Hanson Housing Authority v. Dryvit System, Inc.

Decision Date23 October 1990
Docket NumberNo. 89-P-150,89-P-150
Citation560 N.E.2d 1290,29 Mass.App.Ct. 440
PartiesHANSON HOUSING AUTHORITY v. DRYVIT SYSTEM, INC., et al. 1
CourtAppeals Court of Massachusetts

David S. Rosenthal (John P. Connelly, Boston, with him), for plaintiff.

Lisa D. Campolo, Boston, for Dryvit System, Inc.

Before BROWN, CUTTER and JACOBS, JJ.

JACOBS, Justice.

Before us is the issue of the timeliness of the claims against the defendant, Dryvit System, Inc. (Dryvit). On May 21, 1987, the plaintiff, Hanson Housing Authority, filed a complaint in the Superior Court against a contractor, Concrete Construction Co. of Everett, Inc. (Concrete), Concrete's bond surety, and Dryvit. The plaintiff appeals from a summary judgment entered on the stated ground that all of the claims asserted by it against Dryvit were barred by various applicable statutes of limitation.

The plaintiff had engaged Concrete to construct a housing project containing seventeen apartment buildings, a garage, and a community building. Among other things, the contract documents required Concrete to install an exterior wall system designed and supplied by Dryvit (the Dryvit System). 2 Concrete retained a subcontractor (who was ultimately impleaded in this action) to install the Dryvit System. Dryvit, other than supplying the components, was not involved in the physical installation of the Dryvit System. A certificate of completion of the project was issued by the plaintiff to Concrete on June 16, 1981.

The plaintiff, in its complaint, alleged generally that the walls of the project were improperly constructed; that cracks developed in the exterior finish, joints, and caulking; and that, as a result, water penetrated the buildings causing "serious structural and cosmetic damage" to the project. The plaintiff's complaint, in addition to stating claims against Concrete and its surety, contained the following described eight counts against Dryvit: Count VI, for negligent design; Count VII, for negligent failure to warn and provide adequate instructions; Count VIII, for negligent training and certification; Count IX, for negligent inspection and supervision; Count X, for breach of implied warranties Count XI, for breach of express warranties; Count XII, for misrepresentation; and Count XIII, for violation of G.L. c. 93A, § 11. Dryvit, in its answer and motion for summary judgment, asserted that all of the claims against it were time barred by the applicable statutes of limitation. 3

The materials properly before the judge establish the following uncontroverted facts. An architect and a full-time clerk of the works were on the project site on behalf of the plaintiff during construction. The contract documents gave the architect the right to inspect and uncover any of the construction work. In 1980, the project's maintenance supervisor observed that some caulking on an expansion joint between buildings numbered seven and eight was "falling out." 4 In 1982, the maintenance supervisor noticed some bubbling in the Dryvit System finish coat at a spot in the end wall of building nine. At the time, he pushed against the wall in the area of the bubbling and "felt it moving back and forth." The plaintiff had the bubbling repaired shortly thereafter. Also, in 1982, the maintenance supervisor noticed "a couple of big cracks," one where buildings thirteen and fourteen were joined and the other where buildings fifteen and sixteen were joined.

On May 17, 1982, the maintenance supervisor and a representative of Dryvit inspected the exterior wall system of the project. The Dryvit inspector observed "some bubbling and cracking of an exterior wall ..., some vertical cracks at right angle intersections of some walls [and] some failure of the caulking." He also observed that, "[w]here finish was removed from bubbled area, fiberglass mesh was not imbedded into the primus adhesive and was totally exposed above the primus adhesive." Although these observations are not imputed directly to the plaintiff, they confirm the existence and detectability, in 1982, of the physical signs observed. By a letter dated July 8, 1982, an architect notified the Department of Community Affairs of the Commonwealth that the plaintiff had inquired of him if it had any recourse with respect to "Dryvit leaks" at the project. 5

Between 1982 and 1985, the plaintiff was not informed of any aggravation of the condition of the exterior wall system or of any evidence of water penetration or other deficiency. In 1985, a consultant reported to the plaintiff that he observed some exterior cracks and mesh protrusion in the exterior walls of the project. In 1986, he concluded, on the basis of testing and laboratory analysis, that water had penetrated the exterior walls through the cracks in the project's walls and caused damage to portions of the walls interior to the Dryvit System. He reported these conclusions to the plaintiff.

In ordering summary judgment, the judge relied on Melrose Hous. Authy. v. New Hampshire Ins. Co., 402 Mass. 27, 520 N.E.2d 493 (1988). He noted that the plaintiff, during construction, was in a situation similar to that presented in Melrose, in that it had available to it the services of an architect with authority to inspect and test the work and a clerk of the works who was employed on a full-time basis to inspect the work. He found that the plaintiff "had the means at its disposal to learn of the defects while construction was in progress," and that, "[t]herefore, the discovery rule does not apply, because the defects were not inherently unknowable at the time of construction." The "discovery rule" holds that "certain causes of action based on inherently unknowable wrongs do not accrue until the plaintiff learns, or reasonably should have learned, that he has been harmed by the defendant's conduct." White v. Peabody Constr. Co., 386 Mass. 121, 129, 434 N.E.2d 1015 (1982), citing Hendrickson v. Sears, 365 Mass. 83, 310 N.E.2d 131 (1974). The judge concluded that the applicable statutes of limitation began running when the certificate of completion was issued (1981), and that the plaintiff's claims were barred by the operation of those limitations well before the complaint was filed.

The plaintiff argues that the judge mistakenly read its complaint against Dryvit as being grounded on improper installation of the exterior wall system rather than defects in its design; that its complaint presents essentially a products liability case; that the design defects were inherently unknowable at the time of construction and installation; that the discovery rule was, therefore, applicable to this action; and that summary judgment should not have been granted since genuine issues exist as to when the plaintiff knew or should have known that it had been harmed by the defendant's conduct. 6

In the main, the judge's reliance on Melrose was appropriate. Most of the plaintiff's claims against Dryvit relate to matters which could have been discovered by the architect and clerk of the works during the construction phase of the project. Any negligence of Dryvit in providing instructions (Count VII), in training and certification of installers (Count VIII), and in inspecting the wall construction (Count IX) was readily discoverable before completion of construction and, therefore, was not inherently unknowable. Anthony's Pier Four, Inc. v. Crandall Dry Dock Engrs., Inc., 396 Mass. 818, 825-826, n. 9, 489 N.E.2d 172 (1986) (qualifications of project workmen and subcontractors are not inherently unknowable). See also Graveline v. BayBank Valley Trust Co., 19 Mass.App.Ct. 253, 473 N.E.2d 700 (1985) (plaintiff charged with knowledge of that which could be discerned by an inspection at the time of purchase of home).

It is established that misrepresentation claims may be subject to the discovery rule. Friedman v. Jablonski, 371 Mass. 482, 358 N.E.2d 994 (1976). Graveline v. BayBank Valley Trust Co., supra. The plaintiff's misrepresentation count (Count XII), however, is not entitled to that benefit. For the most part, it repeats the negligence allegations of Counts VII, VIII, and IX, and, therefore, as we have indicated in our discussion of those counts, does not implicate inherently unknowable facts. The remaining allegations of Count XII are to the effect that Dryvit failed to disclose certain significant information. They are nothing more than averments of fraudulent concealment. "There is no allegation of any positive acts of concealment of the cause of action, and, in the absence of a fiduciary relationship, silence cannot constitute fraudulent concealment." Friedman v. Jablonski, 371 Mass. at 485 n. 3, 358 N.E.2d 994. There being no evidence of a fiduciary relationship between the plaintiff and Dryvit, the claims alleging failure to disclose were properly swept up by the summary judgment along with the rest of the claims in the misrepresentation count.

Portions of Count VI of the plaintiff's complaint, given the manifold benefits of liberal construction, 7 reasonably may be read to allege inherently unknowable design defects in the form of components which were not thick enough to permit the proper imbedding of the fiberglass mesh and to prevent cracking and water penetration. Similarly, the warranty claims (Counts X and XI) could be construed as alleging inherently unknowable breaches of warranties relating to the exterior walls remaining water proof and free of cracks and maintenance problems. The plaintiff argues that such allegations implicate the discovery rule and that there are genuine issues of fact as to when it learned or should have learned that it had been harmed by the design defects and breaches of warranty.

The Supreme Judicial Court has stated:

"In all cases the statute of limitations begins to run when the injured person has notice of the claim. The 'notice' required is not notice of every fact which must eventually be proved in support...

To continue reading

Request your trial
34 cases
  • Town of Princeton v. Monsanto Co.
    • United States
    • U.S. District Court — District of Massachusetts
    • August 10, 2016
    ...at least some degree of harm must come to the plaintiff as a result of defendant's conduct. Hanson Hous. Auth. v. Dryvit Sys., Inc. , 29 Mass.App.Ct. 440, 446, 560 N.E.2d 1290 (1990) (citing Town of Mansfield v. GAF Corp. , 5 Mass. App. Ct. 551, 555, 364 N.E.2d 1292 (1977)). Thereafter, the......
  • Borden v. Paul Revere Life Ins. Co.
    • United States
    • U.S. Court of Appeals — First Circuit
    • April 1, 1991
    ..."[i]t is established that misrepresentation claims may be subject to the discovery rule." Hanson Housing Auth. v. Dryvit System, Inc., 29 Mass.App.Ct. 440, 560 N.E.2d 1290, 1293 (1990), rev. denied, 409 Mass. 1101, 565 N.E.2d 792 (1991). Under that rule, a cause of action in either contract......
  • Financial Res. Network Inc. v. Brown & Brown Inc.
    • United States
    • U.S. District Court — District of Massachusetts
    • November 18, 2010
    ...of the defendant's conduct.’ ” Genereux v. American Beryllia Corp., 577 F.3d at 359; see also Hanson Housing Authority v. Dryvit System, Inc., 29 Mass.App.Ct. 440, 560 N.E.2d 1290, 1293 (1990) (recognizing that “misrepresentation claims may be subject to the discovery rule”). “ ‘Reasonable ......
  • Power Control Devices, Inc. v. Orchid Techs. Eng'g & Consulting, Inc.
    • United States
    • U.S. District Court — District of Massachusetts
    • September 12, 2013
    ...not in a state of “blameless ignorance” as would toll the onset of the limitations period. See Hanson Hous. Auth. v. Dryvit Sys., Inc., 29 Mass.App.Ct. 440, 447, 560 N.E.2d 1290, 1295 (1990), rev. denied,409 Mass. 1101, 565 N.E.2d 792 (1991) (Table). Moreover, it should be noted that even i......