPL Energy, LLC v. TXU Portfolio Mgmt. Co., 426 S.W.3d 59, 68 (Tex.2014) (refusing to "selectively import terms" into a contract); State Farm Lloyds v. Johnson, 290 S.W.3d 886, 893 (T......
  • BCC Merch. Solutions, Inc. v. Jet Pay, LLC
    • United States
    • U.S. District Court — Northern District of Texas
    • September 8, 2015
    ...entire writing [is] to harmonize and effectuate all provisions such that none are rendered meaningless." FPL Energy, LLC v. TXU Portfolio Mgmt. Co., L.P., 426 S.W.3d 59, 63 (Tex.2014) (citing Coker v. Coker, 650 S.W.2d 391, 393 (Tex.1983) ). Moreover, an ambiguity is not created "simply bec......
  • Bonsmara Natural Beef Co. v. Hart of Tex. Cattle Feeders, LLC
    • United States
    • Texas Supreme Court
    • June 26, 2020
    ...a fact-finder has awarded a higher amount of damages without reference to that provision. See, e.g. , FPL Energy, LLC v. TXU Portfolio Mgmt. Co. , 426 S.W.3d 59, 62 (Tex. 2014) ; Rio Grande Valley Sugar Growers, Inc. v. Campesi , 592 S.W.2d 340, 341–43 (Tex. 1979). Because the FAA places ar......
  • Elec. Reliability Council of Tex., Inc. v. Panda Power Generation Infrastructure Fund, LLC (In re Panda Power Infrastructure Fund, LLC)
    • United States
    • Texas Supreme Court
    • March 19, 2021
    ...Holdings II, LLC; and Panda Temple Power II, LLC. We will refer to them collectively as Panda.2 See FPL Energy, LLC v. TXU Portfolio Mgmt. Co. , 426 S.W.3d 59, 61 (Tex. 2014).3 See Oncor Elec. Delivery Co. LLC v. Pub. Util. Comm'n of Tex. , 507 S.W.3d 706, 708 n.1 (Tex. 2017) ; Pub. Util. C......
  • Request a trial to view additional results
1 books & journal articles
  • Chapter 3-1 Breach of Contract
    • United States
    • Full Court Press Texas Commercial Causes of Action Claims Title Chapter 3 Contract and Commercial Litigation*
    • Invalid date
    ...Dist.] 2011, no pet.).[32] Phillips v. Phillips, 820 S.W.2d 785, 788 (Tex. 1991).[33] FPL Energy, LLC v. TXU Portfolio Mgmt. Co., L.P., 426 S.W.3d 59, 69-70 (Tex. 2014).[34] Atrium Med. Ctr., LP v. Hous. Red C LLC, 595 S.W.3d 188, 190 (Tex. 2020).[35] FPL Energy, LLC v. TXU Portfolio Mgmt. ......