Johnson v. Flammia

Decision Date02 September 1975
CourtConnecticut Supreme Court
PartiesRobert E. JOHNSON et al. v. Frederick A. FLAMMIA et al.

David E. Kamins, Hartford, for appellants (defendants).

Herbert Watstein, Bristol, for appellees (plaintiffs).

Before HOUSE, C.J. and LOISELLE, BOGDANSKI, LONGO and BARBER, JJ.

LONGO, Associate Justice.

The plaintiffs brought this action to recover damages resulting from the performance of a contract for the installation of a swimming pool on their property. The jury awarded damages in the amount of $9100 in favor of the plaintiffs. The defendants appealed from the judgment entered on the verdict, assigning error to the denial by the trial court of their motions for a directed verdict and to set aside the verdict.

The plaintiffs offered evidence to prove and claimed to have proved the following facts: In May, 1971, the plaintiffs discussed the purchase and installation of a swimming pool with the defendant John B. Cipriano, who, with the defendant Frederick A. Flammia, operated the Clearwater Pool Company. Cipriano represented to the plaintiffs that he was a pool engineer and an expert in the pool business. The plaintiff Robert E. Johnson stressed that the area where the pool was to be installed was very wet with a high water table, and the defendant Cipriano assured him that there was no problem, since he had installed pools in worse areas. The plaintiffs relied heavily on the defendant Cipriano's representation that the pool would be installed properly and signed a contract agreeing to pay $5600 for the pool. The manufacturer's pool installation manual contained detailed installation instructions which the defendants were required to follow. Included among these instructions were the following: Because of seepage, the placing of the pool in low areas should be avoided; grading should permit surface drainage, rain water and pool splash to run away from the pool; backfilling should be done at approximately the rate of rise of the water on the inside, without exceeding the height of the water by more than six inches. Due to a few weeks of rain, the defendants were not able to commence excavation until the ground had dried to some extent. At the time of the backfilling, there was no water in the pool. After the backfilling, 48,000 gallons of water were put into the pool. The pool was completed some time in the middle of May, and no defects were found. Both the plaintiffs and the defendants agreed that the defendants had completed all of their obligations under their contract. Three weeks after the pool had been used without complaint, the plaintiffs observed, after a summer storm, mud and water entering the pool between the liner and wall panels at the deep end of the pool, and soon thereafter the pool started to buckle. The pool was drained, the defendants made necessary repairs and the pool was refilled. However, the pool again buckled, and the plaintiffs, at the suggestion of the defendant Cipriano, hired a contractor to dig a trench around a portion of the pool. After repairs were completed, rocks pushed up against the liner bottom, and other defects appeared after the next rainfall. The plaintiffs consulted with a contractor who had twenty-four years of pool construction experience, including both concrete and liner pools and soil conditions. In his opinion, the conditions he found resulted from the entire area being saturated with water which caused excessive water presure. To remedy the conditions, he estimated the cost to place the pool in proper condition, including a concrete floor with reinforced steel would be $5200.

The defendants offered evidence to prove and claim to have proved the following: The representation made by the defendant Cipriano indicating that there would be no problem with the pool installation was made in good faith, based upon past experiences. The pool was properly installed, in accordance with the instructions in the manufacturer's manual, in the highest point in the plaintiffs' backyard, where the plaintiffs wanted it located. The defendant backfilled the pool with water going in as required in the manual; otherwise the walls of the pool would have fallen down at the time of backfilling. The defendants recommended that the plaintiffs construct a curtain drain at the time the pool was installed to control any run-off that could arise, but the plaintiffs rejected this suggestion. The cost for this was not included in the contract price, nor was the providing of a curtain drain the responsibility of the defendants under the contract. The defendants installed the pool in accordance with reasonable standards of workmanship. In order to provide the plaintiffs with the type of pool for which they bargained, the cost of repairs would have been $1500, while the $5200 cost of repairs estimated by the plaintiffs' contractor would provide the plaintiffs with a different type of pool than they had agreed to purchase.

We first consider the issue of liability. The issues submitted to the jury were contained in the first three counts of the five-count complaint. The first count alleges breach of contract and the second count alleges negligence in the performance of the contract. The specifications of negligence contained in both counts are essentially the same. The defendants concede that the controlling issue is whether the defendants used reasonable care and reasonable skill in performing their obligations under the contract. The third count alleges fraudulent misrepresentations to induce the plaintiffs to enter into the contract. The jury returned a general verdict and answered interrogatories indicating that the verdict was found in favor of the plaintiffs on each count. Where a complaint is divided into separate counts and a general verdict is returned, it will be presumed, if the charge and all rulings are correct on any count, that damages were assessed as to that count and the verdict will be sustained. Sheeler v. Waterbury, 138 Conn. 111, 114, 82 A.2d 359; see Meglio v. Comeau, 137 Conn. 551, 553, 79 A.2d 187. It is not necessary for us to determine whether the facts bring this case within the third count alleging fraudulent misrepresentations, since the general verdict as to liability can be supported under the first count and second count of the complaint. Mercier v. Naugatuck Fuel Co., 139 Conn. 521, 525, 95 A.2d 263.

The defendants have assigned as error the court's refusal to direct a verdict in their favor. The correctness of the court's ruling is tested by the evidence printed in the appendices to the briefs. Fleming v. Becker, 162 Conn. 563, 565, 295 A.2d 524. There was evidence from which the jury could reasonably have found that there was no water in the pool at the time of backfilling and that the pool was set too low for the area. If the evidence presented is in conflict and more than one conclusion is reasonably open to the jury, particularly when it consists of oral testimony, and if the jury may reasonably draw different inferences from the evidence, or if the jury could be called to pass upon the credibility of witnesses or their testimony, a verdict should not be directed by the court. Loukides v. United Illuminating Co., 160 Conn. 66, 70, 273 A.2d 719; Terminal Taxi Co. v. Flynn, 156 Conn. 313, 317, 240 A.2d 881. On all the evidence and the reasonable inferences to be drawn therefrom, the plaintiffs' claims of negligence and proximate cause raised questions of fact which should properly be left to the determination of the jury. Pinto v. Spigner, 163 Conn. 191, 198, 302 A.2d 266. The court was not in error in refusing to direct a verdict.

A party may be liale in negligence for the breach of a duty which arises out of a contractual relationship. Sasso v. Ayotte, 155 Conn. 525, 529, 235 A.2d 636. Even though there may not be a breach of contract, liability may arise because of injury resulting from negligence occurring in the course of performance of the contract. Dean v. Hershowitz,119 Conn. 398, 409, 410, 177 A. 262; 65 C.J.S. Negligence § 4(6). When the defendants undertook to install the pool, they were under a duty to exercise that degree of care which a skilled pool installer of ordinary prudence would have exercised under the same or similar conditions. See Goodrich Oil Burner Mfg. Co. v. Cooke, 126 Conn. 551, 553, 12 A.2d 833; Ferrie v. Sperry, 85 Conn. 337, 343, 82 A. 577; see Bertozzi v. McCarthy, 164 Conn. 463, 471, 323 A.2d 553. The test to be applied was whether an experienced installer of swimming pools under the circumstances of this case, knowing what was known or should have been known concerning the water conditions, particularly with reference to the high water table and drainage conditions, would anticipate the harm, of the general nature of that suffered in this case, that was likely to result. The defendant Cirpriano was familiar with the instruction in the installation manual that backfilling must be done as the water was entering the pool. He agreed that the requirement was a sound one, and, if not followed, the pool would be distorted. The plaintiff Adrienne A. Johnson testified that there was no water in the pool at the time of backfilling and that the defendants made no percolation tests prior to excavation. Although these claims were denied by the defendant Cipriano, it is apparent that the jury chose to believe the plaintiffs, and that is within their province. We cannot retry the facts or pass upon the credibility of the witnesses. Novella v. Hartford Accident & Indemnity Co., 163 Conn. 552, 561, 316 A.2d 394, and cases cited. In addition the plaintiffs' expert testified that the pool was set too low for the area and proper elevations should have been...

To continue reading

Request your trial
125 cases
  • Solomon v. Aberman
    • United States
    • Connecticut Supreme Court
    • 4 Junio 1985
    ... ... Gallo, 184 Conn. 36, 38, 440 A.2d 782 (1981); Johnson v. Flammia, 169 Conn. 491, 497, 363 A.2d 1048 (1975). Our examination of the record in this case commends to us what the United States Supreme ... ...
  • Waterbury Petroleum Products, Inc. v. Canaan Oil and Fuel Co., Inc.
    • United States
    • Connecticut Supreme Court
    • 22 Mayo 1984
    ...for estimating [his] loss." Grant v. West Haven Gardens Co., 181 Conn. 379, 387, 435 A.2d 970 (1980), quoting Johnson v. Flammia, 169 Conn. 491, 500-501, 363 A.2d 1048 (1975). As stated above, the sole evidence offered to prove these damages was the testimony of Devino. There was no other e......
  • Griffin v. Nationwide Moving and Storage Co., Inc.
    • United States
    • Connecticut Supreme Court
    • 22 Junio 1982
    ...(1955); Clark v. Haggard, supra. This court cannot retry the facts or pass on the credibility of the witnesses. Johnson v. Flammia, 169 Conn. 491, 497, 363 A.2d 1048 (1975); Novella v. Hartford Accident & Indemnity Co., 163 Conn. 552, 561, 316 A.2d 394 (1972). The items were, of course, not......
  • Batchelar v. Interactive Brokers, LLC
    • United States
    • U.S. District Court — District of Connecticut
    • 30 Septiembre 2019
    ...principle that an independent claim of tortious conduct may arise in the context of a contractual relationship."); Johnson v. Flammia, 169 Conn. 491, 496, 363 A.2d 1048 (1975) ("liability may arise because of injury resulting from negligence occurring in the course of performance of the con......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT