STAFFORD, Associate Justice.

The jury returned a verdict for defendant Corporation of Catholic Archbishop of Seattle in a personal injury action brought by Mr. and Mrs. Hall. The Halls appeal. For convenience, Mrs. Hall will be referred to as the sole plaintiff.

Plaintiff was a long-time member of the Holy Rosary Catholic Church. After attending mass on Sunday, March 12, 1967, she stood at the top of the stairway at the main entrance to the church, mingling with other parishioners who were either departing or arriving for the next mass.

As she began to descend the stairway at a point approximately midway between its lateral extremities, plaintiff fell. She remembers falling, but does not remember what caused her to fall. There is no evidence that there was either foreign matter or debris on the stairs at the time. Plaintiff testified:

I started tumbling, going over. I reached out to try to grab something or someone . . . There was nothing to catch onto, nothing to break the fall . . .

As a result of the fall, she suffered bodily injuries.

At the time of the accident the main stairway of the church was 134 inches wide. The steps had a rise, I.e., height, of 5 1/2 inches and a run, I.e., tread, of 12 inches. A handrail was attached to the side of the building and a masonry balustrade was located on the opposite side, next to the street. There was no intermediate handrail.

The Seattle building code requirement, as set out in instruction No. 5, provides, insofar as pertinent:

all stairways, Except monumental entrances with rise and run approved as to safety by the Superintendent of Buildings, shall have walls or well-secured balustrades or guards on each side, and handrails shall be placed on both sides of all stairways over three feet wide. All such stairways eighty-eight (88) inches or more in width shall be provided with one (1) or more continuous intermediate handrails, substantially supported, and the number and position of intermediate handrails shall be such that there are not more than sixty-six (66) inches between adjacent handrails.

(Italics ours.)

Plaintiff alleged that defendant had been negligent (1) in failing to provide handrails as required by the Seattle building code; and (2) in failing to exercise reasonable care under the circumstances. Defendant entered a general denial and affirmatively pleaded as a defense 'contributory negligence' and 'assumption of a known dangerous condition.'

Following a defense verdict plaintiff moved, unsuccessfully, for a judgment n.o.v. and for a new trial. She now appeals.

First, plaintiff assigns error to the trial court's having permitted an architect to testify, as an expert, to the 'customary and accepted definition for mounmental stairs . . .' The term 'monumental' is not defined in the building code. The architect stated, over plaintiff's objection, that:

Monumental stairs are stairs that are designed for ornamental purposes as against utility stairs which are required (for) circulation.

Now, monumental stairs are used for circulation as well. They are normally provided at main entrances or within the building where you want to have an easier grade than is permitted by code.

Assuming the trial court erred by permitting such testimony, the assignment of error is not well taken. Plaintiff proposed, and the trial court gave, an instruction which reads in pertinent part: 'You are further instructed that 'monumental' is defined as 'ornamental." Since there is no material difference between the definition given by defendant's expert witness and the one in plaintiff's own instruction, the error, if any, was harmless.

Plaintiff complains that, over her continued objection, the trial court permitted the same witness to opine that the steps at the IBM Building and the Seattle Public Library are 'monumental stairways' and to imply that since there are no intermediate handrails the superintendent of buildings must have approved the stairways' rise and run as to safety, thereby eliminating the need for intermediate handrails otherwise required by the building code. Such testimony was admitted despite the expert's concession that in the case of 'monumental entrances', which require the superintendent of buildings to approve the safety of a stairway's rise and run if intermediate handrails are to be eliminated, he did not know whether the city had a formula for such rise and run, even under his own definition of 'monumental stairs'.

Plaintiff argues that these opinions, taken as a whole, created an unwarranted inference that the stairways of the IBM Building and the Seattle Public Library are 'monumental stairways' under the code. It created the further unwarranted inference that since neither had intermediate handrails, the superintendent of buildings must have approved the stairways' rise and run as to safety.

Plaintiff also complains that, over continued objection, the expert was permitted to opine that the main entrance of the Holy Rosary Church was 'monumental'. Admittedly the church was built in an earlier era. There is little question, however, that the cumulative effect of the challenged opinion testimony was to invite the jury to draw an unwarranted inference that the superintendent of buildings would have deemed defendant's steps a 'monumental stairway' and having (by pure inference) approved the rise and run of the IBM Building and library stairways, he would also (be pure inference) have approved the rise and run of the church's stairway as to safety, thus negating the intermediate railing requirement.

The assignment of error raises a serious problem. Under the Seattle building code All stairways 88 inches or more in width must have intermediate handrails not more than 66 inches apart. There is one exception:

except monumental entrances With rise and run approved as to safety by the Superintendent of Buildings . . .

(Italics ours.) Thus, the central issue is, assuming the defendant's stairway actually is 'monumental', does the stairway come within the exception by having a rise and run approved as to safety by the superintendent of buildings? Evidence that in some expert's Opinion the superintendent of buildings would have approved, as to safety, the rise and run of a certain type of steps, is not relevant. This is particularly true where, as here, the expert concedes he did not know whether the city had a formula for the rise and run of 'monumental stairs'. The issue is one of fact, not a matter of opinion. Either the superintendent of buildings approved for safety the rise and run of the type of steps involved or he did not. The testimony's lack of relevance cannot be further dignified by building inference upon inference, as was done here.

The assignment of error is well taken.

Another matter must be discussed in light of the impending new trial.

Defendant suggests the foregoing testimony of its architect was offered to establish that the rise and run of the steps in question were excepted from the general provisions of the ordinance. The brief states in part:

From this testimony, the trier of fact could find that the stairs in question would be accepted as to rise and run by the Superintendent of Buildings to meet the monumental requirements.

That being the case, the question arises as to who has the burden of proving whether one is within or without the exception.

It is a well settled rule of statutory construction that exceptions to legislative enactments must be strictly construed. Schlemmer v. Buffalo R. & P. Ry., 205 U.S. 1, 27 S.Ct. 407, 51 L.Ed. 681 (1907); Canadian Pac. Ry. v. United States, 73 F.2d 831 (9th Cir. 1934); State v. Christensen, 18 Wash.2d 7, 137 P.2d 512 (1943); Winfield v. Board of County Comm'rs., 205 Kan. 333, 469 P.2d 424 (1970); Emporia v. Williams, 149 Kan. 860, 89...

To continue reading

Request your trial
27 cases
  • State v. Williams
    • United States
    • Washington Supreme Court
    • October 9, 1980
    ...legislative intention underlying the general statute. State v. Wright, supra at 652, 529 P.2d 453; Hall v. Corporation of Catholic Archbishop, 80 Wash.2d 797, 801, 498 P.2d 844 (1972). Thus, RCW 9.73.030(2)(b) must be interpreted as exempting from the act only communications or conversation......
  • Koker v. Armstrong Cork, Inc.
    • United States
    • Washington Court of Appeals
    • February 4, 1991
    ...for a lost chance of survival of which there was no proof. Instruction 17 is unrelated. As stated in Hall v. Corporation of Catholic Archbishop, 80 Wash.2d 797, 804, 498 P.2d 844 (1972): [W]e have held consistently that it is prejudicial error to give irreconcilable instructions upon a mate......
  • Mattson v. American Petroleum Environmental Services, Inc.
    • United States
    • Washington Court of Appeals
    • June 17, 2014
    ...to evaluate the products liability claim, the Galvan court held that the trial court gave inconsistent and prejudicial instructions. In Hall, a negligence and negligence per se suit, trial court instructed the jury that the breach of a statute was negligence, and instructed it that negligen......
  • Sherry v. Asing
    • United States
    • Hawaii Supreme Court
    • February 5, 1975
    ...inappropriate, and only tended to mislead and confuse the jury. Borowsky v. Hon. R. T. Co., supra; Hall v. Corporation of Catholic Archbishop of Seattle, 80 Wash.2d 797, 498 P.2d 844 (1972); Metropolitan Life Ins. Co. v. Alterovitz, 214 Ind. 186, 14 N.E.2d 570 The trial court properly refus......