Thomas v. Express Boat Co., Inc.

Decision Date02 May 1985
Docket NumberI,No. 84-3110,No. 16,16,84-3110
Citation759 F.2d 444
PartiesLance D. THOMAS, Jr., Plaintiff-Appellant, v. EXPRESS BOAT COMPANY, INC. Cheramie Botrucnc., Defendants-Third-Party Plaintiffs-Appellees, v. PENROD DRILLING COMPANY, Third-Party Defendant-Appellant. Summary Calendar.
CourtU.S. Court of Appeals — Fifth Circuit

Simon, Peragine, Smith & Redfearn, Daniel J. Caruso, Kenneth R. Bowen, New Orleans, La., for appellants.

Porteous, Toledano, Hainkel & Johnson, William A. Porteous, III, Glenn B. Adams, New Orleans, La., for defendants-third-party plaintiffs-appellees.

Appeal from the United States District Court for the Eastern District of Louisiana.

Before GEE, JOHNSON and DAVIS, Circuit Judges.

JOHNSON, Circuit Judge.

Lance D. Thomas and Penrod Drilling Company appeal from the judgment in this admiralty case in which Thomas sought compensation for an injury to his right hand which resulted in the subsequent amputation of his hand. The jury found Express Boat, Thomas' employer, liable to Thomas for $370,000 as a result of its negligence which proximately caused the injury. On appeal, Thomas asserts that this award is insufficient. Express Boat brought a third-party claim against Penrod, seeking contribution. That claim was tried to the court, and the district court allocated one-third of the responsibility for the accident to Penrod. On appeal, Penrod asserts that the evidence is insufficient to support the district court's conclusion that Penrod was negligent and that it was one-third responsible for Thomas' injury. This Court concludes (1) that the evidence is sufficient to support the finding of liability against Penrod, and (2) that the jury's award of $370,000 is not insufficient. Consequently, the judgment of the district court is affirmed.

I. BACKGROUND
A. Facts

At the time of the accident, Thomas was employed by Express Boat Company, Inc., (Express Boat) as an engineer aboard the supply vessel CHERAMIE BO-TRUC NO. 16, (BOTRUC 16), which was owned by Cheramie Botruc 16, Inc., and operated by Express Boat. Thomas was injured while the BOTRUC 16 was being secured to The Penrod 82, an offshore drilling rig in the Gulf of Mexico, which was owned and operated by Penrod Drilling Company (Penrod). Thomas' injury resulted when Thomas' hand got caught and crushed in the mooring line.

The BOTRUC 16 had proceeded to the Penrod 82 that night to deliver urgently needed supplies. The BOTRUC 16 arrived at the Penrod 82 shortly after midnight on November 10, 1979. Captain Peterson, the master of the BOTRUC 16, did not want to tie up to the rig due to the darkness and the sea conditions, which included six to eight foot waves, a strong current, and winds of twenty knots. Captain Peterson would have anchored nearby until weather conditions improved. However, personnel on the Penrod 82 vigorously insisted that Captain Peterson at least unload a single tool which they needed, a Schlumberger tool which was packaged in its own sling.

Captain Peterson ordered his crew, including Thomas, to secure the BOTRUC 16 to the Penrod 82 using a mooring line provided by the Penrod 82. Captain Peterson maneuvered the BOTRUC 16 during the docking operations while Thomas and two other crew members performed deck docking duties. The weather was deteriorating, and due to the sea conditions and the placement of the anchor, Captain Peterson had difficulty backing and maneuvering the BOTRUC 16 to the rig in order to receive the mooring line from the rig. Nevertheless, the vessel did successfully tie up to the rig.

After the initial securing of the line, the personnel aboard the Penrod 82 observed a worn spot in the line about six feet from the BOTRUC 16. The rig personnel insisted that Captain Peterson bring the worn spot in the mooring line onto the BOTRUC 16 before they would participate in unloading the tool. Captain Peterson then ordered Thomas and the other two crew members to bring the worn spot onto the vessel by working the line around the bitt and through the knot while Peterson maneuvered the BOTRUC 16 in reverse to attempt to put slack into the line. It was Thomas' job to work the line through the knot while the other two crew members pulled in the slack.

Even though the other two crew members were able to pull slack onto the boat, Thomas was unable to pull the slack through the knot due to the fact that the knot at the point where it binds down on itself had welded (stuck) together. At the instant Thomas was able to pull the rope apart at the weld, the BOTRUC 16 unexpectedly fell off a ground swell causing the slack to go instantaneously out of the line. Thomas' right hand was pulled into the knot, and his hand was severely injured. The worn portion of the line was eventually pulled onto the BOTRUC 16 by the other two crew members. During that time, the line held fast despite the fray. Thomas' hand was subsequently amputated as a result of his injury.

B. Procedural History

Thomas sued Express Boat Co., the BOTRUC 16, and Penrod Drilling Company. Prior to trial, Thomas settled his claim against Penrod. Thomas' claims against Express Boat and the BOTRUC 16 were then tried to a jury. Express Boat and the BOTRUC 16 asserted a third-party claim against Penrod for contribution. The district court severed the third-party claim from the jury trial portion of the case, and that claim was tried to the court. As part of the compromise between Thomas and Penrod, Thomas assumed Penrod's defense. The case was tried, and the jury returned a verdict in favor of Thomas and against Express Boat. The jury found that Express Boat was negligent, but that the BOTRUC 16 was not unseaworthy. The jury returned a verdict specifying a lump sum award of $370,000.

The district court separately decided the third party claim, concluding that Penrod was negligent and allocating one-third of the responsibility for the accident to Penrod. That finding had the effect of reducing Thomas' award by one-third. In its conclusions of law, the district court held that Penrod was negligent because it provided a frayed mooring line to the BOTRUC 16. The district court found that the line was weakened by the fray, even though the line was three-strand nylon line. Although the court concluded that the fray was not readily observable to the crew of the BOTRUC 16 because it was nighttime and the sea was heavy, the court also concluded that the hazard was obvious to the crew of the Penrod 82. The court concluded that the frayed line coupled with Penrod's crew's insistance that the vessel dock, posed an unreasonable risk of harm to the crew of the BOTRUC 16, and that presenting the line to the crew of the BOTRUC 16 was negligence. The district court also found that Penrod's negligence was a substantial factor in causing Thomas' injury. The district court apportioned fault as follows: one-third to Penrod; two-thirds to Express Boat.

Penrod appeals the conclusions of the district court that it was negligent and that its negligence was a cause of the accident, arguing that the evidence does not support the district court's conclusions. Thomas also appeals, arguing that the jury's award was insufficient. For the reasons stated below, the judgment of the district court is affirmed.

II. DISCUSSION
A. Sufficiency of the Evidence Against Penrod

Thomas and Penrod challenge the district court's findings that Penrod was negligent and that its negligence was a legal cause of Thomas' injuries. The "clearly erroneous" standard of Fed.R.Civ.P. 52(a) applies to both of these findings. Landry v. Oceanic Contractors, Inc., 731 F.2d 299, 302 (5th Cir.1984); Allied Chemical Corp. v. Hess Tankship Co., 661 F.2d 1044, 1050 (5th Cir.1981). The clearly erroneous standard also applies to the district court's apportionment of the blame, which this Court will not overturn if it appears "at least roughly correct." Flowers Transportation, Inc. v. M/V PEANUT HOLLINGER, 664 F.2d 112, 114 (5th Cir.1981); see Allied Chemical, 661 F.2d at 1057; Valley Towing Service, Inc. v. S/S AMERICAN WHEAT, 618 F.2d 341, 346 (5th Cir.1980).

Appellants rely heavily upon the expert testimony of Captain Kleinpeter, which appellants claim to have been uncontradicted, for the proposition that presenting the frayed line was not negligence. Kleinpeter testified that nylon line such as that provided by Penrod is the best type of line available. He added that a nylon line with one of its three strands broken would still be more secure than a hemp line. In his opinion, the fraying did not "pose a big problem," and once the line had held for a few minutes it was unlikely to break. Kleinpeter also testified that Captain Peterson erred by using a "quick-tie" knot because, although such a knot is easy to tie, it is difficult to untie and thus is unsafe in heavy seas. 1

Nevertheless, the district court did not clearly err when it found that Penrod was negligent. Captain Peterson testified that a fray weakens a line and that a broken nylon line "[a]cts like a rubber band" and is a severe hazard. 2 Captain Kleinpeter testified that he would not tie up with a line that was frayed one-third of the way through as was Penrod's line. 3 Furthermore, because of the sea conditions, the BOTRUC 16's crew could not tell for certain what shape the line was in; they thought it might be frayed halfway through. 4 Although they were hesitant to bring in the fray, "there were eight to 12 people on the hand railing [of the rig], hollering, pointing, and just carrying on, making a ruckus." In fact, Peterson added that rig personnel would...

To continue reading

Request your trial
36 cases
  • SCF Waxler Marine LLC v. M/V Aris T
    • United States
    • U.S. District Court — Eastern District of Louisiana
    • 19 Noviembre 2019
    ...is something more than ‘but for’ causation, and the negligence must be a ‘substantial factor’ in the injury." Thomas v. Express Boat Co. , 759 F.2d 444, 448 (5th Cir. 1985) (citations omitted). The term "substantial factor" means more than "but for the negligence, the harm would not have re......
  • In re Complaint of Ensco Offshore Co.
    • United States
    • U.S. District Court — Southern District of Texas
    • 26 Marzo 2014
    ...and (4) that the defendant's conduct was the actual and proximate cause of the plaintiff's injury.), citing Thomas v. Express Boat Co., 759 F.2d 444, 448 (5th Cir.1985). Proximate cause is more than “but for” causation; “the negligence must be a ‘substantial factor’ in the injury.” Thomas, ......
  • La. v. Rowan Companies Inc.
    • United States
    • U.S. District Court — Southern District of Texas
    • 28 Julio 2010
    ...and proximate cause of plaintiff's injury. In Re: Cooper / T. Smith, 929 F.2d 1073, 1077 (5th Cir.1991) (citing Thomas v. Express Boat Co., 759 F.2d 444, 448 (5th Cir.1985)). Actual cause is "but for" causation. Thomas, 759 F.2d at 448. To establish proximate cause, the plaintiff must prove......
  • Tidewater Marine, Inc. v. Sanco Intern., Inc.
    • United States
    • U.S. District Court — Eastern District of Louisiana
    • 24 Julio 2000
    ...(5th Cir.1978). "Legal cause is something more than `but for' causation." Donaghey, 974 F.2d at 648 (quoting Thomas v. Express Boat Co., Inc., 759 F.2d 444, 448 (5th Cir.1985) (citations omitted)). A defendant's negligence must be a "substantial factor" in causing the injury. Id. The term "......
  • Request a trial to view additional results

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT