St. Louis Southwestern Ry. Co. v. Pierce, 94-3973

Decision Date08 December 1995
Docket NumberNo. 94-3973,94-3973
Citation68 F.3d 276
PartiesST. LOUIS SOUTHWESTERN RAILWAY COMPANY, Plaintiff-Appellee, v. Austin Ray PIERCE, Intervenor-Plaintiff Appellee, v. William L. ROBINSON, Defendant, Triple B Wood Dealer, a partnership composed of: Troy Bradley and Larry Bradley; Troy Bradley, Sole Proprietor of Bradley Pulpwood Contractors, doing business as Bradley Pulpwood Contractors, Defendants-Appellants. TRIPLE B WOOD DEALER, a partnership composed of: Larry Bradley and Troy Bradley, Counter-Claimant, v. ST. LOUIS SOUTHWESTERN RAILWAY COMPANY, Counter-Defendant, Bradley Pulpwood Contractors; Southern Pacific Transportation Company, Defendants. Worthen National Bank of Northwest Arkansas, Garnishee, Simmons First National Bank, Garnishee.
CourtU.S. Court of Appeals — Eighth Circuit

Wiliam David Duke, argued, Little Rock, Arkansas (Gary M. Draper and Sandra C. Bradshaw, on the brief), for appellant.

Jerome Joseph Schlichter, argued, St. Louis, Missouri (Steven L. Groves, on the brief), for appellee Pierce.

John Gardner Lile III, argued, Little Rock, Arkansas (Troy A. Price, on the brief), for St. Louis Railway.

Before BOWMAN, Circuit Judge, HEANEY, Senior Circuit Judge, and KYLE, * District Judge.

KYLE, District Judge.

On June 4, 1992, a truck and lowboy semitrailer, owned and operated by Appellants, became lodged at and on a railroad crossing in Kingsland, Arkansas. The crossing is located within a curve on the railroad track and is banked; that is, it is uneven--with one track being several inches higher than the other. This particular crossing is posted to warn motorists that the tracks are uneven. Appellants were aware that the crossing was uneven, knew that the lowboy semitrailer, which was loaded with a bulldozer, had minimal clearance for the crossing, and considered an alternative route to avoid crossing the track at this location. In an attempt to minimize the risk of crossing, Appellants' employees left the truck to observe the lowboy attempt the crossing. Believing that there was sufficient clearance, the lowboy progressed to a point where it "hung" on one of the tracks. Attempts to dislodge the lowboy by pushing and rocking the truck and tractor across the track were futile. While these efforts were underway, a train was heard approaching the crossing. Efforts to warn the train of the situation and to move the truck (and trailer) off the track, were unavailing; a collision occurred. The train, the truck, trailer, and tractor, as well as the train's engineer, sustained injuries. This litigation followed.

The St. Louis Southwestern Railway Company ("Railway") initiated this action against Appellants seeking monetary damages for its derailed train and damaged track. Appellants denied any negligence on their part and interposed a counterclaim seeking monetary damages to their own trailer and equipment. The locomotive engineer intervened and asserted claims under the Federal Employer's Liability Act (FELA) against the Railway and for negligence against Appellants.

The matter was tried to a jury which returned a verdict against Appellants and in favor of the locomotive engineer in the amount of $925,000 for personal injuries and in favor of the Railway in the amount of $250,000 for property damage. The jury also found in favor of the Railway on the engineer's FELA claims. This appeal followed; for the reasons hereinafter set forth, we affirm.

Appellants raise several issues on appeal, only two of which require discussion in this Opinion:

I. The Arkansas Heavy Equipment Statute.

The statute at issue provides:

27-51-705 Moving heavy equipment at crossings

(a) No person shall operate or move any crawler-type tractor, steam shovel, derrick, roller, or any equipment or structure having a normal operating speed of up to ten (10) miles per hour or a vertical body or load clearance of less than one-half inch ( 1/2"') per foot of the distance between any two adjacent axles, or, in any event, of less than nine inches (9"') measured above the level surface of a roadway, upon or across any tracks at a railroad grade crossing without first complying with this section.

(b) Notice of any intended crossing shall be given to a station agent of the railroad, and a reasonable time shall be given to the railroad to provide protection at the crossing.

Over the timely objection of Appellants, the District Court 1 instructed the jury regarding the statute, advising them that "a violation of the statute, although not necessarily negligence, is evidence of negligence to be considered by you along with all of the other facts and circumstances of this case." Asserting that such an instruction was outcome determinative, Appellants urge us to reverse the jury's verdict and remand for a new trial.

Appellants argue here, as they did below, that the statute was not applicable to the case because they were operating a legally licensed tractor-trailer and the statute is aimed at the movement of "crawler-type tractors" and other non-licensed equipment. We have reviewed the statute, its legislative history and those cases which have construed it; we conclude that the District Court properly submitted the matter to the jury. In our view, the language of the statute is plain and unambiguous--"any equipment" means, certainly in the context of the case involving a truck and lowboy semitrailer, just what it says--"any equipment"--and the lowboy semitrailer involved here comes within that broad definition. We find it unnecessary to employ maxims of construction (ejusdem generis, expressio unius est exclusio alterius ) as Appellants ur...

To continue reading

Request your trial
19 cases
  • Hightower v. Kansas City Southern Ry. Co.
    • United States
    • Oklahoma Supreme Court
    • 6 May 2003
    ...railroad's internal policies regarding speed" do not constitute a specific, individual hazard. Id.; See also St. Louis Southwestern Ry. Co. v. Pierce, 68 F.3d 276 (8th Cir.1995) (holding that despite railroad's violation of its self-imposed speed limit, which was lower than federal law, the......
  • Seyler v. Burlington Northern Santa Fe Corp.
    • United States
    • U.S. District Court — District of Kansas
    • 31 May 2000
    ...result. Claims based on a railroad's failure to obey a self-imposed speed limit are preempted by FRSA. See St. Louis Southwestern Ry. Co. v. Pierce, 68 F.3d 276, 278 (8th Cir.1995); see also Bowman v. Norfolk Southern Ry. Co., 832 F.Supp. 1014, 1017 (D.S.C.1993) (evidence of railroad's inte......
  • Mehl v. Canadian Pacific Ry., Ltd.
    • United States
    • U.S. District Court — District of North Dakota
    • 6 March 2006
    ...speed of the train in question was above the railroad's self-imposed speed limit and below the FRSA's speed limit. St. Louis Sw. Ry. Co. v. Pierce, 68 F.3d 276 (8th Cir.1995). Most recently, and particularly relevant to the case before the Court, the Eighth Circuit held that negligent inspe......
  • Marsh v. Norfolk S., Inc.
    • United States
    • U.S. District Court — Middle District of Pennsylvania
    • 20 March 2017
    ...regulations may be evidence of negligence in state court, such regulations are preempted by federal law"); St. Louis Sw. Ry. Co. v. Pierce , 68 F.3d 276, 278 (8th Cir. 1995).Even assuming that Plaintiff's claim survives a preemption defense, and, if, indeed, Boyd violated the internal regul......