Sierra Club v. U.S. E.P.A.

Decision Date24 August 2007
Docket NumberNo. 06-3907.,06-3907.
Citation499 F.3d 653
PartiesSIERRA CLUB, et al., Petitioners, v. U.S. ENVIRONMENTAL PROTECTION AGENCY, Respondent, and Prairie State Generating Company, LLC, Intervenor-Respondent.
CourtU.S. Court of Appeals — Seventh Circuit

Kevin J. Finto, George P. Sibley, III, Harry M. Johnson, III (argued), Hunton & Williams, Richmond, VA, for Intervenor-Respondent.

Before POSNER, KANNE, and WILLIAMS, Circuit Judges.

POSNER, Circuit Judge.

The federal Environmental Protection Agency (actually, Illinois's counterpart to the EPA, exercising authority that the federal EPA had delegated to it, but we can ignore that detail) issued a permit to Prairie State Generating Company to build a 1,500-megawatt coal-fired electrical generating plant in southern Illinois, near St. Louis. Environmentalists asked the EPA's Environmental Appeals Board to reverse the issuance of the permit, and, the Board having refused, In re Prairie State Generating Co., No. 05-05 (EAB Aug. 24, 2006), they renew the quarrel in this court. They claim that the EPA violated two provisions of the Clean Air Act. One requires as a condition of receiving a permit that a plant or other source of air pollution be designed to have the "best available control technology" for minimizing pollution emitted by the plant. 42 U.S.C. § 7475(a)(4). The other attaches the further condition that the plant's emissions not exceed the limits imposed by the Act's national ambient air quality standards. § 7475(a)(3). The petitioners' first claim relates to the sulfur dioxide that will be produced as a byproduct of the production of electricity by Prairie State's plant, the second to the ozone that it will produce.

The plant is to be what is called a "mine-mouth" plant because it has been sited at the location of a coal seam. The seam is believed to contain 240 million tons of recoverable coal — enough to supply the plant's fuel needs for 30 years. The siting of the plant will enable the coal to be brought by a conveyor belt, more than half a mile long, from the mine to the plant. Unfortunately, this coal has a high sulfur content. To burn low-sulfur coal Prairie State would have to arrange for it to be transported from mines more than a thousand miles away and would have to make changes in the design of the plant — specifically, the design of the plant's facilities for receiving coal. The petitioners argue that the EPA must decide whether hauling low-sulfur coal from afar would be the best available means of controlling air pollution from the plant.

The Clean Air Act defines "best available control technology" as the "emission limitation" achievable by "application of production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment of innovative fuel combustion techniques." 42 U.S.C. § 7479(3). A "proposed facility" that would if built be a "major emitting facility," as the proposed Prairie State plant would be, must have "the best available control technology for each pollutant subject to regulation," § 7475(4), including sulfur dioxide. The EPA's position is that "best available control technology" does not include redesigning the plant proposed by the permit applicant ("traditionally, EPA does not require a . . . [permit] applicant to change the fundamental scope of its project," In re Old Dominion Electric Cooperative, 3 E.A.D. 779, 793 n. 38 (EPA Adm'r 1992); Environmental Protection Agency, "New Source Review Workshop Manual: Prevention of Significant Deterioration and Nonattainment Permitting" B.13 (Draft, Oct. 1990)), unless the applicant intentionally designs the plant in a way calculated to make measures for limiting the emission of pollutants ineffectual. In re Prairie State Generating Co., supra, slip op. at 30, 33-34. But that is not contended in this case. Another provision of the Act, distinct from the one requiring adoption of the best available control technology, directs the EPA to consider "alternatives" suggested by interested persons (such as the Sierra Club) to a proposed facility. 42 U.S.C. § 7475(a)(2); see, e.g., In re NE Hub Partners, L.P., 7 E.A.D. 561, 583 (EAB 1998). But that provision has not been invoked by the petitioners. Only compliance with the "BACT" (best available control technology) requirement is in issue.

The Act is explicit that "clean fuels" is one of the control methods that the EPA has to consider. Well, nuclear fuel is clean, and so the implication, one might think, is that the agency could order Prairie State to redesign its plant as a nuclear plant rather than a coal-fired one, or could order it to explore the possibility of damming the Mississippi to generate hydroelectric power, or to replace coal-fired boilers with wind turbines. That approach would invite a litigation strategy that would make seeking a permit for a new power plant a Sisyphean labor, for there would always be one more option to consider. The petitioners to their credit shy away from embracing the extreme implications of such a strategy, which would stretch the term "control technology" beyond the breaking point and collide with the "alternatives" provision of the statute. But they do not suggest another stopping point.

Now it is true that a difference between this case and our nuclear hypothetical is that a plant designed to burn coal cannot run on nuclear fuel without being redesigned from the ground up, whereas Prairie State's proposed plant could burn coal transported to the plant from afar. But to convert the design from that of a mine-mouth plant to one that burned coal obtained from a distance would require that the plant undergo significant modifications — concretely, the half-mile-long conveyor belt, and its interface with the mine and the plant, would be superfluous and instead there would have to be a rail spur and facilities for unloading coal from rail cars and feeding it into the plant. See Kathryn Heidrich, "Mine-Mouth Power Plants: Convenient Coal Not Always a Simple Solution," Coal Age, June 2003, pp. 28, 30; Richard H. McCartney, "Bringing Coal Yards Into the 21st Century," Power Engineering, July 2005, p. 36.

So it is no surprise that the EPA, consistent with our nuclear hypothetical and the petitioners' concession regarding it, distinguishes between "control technology" as a means of reducing emissions from a power plant or other source of pollution and redesigning the "proposed facility" (the plant or other source) — changing its "fundamental scope." The agency consigns the latter possibility to the "alternatives" section of the Clean Air Act, which as we said is not involved in this case. Refining the statutory definition of "control technology""production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment of innovative fuel combustion techniques" — to exclude redesign is the kind of judgment by an administrative agency to which a reviewing court should defer. Environmental Defense v. Duke Energy Corp., ___ U.S. ___, 127 S.Ct. 1423, 1434, 167 L.Ed.2d 295 (2007); New York v. EPA, 413 F.3d 3, 19-20 (D.C.Cir.2005); Alabama Power Co. v. Costle, 636 F.2d 323, 397-98 (D.C.Cir.1979).

But this opens the further and crucial question where control technology ends and a redesign of the "proposed facility" begins. As it is not obvious where to draw that line either, it makes sense to let the EPA, the author of the underlying distinction, draw it, within reason.

Suppose this were not to be a mine-mouth plant but Prairie State had a contract to buy high-sulfur coal from a remote mine yet could burn low-sulfur coal as the fuel source instead. Some adjustment in the design of the plant would be necessary in order to change the fuel source from high-sulfur to low-sulfur coal, Brian Schimmoller, "Western Coal Pushes East," Power Engineering, Aug. 1999, http://pepei. pennnet.com/articles/arti...

To continue reading

Request your trial
17 cases
  • US v. Alabama Power Co.
    • United States
    • U.S. District Court — Northern District of Alabama
    • July 24, 2008
    ... ... (Doc. 175). EPA filed a Motion to Clarify the Final Judgment Order. (Doc. 176). APC opposed the Motion. (Doc. 177) ... Finding BACT to be required would not necessarily be the end of the matter, see, e.g., Sierra Club v. EPA, 499 F.3d 653 (7th Cir. 2007) (Act was not violated by EPA permit issuance to ... ...
  • Sierra Club v. Moser
    • United States
    • Kansas Supreme Court
    • October 4, 2013
    ...Area Permitting, p. B.13 [1990] ). The EPA's interpretation has been repeatedly upheld in litigation. E.g., Sierra Club v. United States E.P.A., 499 F.3d 653, 654 (7th Cir.2007) (accepting EPA's interpretation that BACT “does not include redesigning the plant proposed by the permit applican......
  • Town of Weymouth v. Mass. Dep't of Envtl. Prot.
    • United States
    • U.S. Court of Appeals — First Circuit
    • June 3, 2020
  • Util. Air Regulatory Grp. v. Envtl. Prot. Agency
    • United States
    • U.S. Supreme Court
    • June 23, 2014
    ...therefore, it has long been held that BACT cannot be used to order a fundamental redesign of the facility. See, e.g., Sierra Club v. EPA, 499 F.3d 653, 654–655 (C.A.7 2007) ; In re Pennsauken Cty., N. J., Resource Recovery Facility, 2 E.A.D. 667, 673, 1988 WL 249035 (EAB 1988). For another,......
  • Request a trial to view additional results
7 books & journal articles
  • Black Carbon
    • United States
    • Legal pathways to deep decarbonization in the United States Part VIII - Non-Carbon Dioxide Climate Pollutants
    • March 24, 2019
    ...common-law public nuisance claims). 342. CAA §169(3), 42 U.S.C. §7479(3). 343. See , e.g. , Sierra Club v. Environmental Prot. Agency, 499 F.3d 653 (7th Cir. 2007); Helping Hand Tools v. Environmental Prot. Agency, 848 F.3d 1185 (9th Cir. 2016). 344. See Nash & Revesz, supra note 12 (discus......
  • Controlling Global Climate Change
    • United States
    • Air pollution control and climate change mitigation law
    • August 18, 2010
    ...Generating Company, PSD Appeal No. 05-05 (EAB Aug. 24, 2006), available at http://www.epa.gov/ eab (last visited Feb. 28, 2009). 675. 499 F.3d 653 (7th Cir. 2007). 676. No. 2008CV 146398 (Sup. Ct. Fulton County, Ga. June 30, 2008). 677. Georgia Appeals Court Will Review Ruling Requiring CO2......
  • Preconstruction Permits: New Source Performance Standards and New Source Review
    • United States
    • Air pollution control and climate change mitigation law
    • August 18, 2010
    ...kilometers (62 miles) of Class I area facilities, which are presumed to have an adverse impact on air quality-related values unless 172. 499 F.3d 653 (7th Cir. 2007). 173. See generally Arnold W. Reitze Jr., Federal Control of Carbon Dioxide Emissions: What Are the Options? , 36 B.C. Envtl.......
  • Here Be Dragons: Legal Threats to EPA's Proposed Existing Source Performance Standards for Electric Generating Units
    • United States
    • Environmental Law Reporter No. 45-2, February 2015
    • February 1, 2015
    ...therefore, it has long been held that BACT cannot be used to order a fundamental redesign of the facility. See, e.g. Sierra Club v. EPA , 499 F. 3d 653, 654-655 (CA7 2007); . . . . For another, EPA has long interpreted BACT as required only for pollutants that the source itself emits, see 4......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT