Sherman v. Deihl

Decision Date21 June 2006
Docket NumberNo. 27071.,27071.
PartiesDan SHERMAN and Sharon Sherman, his wife, Plaintiffs-Respondents, v. Mark DEIHL and David Degraf, d/b/a D & D Enterprises, Defendants-Appellants.
CourtMissouri Court of Appeals

Joanne M. McCracken, Garfield, AR, for Appellants.

Abe R. Paul, Pineville, for Respondents.

NANCY STEFFEN RAHMEYER, Presiding Judge.

Dan Sherman ("Sherman") owned land, which he offered for sale through a real estate company; two potential buyers, Mark Diehl and David DeGraff (collectively, "Buyers"), sought to purchase 4.0 acres. A contract, which is the subject of this litigation, was entered into by the parties for the sale of the land. Sherman, however, refused to close on the sale even though Buyers claimed to be ready, willing and able to close. The trial court declared the contract void and Buyers appeal. We affirm.

Sherman obtained title to 4.48 acres of land in McDonald County by a warranty deed, recorded on July 25, 2003. Approximately a week to ten days after recording his deed, he listed the land for sale. Buyers sought to purchase Sherman's property. John Philliber ("Philliber") of Hutchinson Real Estate represented both Sherman and Buyers, and an initial offer to purchase the land for $34,000 was rejected by Sherman. Negotiations continued, but the parties never met; they only communicated indirectly through Philliber.

Eventually, Sherman offered to sell the front 4.0 acres of the 4.48 acre tract for $40,000 and retain the 0.48 acre running across the back portion of the land. The precise language under legal description and address is "Section 20 Towship [sic] 21 Range 31 McDonald County, Missosuri [sic] 4 acres (.48 to remain with seller) With 190 Feet of Road Frontage (Total Acres is [sic] 4.48)." Buyers accepted the offer and also agreed to grant Sherman an easement, although the exact location of the easement was not described in the contract. The language in the contract was "Buyer to grant easement thru [sic] the 4 acres to seller for 20 feet ingress/egress and all necessary utilities to the .48 acre, the .48 acres [sic] to be located in the back portion at the 4.48 piece of property." Buyers also promised to sell back to Sherman acreage if after closing, Sherman later found he needed more land for a septic system on his 0.48 acre, specifically: "In the event that extra land is needed for drainage field lines, buyer agrees to accommodate the seller for needed footage." Immediately following the language for the sell-back provision is a handwritten and initialed statement "at an agreeable figure to both parties."

Another provision which is the subject of this appeal is Paragraph 8, which provides:

8. SOIL TESTING FOR SEPTIC SYSTEM: Buyer has been given the opportunity to obtain a soil percolation, soil morphology test or sewage system permit meeting the Health Department regulations concerning septic systems or other sewage treatment systems. Should Buyer decline to obtain any of the above, Buyer agrees to hold Seller(s) and the Listing Agent Firm and Selling Agent Firm involved in this Real Estate Contract harmless of any matters relative to obtaining such test, permit or the ability to construct an improvement on the described Property that may exist or be discovered (or occur) after closing.

Following this paragraph are three boxes labeled A, B, and C. Box B is marked, which states,

A satisfactory soil percolation or soil morphology test by a Designated Representative of the Health Department shall be conducted within 30 days prior to closing. A satisfactory soil percolation or soil morphology test does not necessarily guarantee a septic system permit will be issued in the future. Test to be provided and paid for by: [the boxed checked is Seller].

Immediately following this paragraph are the handwritten words, "sale subject to satisfactory perk test." Philliber wrote these words into paragraph 8(b) of the contract under instruction from Sherman; Sherman's initials appear after this clause.

The initial offer was dated April 22, 2004; Sherman and Buyers memorialized their agreement in a written contract. Buyers signed the contract on April 22, 2004, and Sherman signed the contract on April 29, 2004. The parties agreed on June 25, 2004, as the date of closing.

Subsequent to signing the written contract, Sherman could not obtain a satisfactory soil percolation test ("perk test"). Without a satisfactory perk test, Sherman was unable to place a septic system tank on his 0.48 acre and, without one, the land had no practical use to him. Sherman refused to close although Buyers claimed to be ready, willing, and able to close. Buyers testified that they believed that a satisfactory perk test was for their benefit, that if "something wasn't to [their] satisfaction, [they] could cancel the deal." Buyers were prepared to close without requiring a satisfactory soil perk test.

Sherman filed a quitclaim deed vesting title from him alone to himself and his wife. They then brought suit seeking a declaration that the real estate contract was void and Buyers counterclaimed for specific performance. The court declared the contract void and incapable of specific performance because a failure of the .48 acre to perk constituted a failed condition precedent of the contract to convey the 4.0 acres and because the contract was vague and ambiguous. Buyers bring this appeal from the denial of their counterclaim for specific performance.

Buyers bring four claims of trial court error: 1) in considering parol evidence when the contract was not honestly and fairly susceptible of more than one interpretation; 2) in finding the grant of the easement as vague and ambiguous because the precise location of the easement is not necessary to the grant of an easement; 3) in declaring the contract void for vagueness and ambiguity in failing to specify a location for drainage field lines or a price for the lines in that the clause created an obligation on the part of the buyers to accommodate the future need for lateral lines and on the part of the seller to pay an agreeable price for the accommodation; and 4) in refusing to grant specific performance because the contract was not vague or ambiguous and clearly contained all essential terms required for specific performance. The essence of each point is that the contract was not vague or ambiguous; however, Point I disposes of the entire appeal. In denying Buyers' first point, that parol evidence was improperly considered, we must necessarily find the contract to be vague and ambiguous. We so find.

In Point I, Buyers contend that the contract was unambiguous on its face and, therefore, the trial court erred in receiving parol evidence to vary or contradict the terms of the agreement. Buyers focus on paragraph 8(b) in their claim that the contract was unambiguous; they contend that the...

To continue reading

Request your trial
10 cases
  • Ala. Aircraft Indus., Inc. v. Boeing Co.
    • United States
    • U.S. District Court — Northern District of Alabama
    • 15 Agosto 2018
    ...Elec. Co., 622 S.W.2d 239, 247 (Mo. Ct. App. 1981)). "Whether an ambiguity exists depends on the context of the agreement." Sherman v. Deihl, 193 S.W.3d 863, 866 (Mo. Ct. App. 2006 (citing Yerington v. La-Z-Boy, Inc., 124 S.W.3d 517, 520 (Mo. Ct. App. 2004)). "A determination as to whether ......
  • Brown v. Mickelson
    • United States
    • Missouri Court of Appeals
    • 27 Marzo 2007
    ...or contradict the terms of an unambiguous, final, and complete writing, absent fraud, mistake, accident or duress.'" Sherman v. Deihl, 193 S.W.3d 863, 866 (Mo.App. S.D.2006) (quoting Building Erection Servs. Co. v. Plastic Sales Mfg. Co., 163 S.W.3d 472, 479 (Mo.App. W.D. In this case, howe......
  • Ward Hyundai, Inc. v. Zurich Am. Ins. Co.
    • United States
    • U.S. District Court — Eastern District of Missouri
    • 24 Junio 2014
    ...mistake, accident or duress." Brown v. Mickelson, 220 S.W.3d 442, 447 (Mo. App. W.D. 2007) (emphasis added) (quotingSherman v. Deihl, 193 S.W.3d 863, 866 (Mo. App. S.D. 2006)); see also Building Erection Servs. Co. v. Plastic Sales Mfg. Co., 163 S.W.3d 472, 479 (Mo. App. W.D. 2005)). As a r......
  • Finova Capital Corp. v. Ream
    • United States
    • Missouri Court of Appeals
    • 24 Julio 2007
    ...does not exclude proof that an alleged contract omits a fundamental assumption upon which the agreement is made. Sherman v. Deihl, 193 S.W.3d 863, 866 (Mo.App. S.D.2006). Where ambiguity exists, whether latent or patent, the cardinal principle is to determine the intent of the parties. Roya......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT