Saunders v. Washington Metropolitan Area Trans. Auth., Civ. A. No. 616-73

Decision Date10 May 1973
Docket NumberCiv. A. No. 616-73,721-73.
Citation359 F. Supp. 457
PartiesJoseph J. SAUNDERS v. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY. Timothy D. SMITH v. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY.
CourtU.S. District Court — District of Columbia

Joseph J. Saunders, Washington, D. C., William J. Howard, Washington, D. C., for plaintiffs.

Peter J. Ciano, Washington Metropolitan Area Transit Authority, Washington, D. C., Jordan S. Himelfarb, Asst. Gen. Counsel, Washington Metropolitan Area Transit Authority, Washington, D. C., for defendant.

MEMORANDUM OPINION

AUBREY E. ROBINSON, Jr., District Judge.

These consolidated actions are before the Court on Plaintiffs' Motions for a Preliminary Injunction. Plaintiffs in both cases are all residents of the area of 37th and Yuma Streets, North West, Washington, D. C., who seek to enjoin construction of a subway route, segment A-9a, through that area. In addition Plaintiffs seek to halt construction of a contiguous segment of the subway route, segment A-6a, on the grounds that construction of that segment would foreclose adoption of alternative plans for the A-9a segment. The vicinity of 37th and Yuma Streets, North West, is a residential area characterized by substantial, attractive homes, well cared for lawns and gardens and quiet, tree-lined streets. The A-9a segment, as presently planned, will proceed under five residential blocks on Yuma Street, linking two major thoroughfares, Connecticut and Wisconsin Avenues. Construction will be done by underground tunneling for the most part, though some surface disruption both temporary and permanent, is likely. The A-9a route segment was the subject of a public hearing for interested area residents on November 9, 1971.

Plaintiffs contend that the public hearing held by Defendant Transit Authority (hereafter Metro) on the proposed subway segment A-9a was so flawed as to be inadequate to suffice as the public hearing required by law. Plaintiffs contend that Metro had an obligation at or prior to the public hearing on the Yuma Street segment of the subway route to provide information concerning the adverse impact of the subway on Yuma Street, specially that vent shafts, with metal grates at the surface, would be required in the vicinity of 37th and Yuma Streets.1 Plaintiffs also contend that Metro unlawfully failed to consider environmental and aesthetic factors, in adopting the A-9a route plan, and further that Metro was required, but failed, to prepare an environmental impact statement pursuant to the National Environmental Policy Act, 42 U. S.C. § 4332.2

Defendant has moved, pursuant to Rule 65(a)(2), Federal Rules of Civil Procedure, that the determination on the Preliminary Injunction in this matter be treated as a final determination on the merits of the case. That motion will be granted. Accordingly, the Court has looked not merely to the likelihood of success on the merits,3 but, there appearing no material issue of fact in dispute, has made a final determination on the merits of Plaintiffs' claims.

With regard to Plaintiffs' claims that Metro failed to consider any environmental and aesthetic factors as required by law,4 the record is clear that these matters were the subject of much comment at the public hearing5 and that those comments and other relevant materials were given due consideration6 by the Metro Board of Directors in adopting the A-9a route plan. Plaintiffs' contentions on this point are without merit. With regard to the alleged requirement for an environmental impact statement, the National Environmental Policy Act by its terms applied only to Federal agencies.7 Metro was created by Interstate Compact and is an agency only of its constituent jurisdictions. The Compact was ratified by Congress,8 as required by the Constitution for all such Compacts9 and was authorized and approved by Congress on behalf of the District of Columbia as a signatory jurisdiction.10 But Plaintiff has offered nothing which indicates that Metro thereby became a Federal agency.11

With regard to the adequacy of the public hearing on the A-9a route segment, however, the Court finds Plaintiffs' contentions on firmer ground. The Metro Compact requires that public hearings be held on the transit plan,12 which plan is to include the design and location of transit facilities,13 and vent shafts are clearly included in the Compact's definition of such facilities.14 They are a "major element"15 of the A-9a route plan and the record indicates that they may have a significant impact on residential Yuma Street.16 The Bootery17 case specifically outlined the purpose of public hearings on Metro plans:

". . . the language and clear intent of the Compact require that an affected party have an adequate opportunity to challenge the Authority's proposals as they may adversely affect his or her interests."18

Defendant contends that the Bootery decision is applicable only to persons to be dislocated by Metro construction. It is true that the Court in that case focused its attention on parties to be displaced, but that was the plight of the Plaintiffs in that case. This Court does not view the Bootery as so limited. In the Bootery the Court noted that dislocation of families and businesses was specifically mentioned in the Metro Compact.19 So also in the same subsection of the Compact are mentioned "environmental amenities and aesthetics."20 It is the conclusion of the Court that Plaintiffs had a right under the Compact to be heard with respect to the design and location of vent shafts in the vicinity of 37th and Yuma Streets.21 This aspect of environmental impact was not previously considered by the Metro Board. The 1971 hearing was defective in this regard and Metro will be ordered to hold a new public hearing on the A-9a segment. The hearing will be limited, however, to the location and design of vent shafts in the vicinity of 37th and Yuma Streets, North West. The Court finds that all other aspects of the A-9a route segment here disputed were previously accorded due consideration and opportunity for public comment. There is no likelihood that those other aspects, including route location, would be so affected by a public hearing on location and design of vent shafts as to warrant a full hearing de novo on all aspects of the A-9a route segment.

The Court does not accept Plaintiffs' broad reading of the word "details" in Paragraph 8 of the Bootery decree.22 There is no need for a public hearing on each minor "detail" of Metro plans, but only on the major elements of the plan such as stations, routes, station access points and fan and vent shafts. The word "major" in this sense should not be defined by arguments over semantics, the cost of construction, or size of the facility. The real public interest in opportunity to be heard should be measured in the impact of the facility on people affected, whether that be by actual displacement, taking of property, or removal of trees and altering the character of a neighborhood. Plaintiffs have no absolute right to block the subway or the vent shafts, but they do have a right to be heard on the design and location of those facilities. This process "subjects officials to the differing views of competing interest groups and forces them to take account of prevailing views while the project plans are still being formulated."23

Defendant has contended that only general plans for the vent shafts were in existence at the time of the public hearing and that those general plans were available at the hearing. It is clear that the vent shafts locations were not discussed at the public hearing, that their proposed general location was not included in the "information kits" distributed to area residents, and that they were not noted on the large stage maps on display at the hearing. Defendant contends that diagrams showing the proposed general locations were among piles of maps and diagrams on large tables outside the hearing room.24 The Court rejects any implication that this was adequate notice, especially in light of the fact that the Notice of Hearing affirmatively stated that "the location of these facilities cannot presently be determined." The same rationale applies to Metro's argument that Plaintiffs could have discovered more information about the shafts by investigating further at Metro offices. If the required public hearings are to be meaningful the burden must be on Metro to provide adequate notice concerning items which are likely to be the focus of interest on the part of persons affected.

Defendant's argument of laches is without merit. Aside from the affirmative representations at the hearing that vent shafts locations would not be determined until the Summer or Fall of 1972,25 Plaintiff Saunders requested soon after the public hearing information and consultation as to vent shafts "when the very earliest staff planning is taking place."26 Despite this Plaintiffs were not further advised until September, 1972, when they were informed that the vent shafts locations had been finally determined. Since that time Plaintiffs have vigorously pursued their interests and Metro has been on notice of their concern.

Once on notice of Plaintiffs' concern after their September, 1972, meeting, Metro did act in a seemingly bona fide manner to consider Plaintiffs' objections, including preparation of a formal study of alternative vent shafts locations and configurations. Yet private meetings with certain concerned citizens cannot suffice for a public hearing, for a solution offered by one party at a private meeting might be the cause of great...

To continue reading

Request your trial
11 cases
  • State Of N.Y. v. Atl. States Marine Fisheries Comm'n
    • United States
    • U.S. Court of Appeals — Second Circuit
    • June 29, 2010
    ...review provisions of the APA. The ASMFC is a body comprised “only of its constituent” states. Cf. Saunders v. Wash. Metro. Area Transit Auth., 359 F.Supp. 457, 460 (D.D.C.1973). A finding that the ASMFC is a “quasi-federal” agency would be in tension with its governing Compact, which serves......
  • Comm. of 100 on the Fed. City v. Foxx
    • United States
    • U.S. District Court — District of Columbia
    • April 7, 2015
    ...other effects to the aesthetic and historic features of a Connecticut parkway to be irreparable harm); Saunders v. Wash. Metro. Area Transit Auth., 359 F.Supp. 457, 462 (D.D.C.1973) (enjoining subway construction because, in addition to procedural harms, “[p]laintiffs would suffer irreparab......
  • Simmans v. Grant
    • United States
    • U.S. District Court — Southern District of Texas
    • January 22, 1974
    ...823, 834 (2d Cir. 1972), cert. denied, 412 U.S. 908, 93 S.Ct. 2290, 36 L.Ed.2d 974 (1973) (same); Saunders v. Washington Metropolitan Area Transit Authority, 359 F.Supp. 457, 460 (D.D.C.1973) (construction of surface-level subway vents displace trees or grass and increase noise level). Neve......
  • Schindler Elevator Corp. v. Wash. Metro. Area Transit Auth.
    • United States
    • U.S. District Court — District of Columbia
    • December 23, 2020
    ...APA" because it was "not a federal instrumentality"), aff'd , 907 F.3d 152 (4th Cir. 2018) ; see also Saunders v. Wash. Metro. Area Transit Auth. , 359 F. Supp. 457, 460 (D.D.C. 1973) ("Metro was created by Interstate Compact and is an agency only of its constituent jurisdictions. The Compa......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT