KELLEY v. IANTOSCA

Decision Date21 October 2010
Docket NumberNo. 09-P-1116.,09-P-1116.
Citation78 Mass.App.Ct. 147,935 N.E.2d 783
PartiesWilliam H. KELLEY, Jr. v. Joseph IANTOSCA & others.
CourtAppeals Court of Massachusetts

OPINION TEXT STARTS HERE

COPYRIGHT MATERIAL OMITTED.

Michael J. Lombardi, Boston, for the plaintiff.

Thomas O. Moriarty, for Joseph Iantosca & another.

Ernest J. Palazzolo, Jr., for Liberty Mutual Fire Insurance Co.

Present: RAPOZA, C.J., McHUGH, & GRAHAM, JJ.

McHUGH, J.

In March, 1973, the plaintiff, William H. Kelley, Jr., and his wife, Mary Ann Kelley, bought a house from the defendant, Belair Construction Co., Inc. (Belair). Joseph Iantosca, also a defendant, was Belair's president. In 2006, cracks began to appear in the foundation of the house. After an investigation showed that the cracks were caused by the builder's use of improper subsurface fill, Kelley brought suit against Belair and Iantosca to recover repair costs. Kelley also named Liberty Mutual Fire Insurance Co. (Liberty) as a defendant, claiming that the foundation damage was covered by a homeowners insurance policy Liberty had issued. Part of Kelley's action was dismissed a motion filed pursuant to Mass.R.Civ.P. 12(b)(6), 365 Mass. 754 (1974), and the remainder was dismissed on motions for summary judgment. Kelley appeals. We affirm in part and reverse in part.

Background. When the complaint and the summary judgment record are read with the requisite indulgence, 3 it appears that in the early 1970s, Iantosca was a land developer and the president of Belair. On June 30, 1972, Belair entered a purchase and sale agreement (agreement) with Kelley and his wife under which it was to build and sell to the Kelleys a house on a lot in Braintree conforming to specifications attached to the agreement. Iantosca signed the agreement as president of Belair. Belair built the house and, after the Kelleys paid the agreed price, gave them a deed dated March 5, 1973.

One of the specifications in the agreement required Belair to remove from the site all trees that interfered with “construction of the dwelling, sewer, driveway and utility connections.” Instead of removing at least some of the stumps and limbs of those trees, however, Belair buried them among some boulders on the site and then poured the foundation over the mixture. Over time, the organic materials beneath the foundation began to rot, and as a consequence, the foundation began to settle unevenly, cracking in the process.

Kelley first noticed the cracks in 2002 and hired a company with expertise in such matters to investigate. The investigation yielded a report dated February 17, 2002, stating, in essence, that the house was settling and cracking because the foundation had been built on unsuitable materials such as trees and other biodegradable matter, that further settling and cracking could be expected unless intervention occurred, and that the intervention could take a variety of forms, all of which would involve significant expense.

After receiving and digesting the report, and after unsuccessfully seeking Liberty's payment of the repair costs, Kelley brought suit against Iantosca, Belair, and Liberty on January 12, 2006. The complaint contains five counts, four naming Iantosca and Belair as defendants and the fifth naming Liberty. Insofar as Iantosca and Belair are concerned, Count I alleged breach of contract, Count II alleged misrepresentation, Count III alleged negligence, and Count IV alleged violation of G.L. c. 93A, the statute prohibiting unfair and deceptive practices in the conduct of a trade or business. The final count alleged that Liberty's refusal to acknowledge coverage for the problem amounted an unfair insurance settlement practice prohibited by G.L. c. 176D.

Belair and Iantosca moved to dismiss the complaint pursuant to Mass.R.Civ.P. 12(b)(6). A judge of the Superior Court allowed the motion in part and denied it in part for reasons that will be described as we progress. Later, a different Superior Court judge ordered entry of summary judgment dismissing what was left of the case.

Discussion. We review the allowance of a motion under Mass.R.Civ.P. 12(b)(6), and the allowance of a motion for summary judgment, de novo. Curtis v. Herb Chambers I-95, Inc., 75 Mass.App.Ct. 662, 666, 915 N.E.2d 1121 (2009), S.C., 455 Mass. 1108, 920 N.E.2d 877 (2010) (rule 12[b] [6] ); Tompson v. Department of Mental Health, 76 Mass.App.Ct. 586, 592, 924 N.E.2d 747 (2010) (summary judgment). Our review persuades us that considerable portions of the complaint were properly dismissed but that several of the claims require further exploration in the Superior Court.

[1] 1. Claims for misrepresentation and negligence. As noted, Count II of the complaint alleges misrepresentation against Iantosca and Belair, and Count III alleges that the house had been constructed negligently. The judge allowed Iantosca's and Belair's motion to dismiss both counts, finding that the misrepresentations had not been pleaded with the specificity required by Mass.R.Civ.P. 9(b), 365 Mass. 751 (1974), and that the negligence claim merely “duplicated” the claim for breach of contract.

[2] We think both claims were properly dismissed, although for different reasons. See Hawthorne's, Inc. v. Warrenton Realty, Inc., 414 Mass. 200, 210 n. 6, 606 N.E.2d 908 (1993). The negligence claim is barred by the statute of repose contained in G.L. c. 260, § 2B, which requires commencement of a tort claim for damages arising out of design or construction of a building within six years from the time the building was substantially completed. 4 The statutory six-year period is absolute and is not extended by virtue of the “discovery rule” applicable in other contexts. See Sullivan v. Iantosca, 409 Mass. 796, 798, 569 N.E.2d 822 (1991).

[3] The misrepresentation claim is not necessarily governed by G.L. c. 260, § 2B, see id. at 799, 569 N.E.2d 822, but as Iantosca and Belair argued in the Superior Court, the claim is subject to the general three-year statute of limitations for commencement of tort actions. See G.L. c. 260, § 2A. The three-year period is subject to the discovery rule, see Patsos v. First Albany Corp., 433 Mass. 323, 328, 741 N.E.2d 841 (2001), but the record in this case shows unequivocally that Kelley was on notice of these defendants' alleged misrepresentations no later than February 17, 2002, when he received the report of subsurface deficiencies. Nevertheless, he did not commence this action until January 12, 2006, more than three years later.

2. Claim for breach of contract. The first Superior Court judge dismissed the contract claim against Iantosca individually on the ground that the relevant contract was between Belair and Kelley, not between Iantosca and Kelley. Kelley does not dispute that portion of the disposition.

[4] The second Superior Court judge allowed summary judgment on the claim against Belair on the ground that any contractual obligation Belair may have undertaken was merged in the deed Kelley accepted from Belair after construction was finished. In so ruling, the judge, no doubt guided by Belair's arguments, pointed to an express provision of the purchase and sale agreement stating that [t]he acceptance of a deed by the Buyer shall be deemed to be a full performance and discharge hereof.” 5

The quoted sentence, however, is the last sentence in a section of the purchase and sale agreement entitled “DEFECT IN TITLE,” the remainder of which reads as follows:

“Either party may have sixty (60) days to cure any defect found in the title. If the Seller shall be unable to give title or make conveyance as stipulated, any payments made under this Agreement shall be refunded, and all other obligations of either party hereunto shall cease.”

Context, therefore, suggests that acceptance of a deed acknowledges the buyer's satisfaction with title, not his satisfaction with construction.

Reading the sentence in that limited fashion is consistent with decided cases, of which McMahon v. M & D Builders, Inc., 360 Mass. 54, 271 N.E.2d 649 (1971) ( McMahon ), is a leading example. In that case, the same sentence appeared in the same context in a purchase and sale agreement for land and a house the seller was to build. Id. at 59, 271 N.E.2d 649. The court held that the sentence applied only to defects in title and did not bar an action to rescind the agreement because of alleged oral misrepresentations about the quality of materials used to build the house. Id. at 60, 271 N.E.2d 649.

In reaching its decision, the court relied on three earlier decisions, Pybus v. Grasso, 317 Mass. 716, 59 N.E.2d 289 (1945) ( Pybus ); Lipson v. Southgate Park Corp., 345 Mass. 621, 189 N.E.2d 191 (1963) ( Lipson ); and Holihan v. Rabenius Builders, Inc., 355 Mass. 639, 246 N.E.2d 638 (1969) ( Holihan ), all of which offer guidance for this case as well.

McMahon, supra at 59-60, 271 N.E.2d 649. In Pybus, the court quoted the Restatement of Contracts § 413 (1932) for what it characterized as the general rule that [t]he acceptance of a deed of conveyance of land from one who has previously contracted to sell it, discharges the contractual duties of the seller to the party so accepting except such as are embodied in the deed.” 317 Mass. at 717, 59 N.E.2d 289. The court went on to note, however, that there is an exception to the general rule “to the effect that promises in the original agreement which are additional or collateral to the main promise to convey the land and are not inconsistent with the deed as given are not necessarily merged in the deed, but may survive it and be enforced after the deed is given.” Id. at 719, 59 N.E.2d 289.

The claim in Pybus had to do with an alleged defect in the seller's title to the property, so the exception was inapplicable. In Lipson and Holihan, however, the exception was the basis for the decisions. In both cases, the purchase and sale agreement required conveyance of real estate and construction of a house....

To continue reading

Request your trial
6 cases
  • Bridgwood v. A.J. Wood Constr., Inc.
    • United States
    • United States State Supreme Judicial Court of Massachusetts Supreme Court
    • August 29, 2018
    ...G. L. c. 93A, that use "gist of the action" to determine whether the statute of repose applies. For example, in Kelley v. Iantosca, 78 Mass. App. Ct. 147, 935 N.E.2d 783 (2010), the Appeals Court held that, to the extent the plaintiff alleged that the defendants violated G. L. c. 93A throug......
  • Audubon Hill S. Condo. Ass'n v. Cmty. Ass'n Underwriters of Am., Inc.
    • United States
    • Appeals Court of Massachusetts
    • September 20, 2012
    ...Once he acknowledged the causal role of earth movement, the loss moved out of the policy coverage. See, e.g., Kelley v. Iantosca, 78 Mass.App.Ct. 147, 155, 935 N.E.2d 783 (2010) (if it is clear from the record that a loss falls squarely within a stated policy exclusion, denial of coveragean......
  • Lennar Ne. Props., Inc. v. Barton Partners Architects Planners Inc.
    • United States
    • U.S. District Court — District of Massachusetts
    • January 22, 2021
    ...was barred to the extent that it focused on the defendants' alleged acts or omissions during the construction process. 935 N.E.2d 783, 789 (Mass. App. Ct. 2010); see also Bridgwood, 105 N.E.3d at 231 ("[Plaintiff's] claim is essentially that the defendants failed to perform the electrical w......
  • Murphy v. Mass. State Police
    • United States
    • Appeals Court of Massachusetts
    • January 14, 2015
    ...defendants is unclear, we think that the amended complaint was properly dismissed for a different reason. See Kelley v. Iantosca, 78 Mass. App. Ct. 147, 150 (2010). We conclude that the amended complaint, as presented and on its face, failed to pass muster under Mass.R.Civ.P. 12(b)(6), 365 ......
  • Request a trial to view additional results
2 books & journal articles
  • Chapter 4
    • United States
    • Full Court Press Business Insurance
    • Invalid date
    ...Insurance Co., 899 So.2d 1082 (Fla. 2005) (exclusion inapplicable to loss caused by blasting). Massachusetts: Kelley v. Iantosca, 78 Mass. App. Ct. 147, 935 N.E.2d 783 (2010). Nevada: Powell v. Liberty Mutual Fire Insurance Co., 252 P.3d 668 (Nev. 2011). New York: Wilner v. Allstate Insuran......
  • CHAPTER 4 First-Party Insurance
    • United States
    • Full Court Press Insurance for Real Estate-Related Entities
    • Invalid date
    ...Insurance Co., 899 So.2d 1082 (Fla. 2005) (exclusion inapplicable to loss caused by blasting). Massachusetts: Kelley v. Iantosca, 78 Mass. App. Ct. 147, 935 N.E.2d 783 (2010). Nevada: Powell v. Liberty Mutual Fire Insurance Co., 252 P.3d 668 (Nev. 2011). New York: Wilner v. Allstate Insuran......

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT